Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25.2 CrAccepted-Finance | 1 | Accepted-Finance Lowest quoted rate |
Tender Value
₹24.1 Cr
EMD Value
₹48.2 L
Closing Date
30 Oct 2023, 6:00 pmClosed
ACE WR Zone Jaipur
O/o Additional Chief Engineer, Water Resources Zone Jaipur, JLN Marg Sinchai Bhawan Jaipur
Rehabilitation of Surwal Medium Irrigation sub-project District Sawai Madhopur RWSLIP
2023_WRDAS_372280_1
ACE NIT 22/2023-24_Surwal_RWSLIP
Open Tender
Civil Works
Item Rate
1095 days
under jurisdiction of Sawai Madhopur Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
as per nit
₹48.2 L
Jaipur
19 Dec 2023
2 Oct 2023
31 Oct 2023
2 Oct 2023
30 Oct 2023
2 Oct 2023
12 Oct 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. (b) thick | 10,47,767.84 | Sqm | 100 | ₹10,47,76,784 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard / dense soil | 40,525.38 | Cum | 100 | ₹40,52,538 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect .Hard /Dense Soil Beyond initial lead of 50m and upto 250m .Add extra for lead beyond 250m & upto 750m (for average 1/2Km). | 11,824.85 | Cum | 10 | ₹1,18,248.5 |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, MorrumBeyond initial lead of 50m and upto 250m .Add extra for lead beyond 250m & upto 750m (for average 1/2Km). | 11,824.85 | Cum | 10 | ₹1,18,248.5 |
| 5 | Add extra for each subsequent lead of 500m or part there of beyond ½ Km and up to 5 km (Total Lead =2.50Km) | 23,649.69 | Cum | 10 | ₹2,36,496.9 |
| 6 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m (½ Km) . | 19,763.37 | Cum | 100 | ₹19,76,337 |
| 7 | Add extra for each subsequent lead of 500m or part there of beyond ½ Km and up to 5 km (Total Lead =5.0Km) | 19,763.37 | Cum | 100 | ₹19,76,337 |
| 8 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 95% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m (½ Km) . Deduct in item no 16 (a) to (d) above if Standard Proctor's density to be achived is at least 95% (Total Lead =2.50Km) For Dam Filling | 6,753.13 | Cum | 10 | ₹67,531.3 |
| 9 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of (ii) at least 98% of Standard Proctor's density | 19,763.37 | Cum | 10 | ₹1,97,633.7 |
| 10 | Watering of earth including cost of carriage of water when source of water up to 1 Km | 1,93,640.52 | Cum | 10 | ₹19,36,405.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_663604.xls
BOQ Document • 0.33 MB
130566419.pdf
Tender Document • 1.40 MB
BidDocumentSurwalRWSLIP.pdf
Tender Document • 3.63 MB
130566421.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .