Tender ID
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
4 Jun 2026, 2:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
+ Capital Works)
TENDER SEC
14 conditions · 3 needing a document upload
For works costing more than Rs.50 lakhs - The tenderer must have minimum average annual contractual turnover of V/N or 'V' which ever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar Nature of Work : Any Track Work
43 conditions · 3 needing a document upload
Whether required test certificates/ samples, if any have been uploaded?
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society/ Registered Trust / Hindu Undivided Family( HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the requisite documents (including Power of Atorney, if opted) for constitution of their concern as per Cl.14 of GCC-Part-l and as per a) Clause 17 of GCC - Part-1, for JV b) Clause 18 of GCC - Part 1, for Partnership Firm
Copies of the following documents are to be uploaded: (i) Details such as Name of the tenderer/ Contractor, Validity of DSC, Complete address with pin code, Contact Number (ii) Copy of PAN Card (iii) Copy of GSTIN card
A copy of NEFT form duly filled in the details as necessary to be uploaded. (The Tenderer/ Contractor not having NEFT form may down load the empty NEFT form available in document site)
Submission of Annexure-V under Document Verification Certificate- As per Advance Correction Slip No.4 dt.07/08/2023 to GCC - 2022, the tenderers shall submit copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of the certificate to be submitted by the bidder in form of Annexure V. Non-submission of the above Certificate(s) by the bidder shall result in summarily rejection of his/their bid.
Submission of Annexure-V(A) under Document Verification Certificate : In case of other than Company/Proprietary firm, Annexure-V(A) shall also be submitted by the each member of a Partnership Firm/Joint Venture (JV) /Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc., as the case may be. Non-submission of the above Certificate (s) by the bidder shall result in summarily rejection of his/their bid.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
ADEN/SCT Sub division:- In SSE/P.Way/PUU section - TSR (P) for 1.882km, TFR(P) for 31.550km, Renewal of Guard rail, sleepers & approach sleeper and Punalur Tower wagon siding linking works.
MDU-W-06-2026-12
MDU-W-06-2026-12
Open
Works - General
8 Months
Madurai, Tamil Nadu
₹0
₹3.2 L
4 Jun 2026
13 May 2026
21 May 2026
25 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 21,62,326.3 | ||
| — | 1514.00 | — | — | ||
| Provision of Check rail in sharp curves in Ghat section wherever not available | — | — | — | 9,08,702.8 | |
| — | 125.00 | — | — | ||
| Supply of grease - Graphited grease 'O' conforming to specification No. IS 408 - 1981. The grease shall be supplied at the Senior Section Engineer / P.way depot. The rate is inclusive of transportation of the grease from the firm to the depot including loading, unloading and stacking neatly at countable manner. (All labour, tools and plants, transport vehicles along with crew, fuel and other consumable stores are to be supplied by the tenderer/ contractor only at his own cost) | — | — | — | 16,250 | |
| — | 791.00 | — | — | ||
| "Removing the traction bond from the exg. running rails during the CTR work duly loosening the bolts & nuts without damaging the traction bond, bolts and nuts and refixing the same by drilling 20mm dia hole in the web of the new running rails for fixing bolts & nuts including tightening the same with contractor's men, materials, tools & plants, consumables etc., complete and as directed by Engineer in charge. " | — | — | — | 44,691.5 | |
| — | 17350.00 | — | — | ||
| "Destressing of LWR / CWR track consisting of PSC sleeper duly removing the fastening, lifting rails on roller and (as per the procedure laid down in the latest manual for fusion welding of rails by Alumino Thermic process and lowering rails and driving back the rail fittings, released or new fittings correctly to maintain the uniform gauge and alignment with contractor's Hydraulic rail tensor and contractor's consumable stores, labours, etc., at the locations as identified by the Engineer - in - charge with all lead, lift, track crossing, etc,. (Rollers and HYDRAULIC RAIL TENSOR to be supplied by Contractor)" | — | — | — | 8,15,450 | |
| — | 614.00 | — | — | ||
| Collection and transportation of all guard rails, P.way fittings such as ERC's liners, rubber pads, fish plates etc., available in road approachable place of station yard / LCs to work spot by dip lorry with a lead of 2 km, unloading and stacking neatly at specified locations in countable manner with all lead and lift etc., complete including crossing of track wherever required and as directed by the Engineer - in -charge with all lead and lift etc., complete (All labour and tools for trucking out of materials are to be supplied by the Tenderer/contractor except dip lorry if required will be supplied free by the Railway) | — | — | — | 3,56,120 | |
| — | 100.00 | — | — | ||
| Leading the stone ballast stacked along side the track with an average lead ofupto 100m including dumping,spreading on the formation,boxing and sectioning to profile etc., intrack at places and in quantities as directed bythe Engineerin-charge with contractor's own labour, tools and plants etc.,complete( All labour and tools & plants by the contractor.) | — | — | — | 21,112 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCApr2022withCorrectionSlip1to11.pdf
ATTACHMENT
RulesandRegulations-Aug2023.pdf
ATTACHMENT
AddlSpecialconditionsofcontractforTrackNew.pdf
ATTACHMENT
USSORSpecifications.pdf
ATTACHMENT
AncillaryWorksatsitewelding.pdf
ATTACHMENT
TSRCondition.pdf
ATTACHMENT
LocationAnnexure.pdf
ATTACHMENT
Specialconditionforcontractormovementofvehicle.pdf
ATTACHMENT
DSRspecificationextract.pdf
ATTACHMENT
TRRconditions.pdf
ATTACHMENT
RailpaintingCEcircular.pdf
ATTACHMENT
QtyStatement.pdf
ATTACHMENT
BankGuaranteeBond-Modelform.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .