Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Finance | ₹6.6 L | L1 | Admitted-Finance |
| 2 | L2₹6.7 L+₹9,716.54 (1.46%)Admitted-Finance | ₹6.7 L+₹9,716.54 (1.46%) | L2 | Admitted-Finance |
| 3 | L3₹6.8 L+₹13,740.49 (2.07%)Admitted-Finance | ₹6.8 L+₹13,740.49 (2.07%) | L3 | Admitted-Finance |
| 4 | L4₹7.4 L+₹71,578.48 (10.8%)Admitted-Finance | ₹7.4 L+₹71,578.48 (10.8%) | L4 | Admitted-Finance |
| 5 | L5₹7.4 L+₹80,612.58 (12.1%)Admitted-Finance | ₹7.4 L+₹80,612.58 (12.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BNR ENTERPRISES L5 | E.Thirupathi L2 | M/s.R.N.P. Govindaraj Enterprises L3 | V.Chithra L4 | J Rajkumar L1 |
|---|---|---|---|---|---|---|---|---|
| 1.001. Construction of New Mini CSC - Type-6 (MCSC for Middile School - Boys at Anusonai H/o Bodichapalli EST AMT: 7,78,000/- | ||||||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 23.06 | Cum | 298.2 ₹6,876.49 | 240 ₹5,534.4 | 232 ₹5,349.92 Lowest | 263.78 ₹6,082.77 | 250 ₹5,765 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification . | 3.68 | Cum | 6,500.25 ₹23,920.92 | 4,950 ₹18,216 | 4,752 ₹17,487.36 Lowest | 5,376.57 ₹19,785.78 | 5,000 ₹18,400 |
| 4.00 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush pointing including curing neat finishing, etc., complete complying with standard specifiction. | 10.12 | Cum | 6,785.65 ₹68,670.78 | 5,200 ₹52,624 | 5,060 ₹51,207.2 Lowest | 5,750.13 ₹58,191.32 | 6,000 ₹60,720 |
| 5.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five sand) including curing neat finishing, etc., complete complying with standard specifiction. | 17.79 | Cum | 7,525.2 ₹1,33,873.31 | 5,450 ₹96,955.5 | 5,368 ₹95,496.72 | 4,400 ₹78,276 Lowest | 7,000 ₹1,24,530 |
| 6.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | ||||||||
| 7.00 | Plinth Beam | 7.89 | Sqm | 580 ₹4,576.2 | 480 ₹3,787.2 Lowest | 482 ₹3,802.98 | 547.5 ₹4,319.78 | 650 ₹5,128.5 |
| 8.00 | Roof Beam | 15.06 | Sqm | 1,095 ₹16,490.7 | 1,000 ₹15,060 | 964 ₹14,517.84 Lowest | 1,095 ₹16,490.7 | 1,100 ₹16,566 |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 3.04 | Cum | 9,631 ₹29,278.24 | 9,800 ₹29,792 | 8,038 ₹24,435.52 Lowest | 8,987.4 ₹27,321.7 | 9,000 ₹27,360 |
| 10.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.43 | MT | 98,251 ₹42,247.93 | 89,600 ₹38,528 | 80,835 ₹34,759.05 Lowest | 91,858.5 ₹39,499.16 | 95,000 ₹40,850 |
Tender Value
₹7.8 L
EMD Value
₹8,000
Closing Date
16 Sept 2026, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER KELAMANGALAM
THE BLOCK DEVELOPMENT OFFICER KELAMANGALAM
KGI DT KLM BLK SBM(G) PHASE-II 2026-27 Package No 01 CONSTRUCTION OF NEW MINI CSC TYPE 6 (MCSC FOR MIDDLE SCHOOL BOYS) AT ANUSOANI H/O BODICHAPALLI
2026_RDTN_700451_1
2155/2026/R5 Dated on 25/06/2026
Open Tender
Civil Works
Item Rate
THE BLOCK DEVELOPMENT OFFICE KELAMANGALAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,000
THE BLOCK DEVELOPMENT OFFICER KELAMANGALAM
21 Sept 2026
2 Sept 2026
17 Sept 2026
2 Sept 2026
16 Sept 2026
2 Sept 2026
7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Construction of New Mini CSC - Type-6 (MCSC for Middile School - Boys at Anusonai H/o Bodichapalli EST AMT: 7,78,000/- | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 23.06 | Cum | - | - |
| 3 | Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification . | 3.68 | Cum | - | - |
| 4 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush pointing including curing neat finishing, etc., complete complying with standard specifiction. | 10.12 | Cum | - | - |
| 5 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five sand) including curing neat finishing, etc., complete complying with standard specifiction. | 17.79 | Cum | - | - |
| 6 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | - | - | - | - |
| 7 | Plinth Beam | 7.89 | Sqm | - | - |
| 8 | Roof Beam | 15.06 | Sqm | - | - |
| 9 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 3.04 | Cum | - | - |
| 10 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.43 | MT | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.60 MB
PB.pdf
Tender Documents • 0.43 MB
TB.pdf
Tender Documents • 0.92 MB
BOQ_841961.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .