Loading…
Loading…
Tender Value
₹53.9 L
EMD Value
₹1.1 L
Closing Date
12 Jun 2026, 5:00 pm7d left
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Boundary wall for Primary school in village Niloni YEA WC-06
2026_YEIDA_1155182_33
YEA/GM(PROJECT)/2026/512 DT-27/05/2026
Open Tender
Civil Works
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,719
₹1.1 L
2 Jun 2026
2 Jun 2026
15 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechnical means (hydraulic excavation) manual means in foundation trenches or drain (not exceeding 1.5 m in width) or 10 Sqm on plain including dressing of sides remaining bottom, lift upto1.5 m including getting out the excavated earth and disposal of surplus excavated soil as per direction of engg. in charge with in lead upto 50 m DAR 2.8.1 | - | Cum | 1 | - |
| 2 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | 1 | Cum | - | - |
| 3.01 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) | 1 | Sqm | - | - |
| 3.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. (DAR/5.9.5/Based on UPPWD/SOR-2020)) | 1 | Sqm | 1 | ₹1 |
| 3.03 | Columns, Pillars, Piers, Abutments, Posts and Struts. (DAR/5.9.6/Based on UPPWD/SOR-2020)) | - | Sqm | - | - |
| 4Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto Plinth Level: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (DAR 5.1.2/ UPPWD SOR 2020) | |||||
| 5 | Reinforced Cement concrete work in walls (any Thickness ), including attatched Pilasters, Buttresses, plinth and String courses , fillets , columns, pillars piers, abutments , posts and struts etc. upto Floor V Level, Excluding the cost of Centring , Shuttring, Finishing and Reinforcement: (Cast in situ) 1:1.5:3 (1 Cement : 1.5Coarse Sand: 3 Graded Stone Aggregete 20mm Nominal Size) (DAR 5.2.2/ UPPWD SOR 2020) | 0.12 | Cum | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more./Cold twisted bars. (DAR/5.22.6/Based on UPPWD/SOR-2020)) | 0.8 | Kg | 1 | ₹0.8 |
| 7M-150 brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/303+(305) | |||||
| 8M-150 brick work in 1:4 cement and Coarse sand mortar in Super Structure above plinth level upto Floor V Level In all Shapes and Sizes. including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/303+(305) | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
33.pdf
Tender Documents • 1.57 MB
BOQ_2166125.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid