Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-Finance | L1 | Accepted-Finance RBCM | |
| 2 | L2₹4.0 Cr+₹15.6 L (4.04%)Rejected-Finance | L2 | Rejected-Finance RBCM | |
| 3 | L3₹4.7 Cr+₹81.1 L (21.0%)Rejected-Finance 102 114 MOHADDIPUR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | L3 | Rejected-Finance RBCM | |
| 4 | L4₹4.9 Cr+₹1.0 Cr (26.6%)Rejected-Finance GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | L4 | Rejected-Finance RBCM | |
| 5 | Rejected-Technical VAJIDPUR NIYAY MANIHARI GHAZIPUR | GHAZIPUR | UTTAR PRADESH | 232325 | - | Rejected-Technical RBCM |
| Sl No | Description | Qty | Unit | P P P ANDEY INFRASTRUCTURE PRIVATE LIMITED L2 | M/s VIJENDRA PRATAP SINGH L4 | M/S Krishna Associate L1 | SANJAY KUMAR PANDEY L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | BRIDGE WORK
Providing and Constructing Temporary Island 7 m diameter for Construction of Well Foundation for 4.50 m dia. Well including placing of cutting age under water portion providing 40 cm. above platform from water lavel and its protection by suitable mean and also making plateform for Machinaries including etc. reqd for proper completion of the work. and also including all type of taxes but excluding cess as per specification 12.9A (Morth Specification 1200) of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 2 | No | 1,01,000 ₹2,02,000 Lowest | 1,61,800 ₹3,23,600 | 1,28,002 ₹2,56,004 | 1,61,800 ₹3,23,600 |
| 2.00 | Providing and constructing one span service road to reach island location from one pier location to another pier location for span length 30 m, width of service road 10m and depth of water 1m including cost of material, all labour, T&P etc required for proper completion of the work as per E./I. and also including all type of taxes but excluding cess (12.9C) of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 90 | m | 1,500 ₹1,35,000 Lowest | 3,130 ₹2,81,700 | 2,550.2 ₹2,29,518 | 3,130 ₹2,81,700 |
| 3.00 | Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification and including cost of material, all labour, T&P etc required for proper completion of the work as per E./I. and also including all type of taxes but excluding cess (12.10 ) of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 5.7 | M T | 85,000 ₹4,84,500 | 97,200 ₹5,54,040 | 78,359.2 ₹4,46,647.44 Lowest | 97,200 ₹5,54,040 |
| 4.00 | Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, clayed soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 16.00 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (12.12A+12.12B) (i) Up to 3.0m depth below bed level of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 12 | m | 5,020 ₹60,240 | 5,100 ₹61,200 | 4,116.4 ₹49,396.8 Lowest | 5,100 ₹61,200 |
| 5.00 | Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, clayed soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 16.00 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (12.12A+12.12B) (ii) From depth of 3.0m to 10.0m below bed level of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 28 | m | 5,020 ₹1,40,560 Lowest | 7,500 ₹2,10,000 | 6,051.6 ₹1,69,444.8 | 7,500 ₹2,10,000 |
| 6.00 | Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, clayed soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 16.00 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (12.12A+12.12B) (iii) From depth of 10.0m to 16.10m below bed level of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 24.4 | m | 5,020 ₹1,22,488 Lowest | 9,620 ₹2,34,728 | 7,749 ₹1,89,075.6 | 9,620 ₹2,34,728 |
| 7.00 | Reinforced Cement Concrete, in Well curb /Bottom Plug of M25 Grade complete as per Drawing and Technical Specification. including cost of grit, coarse sand from approved quarry, all labour, T&P etc reqd. for proper completion of the work..and also including all type of taxes but excluding cess (12.11A) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 174.4 | Cum | 8,500 ₹14,82,400 Lowest | 11,100 ₹19,35,840 | 8,839.6 ₹15,41,626.24 | 11,100 ₹19,35,840 |
| 8.00 | Reinforced Cement Concrete, in Well steining /Well Cap /Abutment/Pier shaft and Cap/dirt wall hanging wall and haunches of M30 Grade complete as per Drawing and Technical Specification. including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess .(12.11B) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 1,108.43 | Cum | 9,500 ₹1,05,30,085 | 11,700 ₹1,29,68,631 | 8,888.8 ₹98,52,612.58 Lowest | 10,300 ₹1,14,16,829 |
| 9.00 | Plain Cement Concrete, in Intermediate Plug /Top Plug /approach slab PCC Grade M15 complete including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specification. (12.11D) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 96.48 | Cum | 8,500 ₹8,20,080 | 9,500 ₹9,16,560 | 7,749 ₹7,47,623.52 Lowest | 9,000 ₹8,68,320 |
| 10.00 | Sand Filling in Wells complete including cost Sand from approved quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specifications. 12.21 of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 623.4 | Cum | 120 ₹74,808 Lowest | 160 ₹99,744 | 131.2 ₹81,790.08 | 160 ₹99,744 |
Tender Value
₹5.4 Cr
EMD Value
₹10.8 L
Closing Date
5 Jan 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
CONSTRUCTION WORK OF 3 X 15 METER RCC BRIDGE ON KATHINEIYA DRAIN ON CHAMARSAN TO DEORI ROAD IN SANT KABIR NAGAR DISTRICT
2025_CEUBZ_1102271_1
7449/4E-NIVIDA-BASTI CIRCLE/25-26 DATED-18-12-2025
Open Tender
Civil Works - Bridges
Item Wise
365 days
BASTI
AS PER SBD
2 documents required · 2 mandatory
₹6,255
Yes
₹10.8 L
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
14 Oct 2026
29 Dec 2025
5 Jan 2026
29 Dec 2025
5 Jan 2026
29 Dec 2025
30 Dec 2025
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BRIDGE WORK
Providing and Constructing Temporary Island 7 m diameter for Construction of Well Foundation for 4.50 m dia. Well including placing of cutting age under water portion providing 40 cm. above platform from water lavel and its protection by suitable mean and also making plateform for Machinaries including etc. reqd for proper completion of the work. and also including all type of taxes but excluding cess as per specification 12.9A (Morth Specification 1200) of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 2 | No | 100 | ₹200 |
| 2 | Providing and constructing one span service road to reach island location from one pier location to another pier location for span length 30 m, width of service road 10m and depth of water 1m including cost of material, all labour, T&P etc required for proper completion of the work as per E./I. and also including all type of taxes but excluding cess (12.9C) of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 90 | m | 100 | ₹9,000 |
| 3 | Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification and including cost of material, all labour, T&P etc required for proper completion of the work as per E./I. and also including all type of taxes but excluding cess (12.10 ) of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 5.7 | M T | 10 | ₹57 |
| 4 | Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, clayed soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 16.00 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (12.12A+12.12B) (i) Up to 3.0m depth below bed level of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 12 | m | 10 | ₹120 |
| 5 | Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, clayed soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 16.00 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (12.12A+12.12B) (ii) From depth of 3.0m to 10.0m below bed level of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 28 | m | 10 | ₹280 |
| 6 | Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, clayed soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 16.00 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (12.12A+12.12B) (iii) From depth of 10.0m to 16.10m below bed level of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 24.4 | m | 10 | ₹244 |
| 7 | Reinforced Cement Concrete, in Well curb /Bottom Plug of M25 Grade complete as per Drawing and Technical Specification. including cost of grit, coarse sand from approved quarry, all labour, T&P etc reqd. for proper completion of the work..and also including all type of taxes but excluding cess (12.11A) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 174.4 | Cum | 10 | ₹1,744 |
| 8 | Reinforced Cement Concrete, in Well steining /Well Cap /Abutment/Pier shaft and Cap/dirt wall hanging wall and haunches of M30 Grade complete as per Drawing and Technical Specification. including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess .(12.11B) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 1,108.43 | Cum | 10 | ₹11,084.3 |
| 9 | Plain Cement Concrete, in Intermediate Plug /Top Plug /approach slab PCC Grade M15 complete including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specification. (12.11D) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 96.48 | Cum | 10 | ₹964.8 |
| 10 | Sand Filling in Wells complete including cost Sand from approved quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specifications. 12.21 of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P). | 623.4 | Cum | 10 | ₹6,234 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 1.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
SBD.pdf
Tender Documents • 4.72 MB
BOQ_2032187.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .