| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC 5000 14 304 VATUNDHARA ENCLAVE TARAMANDAL GAUSPUR | AMETHI | UTTAR PRADESH | 227405 | ₹1.7 Cr | L1 | Accepted-AOC AS PER UPLOADED |
| 2 | L2₹1.7 CrRejected-Finance | ₹1.7 Cr | L2 | Rejected-Finance AS PER UPLOADED |
| 3 | L3₹1.7 CrRejected-Finance | ₹1.7 Cr | L3 | Rejected-Finance AS PER UPLOADED |
| 4 | Rejected-Technical | - | - | Rejected-Technical AS PER TECHNICAL EVALUATION |
| 5 | Rejected-Technical NONE | NEW DELHI | DELHI | 110001 | - | - | Rejected-Technical AS PER TECHNICAL EVALUATION |
| Sl No | Description | Qty | Unit | M/S SAGAR CONSTRUCTION L1 | M/S ASHISH KUMAR PANDEY L2 | RAM NARAYAN YADAV L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling Brick work and cement concrete in lime and cement concrete of old V.R.B. and proper disposal including stacking of material including all cost of materials,T&P and labours etc. | 219.65 | Cum | 400 ₹87,860 | 400 ₹87,860 | 400 ₹87,860 |
| 2.00 | Dismantling Reinforced cement concrete of old V.R.B. and proper disposal including stacking of material including all cost of materials,T&P and labours etc. | 113.33 | Cum | 500 ₹56,665 | 250 ₹28,332.5 | 500 ₹56,665 |
| 3.00 | Earth work for making Ramp and correction of bank, Diversion and making jeepable service road including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 1,839.5 | Cum | 100 ₹1,83,950 | 80 ₹1,47,160 | 115 ₹2,11,542.5 |
| 4.00 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge. | 3,723.68 | Cum | 65 ₹2,42,039.2 | 80 ₹2,97,894.4 | 70 ₹2,60,657.6 |
| 5.00 | Laying C.C. 1:4:8 ( M-7.50 ) in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and old brick ballast and usable malba ( Collected from dismantaling of old DRB/VRB) including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 61.71 | Cum | 4,000 ₹2,46,840 | 5,000 ₹3,08,550 | 5,000 ₹3,08,550 |
| 6.00 | Laying plain cement concrete work in 1:2:4 (M15) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm) for approch of VRB including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 144.22 | Cum | 8,400 ₹12,11,448 | 8,000 ₹11,53,760 | 8,300 ₹11,97,026 |
| 7.00 | Laying R.C.C. work in (M25) sonbhadra coarse sand of F.M. Not less then 2.50 and dala grit (10 mm to 20mm.) for Slab, pier cap, abutment cap and wearing coat including all cost of materials,T&P and labours and other accessories required for proper complete. | 776 | Cum | 9,000 ₹69,84,000 | 8,800 ₹68,28,800 | 9,000 ₹69,84,000 |
| 8.00 | Centering and shuttering for Plain Cement Concrete work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 500.38 | Sqm | 750 ₹3,75,285 | 200 ₹1,00,076 | 190 ₹95,072.2 |
| 9.00 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 1,116.2 | Sqm | 450 ₹5,02,290 | 500 ₹5,58,100 | 750 ₹8,37,150 |
| 10.00 | Cutting ,bending, binding and placing in position reinforcement steel including cost of binding wires and tack welding with material and other accessories required for proper completion of work As per direction of direction of Engineer in Charge. | 78.39 | MT. | 65,500 ₹51,34,545 | 70,000 ₹54,87,300 | 72,500 ₹56,83,275 |
Tender Value
Refer Docs
EMD Value
₹4.4 L
Closing Date
17 Feb 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
Reconstruction work of damaged VRBs at Km. 43.600 and Km. 44.330 of Lower Narayani Branch in District-Maharajganj and Kushinagar.
2026_UPIDC_1111715_1
12/SE/2025-26
Open Tender
Civil Works
365 days
KUSHINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,554
₹4.4 L
Yes
27 Mar 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
Dismantling Brick work and cement concrete in lime and cement concrete of old V.R.B. and proper disposal including stacking of material including all cost of materials,T&P and labours etc.
Dismantling Reinforced cement concrete of old V.R.B. and proper disposal including stacking of material including all cost of materials,T&P and labours etc.
Earth work for making Ramp and correction of bank, Diversion and making jeepable service road including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge.
Laying C.C. 1:4:8 ( M-7.50 ) in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and old brick ballast and usable malba ( Collected from dismantaling of old DRB/VRB) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Laying plain cement concrete work in 1:2:4 (M15) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm) for approch of VRB including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Laying R.C.C. work in (M25) sonbhadra coarse sand of F.M. Not less then 2.50 and dala grit (10 mm to 20mm.) for Slab, pier cap, abutment cap and wearing coat including all cost of materials,T&P and labours and other accessories required for proper complete.
Centering and shuttering for Plain Cement Concrete work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications.
Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications.
Cutting ,bending, binding and placing in position reinforcement steel including cost of binding wires and tack welding with material and other accessories required for proper completion of work As per direction of direction of Engineer in Charge.
Laying dismantled Brick/ Brick bats in approach road including cost of all material (but excluding cost of dismantled brick/Brick bats) & including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and as per I.D. specifications.
Dry brick on Edge Soling including prepration of sub-grade to prescribed Slope ,filing joints with canal bed material/sand including labour, T&P etc for proper completion of work.
Supplying and laying Geo textile (sheet) 200 gsm thick including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specifications.
Supplying and laying of 18 mm thick Joint Filler Board including cost of all materials, labour and T&P etc. for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications.
Supplying and Fixing PVC Pipe of 75 mm dia including cost of pipe, other material, labour, T&P etc. required for complete work as directed by Engineer-in-Charge and as per drawing and I.D. specifications.
Supply and Fixing of Wheel Guard Stone including cost of all materials, labour and T&P etc. for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat) including all the cost of T&P complete etc.
Boring with 150 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. required for complete work as directed by Engineer-in-Charge as per I.D. specifications.
Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc.for complete work as directed by Engineer-in-Charge as per I.D.specifications.
Painting/Printing letter upto 15cm height including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Providing & Laying LDPE Sheet including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge as per I.D. specifications.
Supplying and pitching Mirzapur stone boulders on with all lead & lift including labour, T&P etc. required for proper completion of work as directed by Engineer-in-Charge as per drawings and I.D. specifications.
Sign borad at site for notice both side including cost of all material ,labour, t&p etc. required for proper completion of worK.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BID01.pdf
Tender Documents • 2.18 MB
BOQ_2054862.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid