| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC KARUR | L1 | Accepted-AOC Addmited | |
| 2 | L2₹15.2 L+₹3,100.65 (0.20%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SPE Construction L1 | K Sundaramoorthy L2 |
|---|---|---|---|---|---|
| 1.001.Construction of Drinage From Teachers Quarters to Bus Satan at Elathagiri Village H/O Palepalli | |||||
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10mt and lift of 2mt in hard stiff clay ,stiff black cotton,hard red .earth,shales,murrum, gravel, stoney earth and earth mixed with small size boulders as per ss 20 A. | 175.3 | Cum | 154.22 ₹27,034.77 Lowest | 154.31 ₹27,050.54 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 25.04 | Cum | 5,050.32 ₹1,26,460.01 Lowest | 5,053.35 ₹1,26,535.88 |
| 4.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 65.83 | Cum | 5,780.52 ₹3,80,531.63 Lowest | 5,783.98 ₹3,80,759.4 |
| 5.00Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | |||||
| 6.00 | Below Ground Level | 711.5 | Sqm | 516.96 ₹3,67,817.04 Lowest | 517.27 ₹3,68,037.61 |
| 7.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification | 1.7 | mt | 89,964.4 ₹1,52,939.48 Lowest | 90,018.33 ₹1,53,031.16 |
| 8.00 | Cement concerete 1:1.5:3 using 20mm.H.B.G.jelly for all R .c.c. items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing but providing fixtures like fanclamps | 19.26 | Cum | 8,836.38 ₹1,70,188.68 Lowest | 8,841.67 ₹1,70,290.56 |
| 9.00 | Plastering CM 1:4 20mm thick over the cement concrete for floor finish including curing etc complete | 107.32 | Sqm | 547.73 ₹58,782.38 Lowest | 548.06 ₹58,817.8 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,31,076 ₹2,31,076 Lowest | 2,31,214 ₹2,31,214 |
Tender Value
₹15.3 L
EMD Value
₹16,000
Closing Date
10 Dec 2024, 3:00 pmClosed
The Block Development Bargur
The Block Development Bargur
Krishnagiri Dt bargur Block MLACDS 2024_25 Construction of Drinage From techers Quarters to Bus Stop at Elathagiri Village At palepalli Panchayat BRG_89
2024_RDTN_508874_1
2635_2024_R5_Dt_21_10_2024
Open Tender
Civil Works - Others
Item Rate
180 days
The Block Development Officer
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,000
15 Oct 2025
9 Dec 2024
10 Dec 2024
9 Dec 2024
10 Dec 2024
9 Dec 2024
Amount
1.Construction of Drinage From Teachers Quarters to Bus Satan at Elathagiri Village H/O Palepalli
Earth work excavating and depositing on bank with initial lead of 10mt and lift of 2mt in hard stiff clay ,stiff black cotton,hard red .earth,shales,murrum, gravel, stoney earth and earth mixed with small size boulders as per ss 20 A.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Below Ground Level
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
Cement concerete 1:1.5:3 using 20mm.H.B.G.jelly for all R .c.c. items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing but providing fixtures like fanclamps
Plastering CM 1:4 20mm thick over the cement concrete for floor finish including curing etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K Sundaramoorthy (BID ID -1204687)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .