| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.6 LAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | 2₹10.9 L+₹33,722.55 (3.19%)Rejected-Finance | 2 | Rejected-Finance Not Being Lowest | |
| 3 | 3₹11.0 L+₹40,674.25 (3.85%)Rejected-Finance | 3 | Rejected-Finance Not Being Lowest | |
| 4 | 4₹11.0 L+₹45,422.96 (4.30%)Rejected-Finance | 4 | Rejected-Finance Not Being Lowest | |
| 5 | 5₹12.6 L+₹2.0 L (19.4%)Rejected-Finance NULL | 5 | Rejected-Finance Not Being Lowest |
Tender Value
₹13.0 L
EMD Value
₹27,000
Closing Date
17 Oct 2024, 12:00 pmClosed
EXECUTIVE ENGINEER LIFT CANAL DIVISION JHANSI
OFFICE OF THE EXECUTIVE ENGINEER LIFT CANAL DIVISION JHANSI
CONSTRUCTION OF TYPE 2 QUARTER AT BADAGAON PUMP CANAL DISTRICT JHANSI
2024_UPIDM_962434_1
05/LCDJ/EE/2024-25
Open Tender
Civil Works - Buildings
Item Rate
45 days
Badagaon Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹767
₹27,000
29 Oct 2024
10 Oct 2024
17 Oct 2024
10 Oct 2024
17 Oct 2024
10 Oct 2024
Amount
Excavation of foundation in Mar,Rankar Kankar mixed soil including lift up to 1.5 meter and lead upto 30 meter including filling watering, ramming, of excavated earth into the trenches or as directed by engineer-in-charge With proper completion of work.
Laying C.C. 1:3:6 per Cum i/c laying, ramming, curing and including cost of material, labour , T&P for proper comletion of work
R.C.R. Khanda stone masonry in lime or cement mortar 1:3 i/c all cost of material,labour T&P etc. With proper completion of work.
Providing/fixing Centering & shuttering for R.C.C. work including all material & T&P etc. With proper completion of work
R.C.C. work 1:1.5:3 per Cum i/c mixing laying and curing excluding centering,shuttering and reinforcement. and including cost of material, labour , T&P etc. With proper completion of work .
C.C.Flooring concrete 1:2:4 mix 3.5 cm thick including cost of material, labour, T&P With proper completion of work /M2
First class brick work in cement morter 1:4 (1cement:4Sand) using 1st class building bricks i/c all cost of material,labour T&P etc.with proper ccompletion of work.
Providing & laying steel for reinforcement including cost of steel,labour for cutting,Bending placing in position & binding with G.I. wire with all T&P required for completion of work .
12.5 mm Thick cement Plaster in 1:4 cement mortar on brick masonry including cost of all material, labour & T&P required for completion of work .
Painting one priming coat and Two Coat oil Distemper on Newly plastered surface i/c cost of all material ,labours, and T&P etc
Painting on iron works in small areas with two coat of ready including cost of all materials,labour and T&P etc. required for proper completion of the work
Providing & fixing M.S. doors, window including cost of all material, labour and T&P etc,with proper completion of work
Providing & Laying ( White/ Colured) Kajariya tiles, Ramano tiles florring over 20mm (avg.) thick base of cement morter 1:4 (1 Cement: 4 Coarse sand) laid and jointed with white cement (with pigment) slurry including rubbing and polishing complete.
Internal & External water supply and sanitary installation @ 9.50%
Internal & External electrical installation with power wiring @ 12.50%
M/S ARCHANA CONSTRUCTION
MAA PEETAMBRA CONSTRUCTION
ram sharan sahu
RAM PRATAP DIXIT
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .