Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | -26.95% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 L+₹1,048.22 (0.62%)Admitted-Finance | -26.50% | ₹1.7 L+₹1,048.22 (0.62%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹27,835.95 (16.4%)Admitted-Finance | -15.00% | ₹2.0 L+₹27,835.95 (16.4%) | L3 | Admitted-Finance |
| 4 | L3₹2.0 L+₹27,835.95 (16.4%)Admitted-Finance | -15.00% | ₹2.0 L+₹27,835.95 (16.4%) | L3 | Admitted-Finance |
Tender Value
₹2.3 L
EMD Value
₹4,659
Closing Date
9 Sept 2026, 6:00 pmClosed
DFO POONCH
Forest Complex Poonch
As per Nit and BoQ
2026_FD_323427_4
e-NIT No. 16 of 2026-27
Open Tender
Agricultural or Forestry
Percentage
90 days
POONCH
Kindly refer attachment
2 documents required · 2 mandatory
₹500
DFO POONCH
₹4,659
Yes
14 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Fencing (1400 rft, Ha) | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. | 650.56 | Sqm | 12.49 | ₹8,125.49 |
| 1.02 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 11.31 | Cum | 479.3 | ₹5,420.88 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) Crushed | 2.23 | Cum | 4,826.5 | ₹10,763.1 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size) Crushed | 4.74 | Cum | 6,591.25 | ₹31,242.53 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete | 65.06 | Sqm | 286.35 | ₹18,629.93 |
| 1.06 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 4.96 | cum | 218.4 | ₹1,083.26 |
| 1.07 | Finishing walls with water proofing cement paint of required shade on new work (two or more coats applied @ 3.84 kg/10 sq.m) | 75.53 | Sq.m | 98.75 | ₹7,458.59 |
| 1.08 | Supply of precast cement conc. poles of size 75 mm x 75 0mm x1800 mm
(including Carriage) | 147.5 | Each | 250 | ₹36,875 |
| 1.09 | Erecting c.conc. Poles in position.Qty vide item no.7 | 147.5 | Each | 30 | ₹4,425 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_1088385.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .