| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | ₹6.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹6.9 LRejected-Finance | ₹6.9 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | RAVISHANKAR.P L1 | Sri Sanjana Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10 | 42.84 | M3 | 246 ₹10,538.64 | 350 ₹14,994 |
| 2.00 | Cement Concrete 1:4;8 Mix (one part cement, four part sand and eight part of aggrigate) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 29.92 | M3 | 5,087 ₹1.5 L | 6,150 ₹1.8 L |
| 3.00 | Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86
Drain | 122.4 | m2 | 460 ₹56,304 | 550 ₹67,320 |
| 4.00 | Cover Slab | 27.2 | M2 | 868 ₹23,609.60 | 950 ₹25,840 |
| 5.00 | Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 16.32 | M3 | 6,537 ₹1.1 L | 7,500 ₹1.2 L |
| 6.00 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 23.8 | m3 | 7,150 ₹1.7 L | 7,500 ₹1.8 L |
| 7.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 4.76 | M3 | 8,080 ₹38,460.80 | 8,500 ₹40,460 |
| 8.00 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. | 500 | kg | 90 ₹45,000 | 100 ₹50,000 |
| 9.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M- Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 20.4 | M2 | 158 ₹3,223.20 | 165 ₹3,366 |
Tender Value
₹7.3 L
EMD Value
₹14,600
Closing Date
13 Jan 2026, 3:00 pmClosed
Executive Officer
Town Panchayat Karimangalam
Providing CC Road with Drain at Ward No11 Therpettai Arumugam house Indian Bank to Cooperative Bank manager Sakthivel House in Karimangalam Town Panchayat
2026_DTP_640502_1
1468/2025/A1
Open Tender
Civil Works
Karimangalam Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,600
24 Feb 2026
8 Jan 2026
14 Jan 2026
8 Jan 2026
13 Jan 2026
8 Jan 2026
Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Cement Concrete 1:4;8 Mix (one part cement, four part sand and eight part of aggrigate) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86 Drain
Cover Slab
Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3.
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3.
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M- Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_767007.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid