Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹72.5 LAdmitted-Finance | -5.21% | ₹72.5 L | L1 | Admitted-Finance |
| 2 | L2₹73.5 L+₹93,347.73 (1.29%)Admitted-Finance | -3.99% | ₹73.5 L+₹93,347.73 (1.29%) | L2 | Admitted-Finance |
| 3 | L3₹78.0 L+₹5.5 L (7.61%)Admitted-Finance | +2.00% | ₹78.0 L+₹5.5 L (7.61%) | L3 | Admitted-Finance |
| 4 | L4₹80.7 L+₹8.2 L (11.3%)Admitted-Finance | +5.50% | ₹80.7 L+₹8.2 L (11.3%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹76.5 L
EMD Value
₹1.5 L
Closing Date
17 Aug 2026, 10:00 amClosed
Executive officer
jaitaran
Construction of Ambedkar E- Library Near by Raika basti Building in Municipal Board jaitaran
2026_DLB_581799_1
nit/2026/2135
Open Tender
Civil Works
Percentage
jaitaran
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
E O Municipal board Jaitaran, MDRISL Jaipur
₹1.5 L
Yes
19 Aug 2026
5 Aug 2026
18 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. Depth upto 1.5 m | - | cum | 229.5 | - |
| 2 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | - | cum | 159 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 fine/ coarse sand : 6 graded stone aggregate 40 mm nominal size). (PCC M15) | - | cum | 4,885 | - |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) (As per design mix) (Plinth and column) | - | cum | 7,460 | - |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar M-25 Grade Concrete (1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) -As per design mix) (Beam, Slab & Staircase) | 1 | cum | 7,740 | ₹7,732.26 |
| 6 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. | - | kg | 83.3 | - |
| 7 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 6,300 | - |
| 8 | Half brick masonry with FPS bricks of class designation 75 in superstructure above plinth level upto two stories. Cement mortar 1:4 (1 cement :4 coarse sand) | - | sqm | 767 | - |
| 9 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:4 (1 cement : 4 coarse sand) | - | cum | 5,130 | - |
| 10 | Random rubble dry stone Kharanja (soling) under floor | 1 | cum | 2,270 | ₹2,267.73 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1033687.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .