Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical AT JHARPADA P O KANAK P S KANAK DIST PURI PIN 752017 | KANAK | PURI | ODISHA | 752017 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical PLOT NO 537 538 STREET MARKET LANE KHORDHA VILLAGE GP WARD WARD NO 14 PO PS KHORDHA DIST KHORDHA | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
21 Sept 2026, 5:00 pmClosed
CCE Khordha RandB Circle Khordha
O/o the Chief Construction Engineer Khordha R and B Circle Khordha
Construction of Office Building of Assistant Labour Officer, Jatni in the District of Khordha for the year 2026-27
2026_EICCL_139931_1
CCE-Khordha R and B Circle-6-26-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Khordha
3 documents required · 3 mandatory
₹10,000
₹1.8 L
Yes
22 Sept 2026
2 Sept 2026
22 Sept 2026
2 Sept 2026
21 Sept 2026
2 Sept 2026
2 Sept 2026 - 21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
A/R-P 196/item No-3. :Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Ground Floor | 536.86 | sqm | 8.63 | ₹4,633.1 |
| 2 | Earth work in excavation hard soil in foundation with initial lead and lift including rough dressing and breaking the clods to maximum 5cm to 7cm in size and laying the layers notexceeding 0.30m in depth as per specification and approved by the department.
Ground Floor | 294.11 | cum | 282.88 | ₹83,197.84 |
| 3 | Earth work in excavated earth from work side for filling and carriage of earth by mechanical means of Borrowpit Earth with average lead of 5km including loading and uncloading at road alignment including dressing and levelling & approved profile complete as per direction of the Engineer-in-charge
APPROACH ROAD & PERIPHERAL DEVELOPMENT | 185.47 | cum | 274.61 | ₹50,931.92 |
| 4 | A/R-P 8/item No.14 -Back filling of excavated earth at foundation including the cost of labour ,T&P etc. complete as directed by the Engineer in Charge.
Ground Floor | 196.07 | cum | 157.16 | ₹30,814.36 |
| 5 | Supplying Filling foundation and plinth (F&P) with sand well watered and rammed including all cost and complete finished in all respect as per direction of the Engineer-in-charge.
Ground Floor | 164.57 | cum | 869.67 | ₹1,43,121.59 |
| 6 | Providing & applying Post constrution of Antitermite treatment by drilling 12 mm dia holes at a distance of 30cm@ junction of wall and floor about 300mm apart deep enough to each the soil below and chemical emulsion(PREMISE,IMIDACHLOPRIED 30.5SC OF BAYER MAKE mixed with475 ltr water) pumped these holes to soak the soil @1Ltr solution of each holea as per manufactures specification and the holes should be pluged with filling materials including cost of all materials,labour charges,conveyance and all taxes and hiring charges of machinaries as per direction of Engineer in charges.
Ground Floor | 231.64 | sqm | 104.5 | ₹24,206.38 |
| 7 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6") thick to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete i as per direction of the Engineer-in-charge.
Ground Floor | 52.47 | cum | 6,203.58 | ₹3,25,501.84 |
| 8 | Plain Cement concrete M20 grade using 20mm down graded size h.g chips including cost of all materials etc complete.
Ground Floor | 4.48 | cum | 6,222.1 | ₹27,875.01 |
| 9 | First Floor | 3.08 | cum | 6,346.89 | ₹19,548.42 |
| 10 | Terrace Floor | 1.58 | cum | 6,490.41 | ₹10,254.85 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.12 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_607855.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .