| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-Finance | L1 | Accepted-Finance Ok | |
| 2 | L2₹14.9 L+₹2.6 L (20.9%)Accepted-Finance | L2 | Accepted-Finance Ok | |
| 3 | L3₹20.0 L+₹7.7 L (62.0%)Accepted-Finance | L3 | Accepted-Finance Ok | |
| 4 | L4₹24.3 L+₹11.9 L (96.4%)Accepted-Finance NITIN ENGINEERING INDIA SANDEEP YADAV CONTRACTOR ISHWAR CONTRACTOR SHREE SALASAR ASSOCIATES | L4 | Accepted-Finance Ok |
Tender Value
Refer Docs
EMD Value
₹41,000
Closing Date
10 Oct 2023, 1:30 pmClosed
EE(EandM)TYRSV
Sonia Vihar WTP
Reintegration of Electrical Entities Including Accessorial Works for Load Enhancement at P6 Ranney well
2023_DJB_248252_1
NIT No.- 07(2023-24)item no.1
Open Tender
Miscellaneous Works
Item Rate
25 days
Sonia Vihar WTP
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Delhi Jal Board
₹41,000
Yes
20 Oct 2023
3 Oct 2023
10 Oct 2023
3 Oct 2023
10 Oct 2023
3 Oct 2023
3 Oct 2023 - 10 Oct 2023
Comprehensive Charges i/c loading/ unloading for Shifting of Part of HT Panel from Ghitorni STP to P6 Ranney Well.
Comprehensive Charges i/c loading/ unloading for Shifting of Part of HT Panel from Qutub BPS to P6 Ranney Well.
Comprehensive Charges i/c loading/ unloading for Shifting of Transformer from Chandrawal Water Works behind Vidhan Sabha to P6 Ranney Well.
Comprehensive Charges i/c loading/ unloading for Shifting of APFC Panel from V11 Ranney Well to P6 Ranney Well.
Dismantling and shifting of installed old DG Set at P6 Ranney well.
Dismantling and shifting of installed old Transformer including its ancillaries at P6 Ranney well.Dismantling and shifting of installed old Transformer including its ancillaries at P6 Ranney well.
Comprehensive Testing and Repairing of already existing old Transformer. 630 KVA
Comprehensive Testing and Repairing of already existing HT Panel. 11 KV VCB HT 5 Panel Board.
Comprehensive Testing and Repairing of already existing APFC Panel. 110 KVAR each
Providing and laying of HT Cable of suitable size as per site condition. XLPE 120sq mm armored Aluminum HT 3 core cable.
Providing and laying of LT Cable of suitable size as per site condition. XLPE 240sq mm armored Aluminum LT 3.5 core cable
Supply, Installation and Commissioning of 400 Amp, TP, 415 V MCCB. 50 KA
Supply, Installation and Commissioning of MCCB Panel Box.
Installation and Commissioning of HT Panel, Transformer and APFC Panel including mirror civil works .
Integration and Testing of complete system on On-load & off-load mode.
Accessories Items required for completion of each task such as nut, bolts, thimbles, joint kits, junction box, aluminum bus bar etc.
Avon Electricals
Cantilever Engineers
Nitin Engineering India
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .