| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAccepted-AOC | ₹24.3 L Quoted ₹21.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹23.7 LRejected-AOC | ₹23.7 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/S. SUGANYA ENTERPRISES L1 | V.R. ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00NCTPS–I - CM-circle – CM-II- Construction of two numbers of Box culvert at eastern side approach ramp of Ash dyke. | |||||
| 1.01 | Earthwork excavation in all soils with initial lead of 10m and lift of 2m including labour, T&P, etc., complete.omplete. | 46.5 | cum | 92 ₹4,278 | 95 ₹4,417.50 |
| 1.02 | Providing PCC 1:3:6 using 40mm HBG stone for box culvert including cost of all material, lead, lift, curing, etc., complete and as directed by the Engineer at site. | 12.7 | cum | 6,500 ₹82,550 | 6,750 ₹85,725 |
| 1.03 | Supplying and providing steel reinforcement for concrete work including cost of all materials lead, lift, transporting charges, cutting, bending, tying and placing in position, etc., complete and as directed by the Engineer at site | 11,400 | Kg | 94 ₹10.7 L | 100 ₹11.4 L |
| 1.04 | Providing RCC 1:1.5:3 using 12 and 20mm HBG broken stone for box culvert near Eastern side ramp at Primary Pond-II of Ash dyke including cost of all materials, lead, lift, shuttering charges, curing charges etc., complete and as directed by the Engineer at site. | 76 | cum | 12,500 ₹9.5 L | 15,000 ₹11.4 L |
Tender Value
₹25.0 L
EMD Value
₹24,900
Closing Date
26 Jun 2025, 2:00 pmClosed
SE/CM/NCTPS-I
NCTPS-I Chennai -120
Construction of two numbers of Box culvert at eastern side approach ramp of Ash dyke.
2025_EB_567799_1
CE /NCTPS-I/SE/ CM/25/2025-26
Open Tender
Civil Works
60 days
CE/NCTPS-I
Refertenderdocument
2 documents required · 2 mandatory
₹0
₹24,900
Yes
29 May 2026
12 Jun 2025
27 Jun 2025
12 Jun 2025
26 Jun 2025
12 Jun 2025
Amount
NCTPS–I - CM-circle – CM-II- Construction of two numbers of Box culvert at eastern side approach ramp of Ash dyke.
Earthwork excavation in all soils with initial lead of 10m and lift of 2m including labour, T&P, etc., complete.omplete.
Providing PCC 1:3:6 using 40mm HBG stone for box culvert including cost of all material, lead, lift, curing, etc., complete and as directed by the Engineer at site.
Supplying and providing steel reinforcement for concrete work including cost of all materials lead, lift, transporting charges, cutting, bending, tying and placing in position, etc., complete and as directed by the Engineer at site
Providing RCC 1:1.5:3 using 12 and 20mm HBG broken stone for box culvert near Eastern side ramp at Primary Pond-II of Ash dyke including cost of all materials, lead, lift, shuttering charges, curing charges etc., complete and as directed by the Engineer at site.
V.R. ENTERPRISES (BID ID -1373048)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid