Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹38,653.63Admitted-Finance | -15.11% | ₹38,653.63 | L1 | Admitted-Finance |
| 2 | L2₹47,810.47Admitted-Finance | +5.00% | ₹47,810.47 | L2 | Admitted-Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
26 Feb 2026, 6:00 pmClosed
EE, PHED, Distt. Dn. II, Bikaner
EE, PHED, Distt. Dn. II, Bikaner
Rate contract for Lowering- Unlowering Tubewells at various WSS Urban and Rural for summer 2026 under District Rural Dn. II, Bikaner
2026_PHCJA_539401_1
EE/PHED/D2/2025-26/205
Open Tender
Civil Works - Water Works
180 days
BIKANER
AS PER TD
2 documents required · 2 mandatory
₹1,000
EE, PHED, Distt. Dn. II, Bikaner
₹30,000
Yes
7 Mar 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
26 Feb 2026
17 Feb 2026
PART A :-
Unlowering of submersible pump set along with lowering pipes with depth up to 150 mtr and submersible cable with safety from tube well, checking the pump set, transportation of pump set from tube well site to store as direction, receiving repaired / new pump set from store/ divisional store , testing the same, transportation to site and lowering back into tube well along with submersible cable, lowering pipes, specials etc and commissioning of the tube well. The job also includes cable jointing, checking of discharge of pump set, interconnection of lowering pipe from nearby distribution pipe line, checking of starter and reporting for completion of Job or fault/problem if any.
For three Phase pump set
G.I. Double Flanged Pipe Lowering Assembly of nominal dia
HDPE Pipe Lowering Assembly of nominal dia
Add above item 1.1 for depth above 120 mtr for each 10 mtr depth
For single Phase pump set
G.I. Double Flanged Pipe Lowering Assembly of nominal dia
HDPE Pipe Lowering Assembly of nominal dia
Add above item 1.1 for depth above 150 mtr for each 10 mtr depth
Only unlowering of submersible pump set along with lowering pipes depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, reporting and transportation of pump set from tube well site to store as per direction.
For three phase pump set
G.I. Double Flanged Pipe Lowering Assembly of nominal dia
HDPE Pipe UnLowering Assembly of nominal dia
Add above item 2.1 for depth above 120 mtr for each 10 mtr depth
For single Phase pump set
G.I. Double Flanged Pipe Lowering Assembly of nominal dia
HDPE Pipe Lowering Assembly of nominal dia
Only lowering of the submersible pump set into tube well along with submersible cable, lowering pipes depth up to 120 mtr, specials etc and commissioning of the tube well. The job also includes cable jointing, checking of discharge of pump set, interconnection of lowering pipe from nearby distribution pipe line, checking of starter and reporting for completion of Job or fault/problem if any.
For three phase pump set
G.I. Double Flanged Pipe Lowering Assembly of nominal dia
HDPE Pipe Lowering Assembly of nominal dia
Add above item 3.1for depth above 120 mtr for each 10 mtr depth
For single Phase pump set
G.I. Double Flanged Pipe Lowering Assembly of nominal dia
HDPE Pipe Lowering Assembly of nominal dia
Add above item 1.1 for depth above 150 mtr for each 10 mtr depth
Increasing of lowering pipes in tube wells including cost of nut bolts and rubber gaskets / jointing material and PVC rope and transporatation of cable and extra lowering pipe from store.. However submersible cable and extra lowering pipe shall be provided by the department at store.
For three phase pump set
G.I. Double Flanged Pipe Lowering Assembly of nominal dia
HDPE Pipe Lowering Assembly of nominal dia
For single Phase pump set
G.I. Double Flanged Pipe Lowering Assembly of nominal dia
For Increase 2 nos.Assembly pipe
HDPE Pipe Lowering Assembly of nominal dia
For Increase 20 Mtr Assembly pipe
Add above item for depth above 20 mtr or two D/F pipe assembly for each 10 mtr depth
Unlowering of pump set along with lowering pipes and submersible cable with safety from Openwell For three Phase pump set having G.I double flanged/ HDPE pipe lowering asembly of size 50 mm to 80 mm, checking the pump set, reporting and transportation of pump set from tube well site to store.
Lowering of repaired/New pump set along with lowering pipes and submersible cable with safety in Openwell For three Phase pump set having G.I double flanged/ HDPE pipe lowering asembly of size 50 mm to 80 mm. It includes receiving repaired / new pump set from store / Work shop with in boundry area of division and testing the same, transportation to site and commissioning.
Minor and Major Repair of Hand Pump
Job Work for Successful Repairing of All type of Handpump without material.
Minor Repair without unlowering and lowering of assembly pipes (Replacement or Repair of Chain, Handle, Handle Assembly, Water Tank, Bearing, Greasing etc.including welding and lathe work if any.)
Major Repair with unlowering and lowering of 32/ 50 mm GI pipes assembly including minor repair if any. Work also includes transportation of all material from store to work point and depositing unservicable material to store. Work can be done by lowering machine/ chain pulley/ any system.
Repair of handpump when pipe assembly is jammed/fallen in the bore and to be taken out with help of tripod and chain pulley block etc.
Removing abandoned handpump including dismantling of platform, cutting of casing pipe minimum upto 0.3 m depth below ground level , depositing taken out material to store, filling bore with stone or earth and surface dressing.
Deduct from item no 2.9 if relowering of assembly is not done
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
TD_205.pdf
Tender Documents • 1.87 MB
BOQ_961763.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid