Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC WORK AWARDED |
| 2 | L2₹1.5 Cr+₹5.2 L (3.60%)Rejected-Finance SFNO 73 UTHUKULI ROAD MANNARAI TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹1.5 Cr+₹5.2 L (3.60%) | L2 | Rejected-Finance SECOND LOWEST |
| 3 | L3₹1.5 Cr+₹6.4 L (4.42%)Rejected-Finance | ₹1.5 Cr+₹6.4 L (4.42%) | L3 | Rejected-Finance THIRD LOWEST |
Tender Value
₹1.4 Cr
EMD Value
₹81,000
Closing Date
15 Mar 2024, 3:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SE., PWD BUILDINGS CIRCLE VELLORE
Providing Temporary Illumination, Fire Safety Alarm, Security Lighting, Standby Generator, PAS to Strong room and Counting Hall for General Election to Lok Sabha 2024 at No.7 Arakkonam Parliamentary Constituency Counting Centre at walaja
2024_PWD_447746_1
24/VLR-CLE/23-24-3/DT.05.03.24
Open Tender
Electrical Works
Lump-sum
60 days
WALAJA IN RANIPET DISTRICT
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹81,000
11 Jun 2024
13 Mar 2024
15 Mar 2024
13 Mar 2024
15 Mar 2024
13 Mar 2024
Amount
Hire and labour charges for supply,fixing and dismantling of 200W LED fitting with suitable cross arm on existing support (one trial day and 1 end days ) (SR) (for 2 Days)
Hire and labour charges for maintaining of 200W LED fitting from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling of Pedastal Fan on existing support (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of Pedastal Fan from (for 28 Days)
Hire and labour charges for supply, fixing and dismantling 48" Ceiling fan on the existing clamp or support (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 48" Ceiling fan from (for 28 Days)
Hire and labour charges for supply, fixing and dismantling of 4'40W patty tube light on the existing clamp or support (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 4'40W patty tube light from (for 28 Days)
Hire and labour charges for supply, fixing and dismantling of 15A / 5A plug sets (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 5A / 5A plug sets from (for 28 Days)
Hire and labour charges for supply, fixing and dismantling of 20A AC plug sets (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 20A AC plug sets from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 3 1/2 x 150 sqmm LTUG Cable (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 3 1/2 x 150 sqmm LTUG Cable from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 3 1/2 x 120 sqmm LTUG Cable (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 3 1/2 x 120 sqmm LTUG Cable from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 3 1/2 x 70 sqmm LTUG Cable (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 3 1/2 x 70 sqmm LTUG Cable from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 3 1/2 x 50 sqmm LTUG Cable (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 3 1/2 x 50 sqmm LTUG Cable from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 4 of 17/19 sq mm wire (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 4 of 17/19 sq mm wire from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 4 of 19/16 sq mm wire (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 4 of 19/16 sq mm wire from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 4 of 7/16 sq mm wire (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 4 of 7/16 sq mm wire from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 4 of 19/18 sq mm wire (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 4 of 19/18 sq mm wire from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 4 of 7/18 sq mm wire (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 4 of 7/16 sq mm wire from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 2 of 7/20 wire (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 2 of 7/20 wire from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 2 of 2.5 sqmm wire (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 2 of 2.5sqmm wire from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 2 of 4 sqmm wire (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 2 of 4sqmm wire from (for 28 Days)
Hire and labour charges for supply run off and dismantling of 2 of 6 sqmm wire (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 2 of 6 sqmm wire from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling of Public address system with necessary - Mic -2Nos, Amplifier - 1No and speaker - 2 Nos etc., (trial day and end day) (for 2 Days)
Hire and labour charges for maintaining of Public address system with necessary - Mic -2Nos, Amplifier - 1No and speaker - 2 Nos etc., on (for 4 Days)
Hire and labour charges for supply,fixing and dismantling of Earth pipe (one trial day and 1 end days) (for 2 Days)
Hire and labour charges for maintaining of Earth pipe from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling of 6mtr GI post for Focus light fitting (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of of 6mtr GI post for Focus light fitting from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling 100A Panel Board with 100A TPN Switch & 5 Nos. 30A TPN switch with Bus Bar (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 100A Panel Board with 100A TPN Switch & 5 Nos. 30A TPN switch with Bus Bar from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling 250A Panel Board with 250A TPN Switch & 7 Nos. 63A DPMCB switch(one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 250A Panel Board with 250A TPN Switch & 7 Nos. 63A DPMCB switch from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling 63A Distribution Board with 63A TPN MCB & 18 Nos. 10-32A SP MCB Switch (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 63A Distribution Board with 63A TPN MCB & 18 Nos. 10-32A SP MCB Switch from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling of 12 way SP MCB Distribution Board with 32A SPN MCB & 10 Nos. 10-32A SP MCB Switch (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of12 way SP MCB Distribution Board with 32A DP MCB & 10 Nos. 10-32A SP MCB Switch from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling of 200A Meter board with 3 Nos 200A Fuse carrier (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 200A Meter board with 3 Nos 200A Fuse carrier from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling of Exhaust Fan (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of Exhaust Fan from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling of 2 KVA inverter with 4 hours backup (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 2 KVA inverter with 4 hours backup from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling 100 A Change over switch for DG Set ( (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 100 A Change over switch from (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for supply,fixing and dismantling 250 A Change over switch for DG Set ( (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 250 A Change over switch from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling 400 A Change over switch for DG Set ( (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 400 A Change over switch from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling of 125 KVA Generator set (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 125 KVA Generator set from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling of 250 KVA Generator set (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for maintaining of 250 KVA Generator set from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling 2 TR split type AC units including erection, gas filling, Testing dismantling and transportation charges (for observer Room) (on trial day ) (for 4 Days)
Hire and labour charges for maintaining of 2 TR split type AC units on (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for supply,fixing and dismantling stabilizer for AC units dismantling and transportation charges (on trial day ) (for 4 Days)
Hire and labour charges for maintaining of stabilizer for AC units on (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for supply,fixing and dismantling of 43' inches LED TV for observers room and Media Centre (one trial day and 1 end days ) (for 4 Days)
Hire and labour charges for maintaining of 43' inches LED TV for observers room and Media Centre on (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for supply,fixing and dismantling of setup box for LED TV to observers room and Media Centre (for 4 Days)
Hire and labour charges for maintaining of setup box for LED TV to observers room and Media Centre on (one trial day and 1 end days ) (for 2 Days)
Hire and labour charges for supply,fixing and dismantling Fire Alarm Panel(4 zone Panel) and transportation charges (on trial day and End day ) (for 2 Days)
Hire and labour charges for maintaining of Fire Alarm Panel(4 zone Panel) from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling Smoke Detector and transportation charges (on trial day and End day ) (for 2 Days)
Hire and labour charges for maintaining of Smoke Detector from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling Manual Call point and transportation charges (on trial day and End day ) (for 2 Days)
Hire and labour charges for maintaining of Manual Call point from (for 28 Days)
Hire and labour charges for supply,fixing and dismantling Hooter and transportation charges(on trial day and End day ) (for 2 Days)
Hire and labour charges for maintaining of Hooter (for 28 Days)
Hire and labour charges for supply,fixing and dismantling 2 Core 1.5 Sqmm Copper Armoured Cable (on trial day and End day ) (for 2 Days)
Hire and labour charges for maintaining of 2 Core 1.5 Sqmm Copper Armoured Cable from (for 28 Days)
GUNASEKARAN
SRINIVASAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .