Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-AOC | 1 | Accepted-AOC The lowest rate quoted by the contractor A.THANGARASU | |
| 2 | 2₹3.6 L+₹11,126.53 (3.15%)Rejected-Finance | 2 | Rejected-Finance higher bidder value | |
| 3 | 3₹3.7 L+₹13,024.17 (3.68%)Rejected-Finance | 3 | Rejected-Finance higher bidder value | |
| 4 | 4₹3.8 L+₹26,814.97 (7.59%)Rejected-Finance | 4 | Rejected-Finance higher bidder value |
| Sl No | Description | Qty | Unit | A.THANGARASU L1 | M.KOTHANDAM L4 | SRK ENTERPRISES L3 | M/S.REVATHY CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and removing Heavy jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard. | 585 | sqm | 6 ₹3,510 Lowest | 9 ₹5,265 | 8.32 ₹4,867.2 | 8.28 ₹4,843.8 |
| 2.00 | Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete | 4,119 | cum | 53 ₹2,18,307 Lowest | 58 ₹2,38,902 | 55.86 ₹2,30,087.34 | 55.57 ₹2,28,892.83 |
| 3.00 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B | 4.5 | cum | 243 ₹1,093.5 | 249 ₹1,120.5 | 239.12 ₹1,076.04 | 237.89 ₹1,070.5 Lowest |
| 4.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation | 1.5 | cum | 5,040 ₹7,560 | 5,047 ₹7,570.5 | 4,894.41 ₹7,341.61 | 4,869.18 ₹7,303.77 Lowest |
| 5.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 36 | sqm | 512 ₹18,432 | 519 ₹18,684 | 501.01 ₹18,036.36 | 498.42 ₹17,943.12 Lowest |
| 6.00 | Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation | 9.45 | cum | 5,362 ₹50,670.9 | 5,371 ₹50,755.95 | 5,206.59 ₹49,202.28 | 5,179.75 ₹48,948.64 Lowest |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 53,923.21 ₹53,923.21 Lowest | 58,013.63 ₹58,013.63 | 55,909.95 ₹55,909.95 | 55,620.48 ₹55,620.48 |
Tender Value
₹3.9 L
EMD Value
₹3,850
Closing Date
15 Apr 2025, 3:00 pmClosed
Block Development Officer (VP) Acharapakkam
Block Development Office (VP) Acharapakkam
Desilting of Kudineer kulam with Toewall in Orathy village at Orathy Panchayat at Acharapakkam Panchayat Union in Chengalpattu District Under AGAMT II
2025_RDTN_540265_1
DIPR/4846/A10/2024
Open Tender
Civil Works
Item Rate
90 days
Orathy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,850
Yes
Block Development Office (VP) Acharapakkam
19 Aug 2025
7 Apr 2025
15 Apr 2025
7 Apr 2025
15 Apr 2025
7 Apr 2025
7 Apr 2025
Amount
Clearing and removing Heavy jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M/S.REVATHY CONSTRUCTIONS (BID ID -1297701)
SRK ENTERPRISES (BID ID -1297996)
M.KOTHANDAM (BID ID -1293590)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_643440.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .