| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC CHINNAMPALAYAM POLLACHI | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.6 L+₹1.3 L (8.97%)Rejected-Finance 44 82 LIG COLONY 1 MAHALINGAPURAM POLLACHI | COIMBATORE | TAMIL NADU | 638459 | L2 | Rejected-Finance L2 |
Tender Value
₹18.2 L
EMD Value
₹19,000
Closing Date
22 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director
DRDA COIMBATORE
Coimbatore District Providing 7 Nos of works in School Infrastructure developement under AGAMT II 2021 2022 PKG No 3 AGAMT II 2021 22 at Anaimalai Block
2022_RDTN_238668_1
Roc No 1006/2022/A2 Date 20.06.2022
Open Tender
Civil Works
Item Rate
90 days
Anaimalai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹19,000
DRDA COIMBATORE
29 Nov 2022
1 Jul 2022
22 Aug 2022
1 Jul 2022
22 Aug 2022
1 Jul 2022
7 Jul 2022
Amount
1.Construction of Toilet for Girls P.U Ele School @ Authupollachi H/o Authupollachi panchayat
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Fabrication and Supply of MILD STEEL DOOR
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:5 (one cement and three sand ) 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Dadooring in CM 1:2 mix using any colour glazed tiles including all charges et., complete
Paving the floor with scratch proof ceramic tiles of any colour laid in CM 1:2, 20mm thick and pointing with white cement using 0.4 kg/Sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joint neatly complying with standard specification and as directed by the departmental officers. The ceramic tiles should be got approved from the departmental officers before execution-10 Sqm
Oil Distempering two coats using best Oil Distemper including cost of Oil Distemper scaffolding charges etc., complete with standard specifications
Painting two coats with approved Emulsion over one priming coat of Emulsion over cement plastered Wall surface and ceiling including cleaning preparing the surface and curing etc. complete complying with standard specifications and as directed by the departmental officers.
Painting two coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
Supply and fixing of Cudappah slab etc.,
2.Construction of panchayat union Elementry school staff Toilet @Authupollachi H/o Authupollachi pt
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Dadooring in CM 1:2 mix using any colour glazed tiles including all charges et., complete
scratch proof ceramic tiles of size 305 X305x6mm cost and conveyance of all materuaks ti site and all labour charges etc complete
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:3 (one cement and three sand ) 10mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with approved Emulsion over one priming coat of Emulsion over cement plastered Wall surface and ceiling including cleaning preparing the surface and curing etc. complete complying with standard specifications and as directed by the departmental officers.
Supplying and fixing in postion best quality Indian Water Closet (IWC) incl cost & conveyance etc., complete.,
Supply and fixing of wash basin with glass including cost and conveyance etc., complete as per std specification
Supply and fixing of PVC Door of size 0.75*2.10m including cost and conveyance etc., complete as per std specification
Supply and fixing of RCC Jolly of size 0.45*0.30m including cost and conveyance etc., complete as per std specification
3.Construction of Toilet for Girls P.U Ele School @ Chellapillaikaradu H/o Kaliyapuram panchayat
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Fabrication and Supply of MILD STEEL DOOR
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:5 (one cement and three sand ) 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Dadooring in CM 1:2 mix using any colour glazed tiles including all charges et., complete
Paving the floor with scratch proof ceramic tiles of any colour laid in CM 1:2, 20mm thick and pointing with white cement using 0.4 kg/Sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joint neatly complying with standard specification and as directed by the departmental officers. The ceramic tiles should be got approved from the departmental officers before execution-10 Sqm
Oil Distempering two coats using best Oil Distemper including cost of Oil Distemper scaffolding charges etc., complete with standard specifications
Painting two coats with approved Emulsion over one priming coat of Emulsion over cement plastered Wall surface and ceiling including cleaning preparing the surface and curing etc. complete complying with standard specifications and as directed by the departmental officers.
Painting two coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
Supply and fixing of Cudappah slab etc.,
4.Construction of panchayat union Elementry school staff Toilet @Chellapillaikaradu H/o Kaliyapuram pt
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Dadooring in CM 1:2 mix using any colour glazed tiles including all charges et., complete
scratch proof ceramic tiles of size 305 X305x6mm cost and conveyance of all materuaks ti site and all labour charges etc complete
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:3 (one cement and three sand ) 10mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with approved Emulsion over one priming coat of Emulsion over cement plastered Wall surface and ceiling including cleaning preparing the surface and curing etc. complete complying with standard specifications and as directed by the departmental officers.
Supplying and fixing in postion best quality Indian Water Closet (IWC) incl cost & conveyance etc., complete.,
Supply and fixing of wash basin with glass including cost and conveyance etc., complete as per std specification
Supply and fixing of PVC Door of size 0.75*2.10m including cost and conveyance etc., complete as per std specification
Supply and fixing of RCC Jolly of size 0.45*0.30m including cost and conveyance etc., complete as per std specification
Name of the Work :. 7.Construction of P.U.El School Staff Toilet at Paruthiyur H/O Arthanaripalayam
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Brick Work in CM 1:5 mix using 2nd Class Bricks(9"x41/2"x3") 23x11.5x7.5cm including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2
scratch proof ceramic tiles of size 305x305x6mm cost and conveyance of all materials to site and all labour charges etc complete
Supplying and erecting centering shuttering for sides including all labour charges etc
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Plastering with cement mortar 1:5 mix with 12 mm thick including all charges
Plastering with cement mortar 1:3 mix with 10 mm thick including all charges
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and fixing in postion best quality Indian Water Closet (IWC) incl cost & conveyance etc., complete.,
Supply and fixing of wash basin with glass including cost and conveyance etc., complete as per std specification
Supply and fixing of PVC Door of size 0.75*2.10m including cost and conveyance etc., complete as per std specification
Supply and fixing of RCC Jolly of size 0.45*0.30m including cost and conveyance etc., complete as per std specification
Name of the Work :. 8.Construction of P.U.Middle School Staff Toilet at Arthanaripalayam H/O Arthanaripalayam
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Brick Work in CM 1:5 mix using 2nd Class Bricks(9"x41/2"x3") 23x11.5x7.5cm including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2
scratch proof ceramic tiles of size 305x305x6mm cost and conveyance of all materials to site and all labour charges etc complete
Supplying and erecting centering shuttering for sides including all labour charges etc
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Plastering with cement mortar 1:5 mix with 12 mm thick including all charges
Plastering with cement mortar 1:3 mix with 10 mm thick including all charges
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and fixing in postion best quality Indian Water Closet (IWC) incl cost & conveyance etc., complete.,
Supply and fixing of wash basin with glass including cost and conveyance etc., complete as per std specification
Supply and fixing of PVC Door of size 0.75*2.10m including cost and conveyance etc., complete as per std specification
Supply and fixing of RCC Jolly of size 0.45*0.30m including cost and conveyance etc., complete as per std specification
Name of the Work :. Construction of P.U.Ele School Staff Toilet@Pilchinnamplaayam H/O Pilchinnampalayam Panchayat
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Brick Work in CM 1:5 mix using 2nd Class Bricks(9"x41/2"x3") 23x11.5x7.5cm including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2
scratch proof ceramic tiles of size 305x305x6mm cost and conveyance of all materials to site and all labour charges etc complete
Supplying and erecting centering shuttering for sides including all labour charges etc
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Plastering with cement mortar 1:5 mix with 12 mm thick including all charges
Plastering with cement mortar 1:3 mix with 10 mm thick including all charges
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and fixing in postion best quality Indian Water Closet (IWC) incl cost & conveyance etc., complete.,
Supply and fixing of wash basin with glass including cost and conveyance etc., complete as per std specification
Supply and fixing of PVC Door of size 0.75*2.10m including cost and conveyance etc., complete as per std specification
Supply and fixing of RCC Jolly of size 0.45*0.30m including cost and conveyance etc., complete as per std specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S PARTHIBARAJAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .