Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.9 LAccepted-AOC 144 GHAFFAR MANZIL OKHLA JAMIA NAGAR NEW DELHI 25 | SOUTH EAST | DELHI | 110025 | ₹35.9 L | L1 | Accepted-AOC Accepted-Finance |
| 2 | L2₹40.3 LRejected-Finance | ₹40.3 L | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹44.5 LRejected-Finance | ₹44.5 L | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹45.0 LRejected-Finance | ₹45.0 L | L4 | Rejected-Finance Not Lowest |
Tender Value
₹45.1 L
EMD Value
₹4.3 L
Closing Date
31 Mar 2026, 12:00 pmClosed
Superintending Engineer Deoria Circle PWD Deoria
Office of The Superintending Engineer Deoria Circle PWD Deoria
Renewal of Kasaya Ramkola to Airport Administrative Building Link Road -By HMP- in Dist Kushinagar
2026_CEGKP_1129472_2
1245/76yat-Deo Circle/26 Dated 17.03.2026
Open Tender
Civil Works
90 days
Kushinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹4.3 L
Deoria
22 May 2026
25 Mar 2026
31 Mar 2026
25 Mar 2026
31 Mar 2026
25 Mar 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Wet Mix macadam(Plant mix method)
Providing, laying, spreading and compacting stone aggregates from approved quarry to Wet Mix macadam specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layer with paver in sub basae/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORTH specification 406.(Excluding GST). | - | cum | - | - | |
Tack Coat
Providing and applying tack coat ( over bituminous surface) with bitumen (VG-10) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. As perSr No. 5.2 & MoRT&H Specification Ref. No. 503 (Including Cost of bitumen )(Excluding GST). | - | Sqm. | - | - | |
Bituminous Concrete:-
Providing and laying bituminous concrete with 60-90 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG 30) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction As per Sr No. 5.8 & MoRT&H Specification Ref. No. 509 (Including Cost of bitumen )(Excluding GST). | - | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.59 MB
Tendernotice_2.pdf
PDF • 4.24 MB
BOQ_2108116.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid