Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 LAccepted-Finance CHANDRA LOK COLONY WARD NO 1 NAVALPURA KHURJA BULANDSHAHR | HATHRAS | UTTAR PRADESH | 203001 | 1 | Accepted-Finance 1 | |
| 2 | 2₹6.2 L+₹87,570 (16.6%)Rejected-Finance | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | NARENDRA KUMAR SHARMA L1 | M/S BHASKAR SHARMA CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in Silt Clearance including Lift upto 1.5 M and Lead upto 30 M including Ramming and Dressing by Manual Labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-Charge. | 7,510 | Cum | 60 ₹4,50,600 Lowest | 70 ₹5,25,700 |
| 2.00 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. Complete in all respect as directed by Engineer in Charge. | 11,510 | Sqm | 4.5 ₹51,795 Lowest | 5.5 ₹63,305 |
| 3.00 | V.R.B. or bridge clearance in Distributaries/Minors as directed by Engineer in Charge. | 16 | Nos | 600 ₹9,600 Lowest | 660 ₹10,560 |
| 4.00 | Printing Latters upto 10 CM Hight including Material. | 208 | Nos. | 20 ₹4,160 Lowest | 20 ₹4,160 Lowest |
| 5.00 | Finishing walls two coat with waterproofing cement paint of approved make on old surface including cost of all materials, labour including curing of work of work and directed by Engineer-in-charge. | 215 | Sqm | 60 ₹12,900 Lowest | 60 ₹12,900 Lowest |
Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
19 Sept 2026, 12:00 pmClosed
executive engineer
UMBDGC KHURJA
silt clearence work
2026_UPIDC_1185339_8
05/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹11,000
Yes
2 Oct 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Silt Clearance including Lift upto 1.5 M and Lead upto 30 M including Ramming and Dressing by Manual Labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-Charge. | 7,510 | Cum | - | - |
| 2 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. Complete in all respect as directed by Engineer in Charge. | 11,510 | Sqm | - | - |
| 3 | V.R.B. or bridge clearance in Distributaries/Minors as directed by Engineer in Charge. | 16 | Nos | - | - |
| 4 | Printing Latters upto 10 CM Hight including Material. | 208 | Nos. | - | - |
| 5 | Finishing walls two coat with waterproofing cement paint of approved make on old surface including cost of all materials, labour including curing of work of work and directed by Engineer-in-charge. | 215 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2230597.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .