| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-AOC B 87 SHAM NAGAR KHAYALA ROAD NEW DELHI 110018 | NEW DELHI | NEW DELHI | DELHI | 110018 | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹26.6 L+₹2.1 L (8.51%)Rejected-Finance WZ 88A JANAK PARK HARI NAGAR NEW DELHI 110064 | NEW DELHI | NEW DELHI | DELHI | 110064 | L2 | Rejected-Finance BEING L2 | |
| 3 | L3₹37.7 L+₹13.1 L (53.5%)Rejected-Finance 216 BHARAT NAGAR INDRAPURI BHOPAL MADHYA PRADESH 462021 | BHOPAL | MADHYA PRADESH | 462021 | L3 | Rejected-Finance BEING L3 | |
| 4 | L4₹45.5 L+₹20.9 L (85.3%)Rejected-Finance | L4 | Rejected-Finance BEING L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical DUE TO NOT HAVING DESIRED CATEGORY |
Tender Value
Refer Docs
EMD Value
₹82,740
Closing Date
28 Jan 2021, 6:00 pmClosed
GE AF PALAM DELHI CANTT-10
GE AF PALAM DELHI CANTT-10
GENP-56/2020-21 REPAIR/MAINTENANCE OF FIRE FIGHTING, FIRE DETECTION AND ALRAM SYSTEM AT AF STATION PALAM UNDER GE (AF) PALAM, DELHI CANTT-10
2021_MES_410460_1
GENP-56/2020-21
Open Tender
Miscellaneous Works
Item Rate
180 days
GE (AF) PALAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (AF) PALAM
₹82,740
Yes
9 Jul 2021
7 Jan 2021
29 Jan 2021
7 Jan 2021
28 Jan 2021
21 Jan 2021
Amount
Supply and fixing fire hydrant landing valve type 'A' (single head outlet) gun metal valve with 63mm dia female outlet complete suitable inlet with rubber blank cap and chain as per IS 5290-1983, suitable for brigade hose of 63mm with coupling conforming to IS : 903 including taking down the existing one complete all as specified and directed by Engr-in-charge.
Supply and fixing in replacement of weather proof standard fire hose box made of 16SWG MS sheet 900mmX600mmX450mm with double door with 4mm thick glass and door frame including locking arrangement by allen key stove enamelled fire red finish with "fire hose" marked on front and brilliant white inside yard.
Supply and fixing in replacement of RRL, hose pipe type-A of 63mm dia and 15 Mtrs length Gun Metal instantaneous male and female conforminh to IS:903 and branch pipe and nozel 15mm dia (suitable for external hydrant) complete all as specified and directed by Engr-in-charge.
Supply and fix in replacement of gun metal single headed ISI marked oblique pattern hydrant valve with 80mm dia flanged inlet and 63mm dia female outlet branch pipe and nozzle conforming to IS : 903 including gun metal cap and GI chain realese type plug and all accessories as per IS : 5290 complete all as specified and directed by Engr-in-charge.
Supply ,installing, testing and commissioning of hose box for hose reel of size 1200mmX2100X600mm internal dia made of 16 SWG MS sheet angle frame capable of accomodating of the following (for internal ) (i) 01 No 63mm dia oblique pattern instataneous female type GM landing valve with caps and chain conforming to IS : 5290 with 100mm dia pressure guage complete including taking down the existing one all as specified and directed by Engr-in-charge. (ii) 2X15 mtr long 20mm dia reinforced rubber hose reel with MS, painted , swing type reel drum 6.5mm nozzle etc conforming to IS: 884 incl supporting bracket. (iii) One set of GM branch pipe conforming to IS 903 (iv) One branch pipe, one fire man axe, first aid hose reel and fire extinguisher
Supply, fixing, testing and commissioning in replacement of wall mounting swinging type first aid fire hose reel with drum, hanging bracket 30mtr long and 20mm dia high pressure hosereel as per IS: 444 with gun metal shutt off nozzle having 5mm dia orifice. The hose reel shall be conforming to IS: 884-1985. Rate shall including for 25mm dia MS pipe connection from riser to hose reel sockets, nipples, elbows and ball valve (25mm dia), Drum shall be fixed on adjoining wall through anchor fastener/cement concrete hook or MS stand as per site requirement and the rate for fixing/hanging items inthe rate quoted( for internal hydrant and one each an either side of stage) complete all as specified and directed by Engr -in-charge.
S&F in replacement of 63mm dia15mtr long controlled perclating rubberised fabric hose conforming to IS: 8423 (type A) including gun metal male and female instantaneous coupling bound and rivetted to hose pipe with 1.5mm dia copper wire complete in all respect, hose BSI marked, conforming to IS : 636 type II and complete male female coupling conforming to IS :903 complete all as specified and directed by Engr-in-charge.
Supply and fixing in replacement of fire hydrant stand post 1.5mtr height single head outlet gunmetal of 80mm dia with 63mm dia female outlet complete and 80mm inlet rubber blank cap and chain as per IS 5280-1983 suitable for brigade hose of 63mm with coupling conforming to IS 903 for external hydrant complete all as specified and directed by Engr-in-charge.
Supply, fixing , testing and commissioning in replacement of Gun Metal four way, fire brigade inlet to hydrant ring with 63mm dia instantaneous type inlet and 150mm dia flanged outlet conforming to IS : 904 with blank cap and chaincomplete all as specified and directed by Engr-in-charge.
Supply ,fixing ,testing and commissioning in replacement of 150mm dia heavy duty class 'C' MS pipe 6mm thick ISI marked as per IS:1239 with all necessary fittings & fabrication like tees, elbow, flanges, reducer, gaskets, nut and bolts etc welding or screwed joint as required including fixing of pipe with necessary standard standard clamps structural steel supprt (chilly make) as required/directed at site including painting of two coats of synthetic enamel paint of post office red color over two coats of red oxide primer complete all as specified and directed by Engr-in-charge.
All as per item No.10 above but size of pipe 100mm.
All as per item No.10 above but size of pipe 80mm.
Supply and fixing in replacement of Cast Iron NRV of 150mm bore both end flanged with necessary packing materials nut, bolt & washer of suitable size PN 1.6 complete.
S&F in replacement of valve reflux with by pass arrangement complete all as specified and directed by Engr-in-charge.
S&F in replacement of 500 Ltrs capacity rotational moulded polyethylene water storage tank two layers Cylindrical vertical with closed top with threaded lid with 25 mm GI medium grade pipe for inlet, outlet, over flow, checknuts for inlet and outlet, hoisted and fixed in position.
S&F in replacement of 80mm dia flanged end basket with foot valve conforming to IS:4038 strainer fabricated from 16 guage brass sheet with 3mm slot made from MS body bottom and top removable flange with nuts, bolts etc complete including joints and joining materials as per site requirement complete.
Supply and fixing in replacement of rubber mat of size 1 mtr X2 Mtr X 19mm chequre type black complete all as specified and directed by Engr-in-charge.
Supply and installing in replacement of fire extinguisher mechanical foam 09 ltrs capacity conforming to IS :15683 all as specified and directed by Engr-in-charge.
Supply and installation in replacement of fire extinguisher dry chemical powder (ABC type ) 6 kgs capacity conforming to IS : :15683 all as specified and directed by Engr-in-charge.
Supply and installation in replacement of fire extinguisher light weight squeez grip type CO2 of 4.5 Kgs conforming to IS 15683 and all as specified and directed by Engr-in-charge.
Supply & fixing in replacement of butterfly valve of size 150 mm dia conforming to IS :13095 , flanged ends drilled type with steel spindle including nuts bolts washers and jointing material complete.
Supply & fixing in replacement of butterfly valve of size 100 mm dia conforming to IS: 13095 , flanged ends drilled type with steel spindle including nuts bolts washers and jointing material complete.
Supply & fixing in replacement of non return butterfly valve of size 150 mm dia ISI marked all as specified and directed by Engr-in-charge.
Supply & fixing in replacement of non return butterfly valve of size 80 mm dia ISI marked all as specified and directed by Engr-in-charge.
Supply , fixing in replacement of 100mm dia burden type stainless steel dial type pressure gauge having calibration of 0-15 kg/cm2 including brass isolation valve and pipe all as specified and directed by Engr-in-charge.
M&L for Servicing of induction motor 75 HP coupled with fire pump complete including oiling, burnt winding replacement, greasing replacement of wornout rubber packing, wornout nuts and washers etc including testing to the entire satisfaction of Engineer in charge.
M& L for Servicing of induction motor 25 HP coupled with fire pump complete including oiling burnt winding replacement , greasing replacement of wornout rubber packing wornout nuts and washers etc including testing to the entire satisfaction of Engineer in charge.
M&L for Servicing of induction motor 15 HP coupled with fire pump complete including oiling, burnt winding replacement, greasing replacement of wornout rubber packing wornout nuts and washers etc including testing to the entire satisfaction of Engineer in charge.
Comprehensive monthly maintenance of auto fire alarm system installed in BBJ Hanger & RSS Hangar and ISH in Tech Area at AF Stn Palam. The detail scope of work consists of the following:- (i) Cleaning inspecting, checking and repairing if required all the equipments of fire detection system. (ii) Operational test of all the equipment of fire detection system in presence of rep of users and Engr-in-charge. (iii) The contractor will submit test report regarding functioning of all the equipments duly signed by contractor, users rep and Engr-in-Charge. (iv) The maintenance shall be carried out through manufacturer representative or his authorised Rep. (v) Emergency visit will be carried out when called in addition to the normal monthly maintenance in case of any failure in the system due to any cause without additional cost. (vi) Materials required for replacement will be measured and paid separately under respective items of this schedule. Note:- The detail of fire equipments required repairs/maintenance are as under:- (a) UL Listed auto fire alarm control panel having micro processor based two loop cards (252 device/loop card) - 02 Nos. (b) UL Listed intelligent addressable multi-criteria detector with base- 284 Nos. (c) UL Listed intelligent heat detector - 08 Nos. (d) Manual call point - 08 Nos. (e) Control module for hooter - 18 Nos. (f) zone Monitor module - 28 Nos. (g) Fault isolator - 12 Nos. (h) Wall mounted hooter - 18 Nos. (j) Response indicator - 25 Nos. (k) IR Flame detector - 28 Nos. (l) UPS 1 KVA - 02 No.
Comprehensive monthly maintenance of auto fire alarm system installed in AW 101 Hanger No -I, II & III in Tech Area at AF Stn Palam. The detail scope of work consists of the following:- (i) Cleaning inspecting, checking and repairing if required all the equipments of fire detection system. (ii) Operational test of all the equipment of fire detection system in presence of rep of users and Engr-in-charge. (iii) The contractor will submit test report regarding functioning of all the equipments duly signed by contractor, users rep and Engr-in-Charge. (iv) The maintenance shall be carried out through manufacturer representative or his authorised Rep. (v) Emergency visit will be carried out when called in addition to the normal monthly maintenance in case of any failure in the system due to any cause without additional cost. (vi) Materials required for replacement will be measured and paid separately under respective items of this schedule. Note:- The detail of fire equipments required repairs/maintenance are as under:- (a) UL Listed auto fire alarm control panel having micro processor based two loop cards (252 device/loop card) - 02 No. (b) UL Listed intelligent addressable multi-criteria detector with base- 192 Nos. (c) UL Listed intelligent heat detector - 02 Nos. (d) Manual call point - 18 Nos. (e) Control module hooter - 05 Nos. (f) Monitor module - 06 Nos. (g) Fault isolator - 12 Nos. (h) Wall mounted hooter - 06 Nos. (j) Response indicator - 70 Nos. (k) IR Flame detector - 44 Nos. (l) UPS 1 KVA - 02 Nos.
Comprehensive monthly maintenance of auto fire alarm system installed in SES LAB OF 181 FLIGHT, TWIN DSS BLDGS & CARGO TERMINAL in Tech Area at AF Stn Palam. The detail scope of work consists of the following:- (i) Cleaning inspecting, checking and repairing if required all the equipments of fire detection system. (ii) Operational test of all the equipment of fire detection system in presence of rep of users and Engr-in-charge. (iii) The contractor will submit test report regarding functioning of all the equipments duly signed by contractor, users rep and Engr-in-Charge. (iv) The maintenance shall be carried out through manufacturer representative or his authorised Rep. (v) Emergency visit will be carried out when called in addition to the normal monthly maintenance in case of any failure in the system due to any cause without additional cost. (vi) Material required for replacement will be measured and paid separately under respective items of this schedule. Note:- The detail of fire equipments required repairs/maintenance are as under:- (a) UL Listed auto fire alarm control panel having micro processor based two loop cards (252 device/loop card) - 02 No. (b) UL Listed intelligent addressable multi-criteria detector with base- 59 Nos. (c) Manual call point - 05 Nos. (d) Control module for hooter - 05 Nos. (e) Fault isolator - 04 Nos. (f) Wall mounted hooter - 07 Nos. (g) Response indicator - 07 Nos.
Comprehensive monthly maintenance of auto fire alarm system installed in SIGNAL EXCHANGE BLDG IN Camp area & EDN SECTION in Camp Area at AF Stn Palam. The detail scope of work consists of the following:- (i) Cleaning inspecting, checking and repairing if required all the equipments of fire detection system. (ii) Operational test of all the equipment of fire detection system in presence of rep of users and Engr-in-charge. (iii) The contractor will submit test report regarding functioning of all the equipments duly signed by contractor, users rep and Engr-in-Charge. (iv) The maintenance shall be carried out through manufacturer representative or his authorised Rep. (v) Emergency visit will be carried out when called in addition to the normal monthly maintenance in case of any failure in the system due to any cause without additional cost. (vi) Materials required for replacement will be measured and paid separately under respective items of this schedule. Note:- The detail of fire equipments required repairs/maintenance are as under:- (a) UL Listed auto fire alarm control panel having micro processor based two loop cards (252 device/loop card) - 02 No. (b) UL Listed intelligent addressable multi-criteria detector with base- 99 Nos. (c) UL listed intelligent heat detector-02 Nos (d) Manual call point - 08 Nos. (e) Control module for hooter - 08 Nos. (f) Monitor module- 09 Nos (g) Fault isolator - 06 Nos. (h) Wall mounted hooter - 08 Nos. (j) Response indicator - 48 Nos.
Comprehensive monthly maintenance of auto fire alarm system installed in 737 Boeing Lab, 41 SQN Simulator Bldg in Tech Area at AF Stn Palam. The detail scope of work consists of the following:- (i) Cleaning inspecting, checking and repairing if required all the equipments of fire detection system. (ii) Operational test of all the equipment of fire detection system in presence of rep of users and Engr-in-charge. (iii) The contractor will submit test report regarding functioning of all the equipments duly signed by contractor, users rep and Engr-in-Charge. (iv) The maintenance shall be carried out through manufacturer representative or his authorised Rep. (v) Emergency visit will be carried out when called in addition to the normal monthly maintenance in case of any failure in the system due to any cause without additional cost. (vi) Materials required for replacement will be measured and paid separately under respective items of this schedule. Note:- The detail of fire equipments required repairs/maintenance are as under:- (a) UL Listed auto fire alarm control panel having micro processor based two loop cards (252 device/loop card) - 02 No. (b) UL Listed intelligent addressable multi-criteria detector with base- 130 Nos. (c) UL Listed intelligent heat detector - 04 Nos. (d) Manual call point - 11 Nos. (e) Control module for hooter - 06 Nos. (f) Monitor module - 05 Nos. (g) Fault isolator - 12 Nos. (h) Wall mounted hooter - 20 Nos. (j) Response indicator - 48 Nos. (k) UPS 1 KVA -02 Nos.
Comprehensive monthly maintenance of auto fire alarm system installed in AFCNWP CAMP AREA at AF Stn Palam. The detail scope of work consists of the following:- (i) Cleaning inspecting, checking and repairing if required all the equipments of fire detection system. (ii) Operational test of all the equipment of fire detection system in presence of rep of users and Engr-in-charge. (iii) The contractor will submit test report regarding functioning of all the equipments duly signed by contractor, users rep and Engr-in-Charge. (iv) The maintenance shall be carried out through manufacturer representative or his authorised Rep. (v) Emergency visit will be carried out when called in addition to the normal monthly maintenance in case of any failure in the system due to any cause without additional cost. (vi) Materials required for replacement will be measured and paid separately under respective items of this schedule. Note:- The detail of fire equipments required repairs/maintenance are as under:- (a) UL Listed auto fire alarm control panel having micro processor based two loop cards (252 device/loop card) - 01 No. (b) UL Listed intelligent addressable multi-criteria detector with base- 65 Nos. (c) UL Listed intelligent heat detector - 06 Nos. (d) Manual call point - 06 Nos. (e) Control module for hooter - 06 Nos. (f) Monitor module - 06 Nos. (g) Fault isolator - 06 Nos. (h) Wall mounted hooter - 06 Nos. (j) Response indicator - 13 Nos.
Comprehensive monthly maintenance of auto fire alarm system installed in SES SCTION OF CPRU, COLOUR LAB, CFNL LAB IN TECH AREA at AF Stn Palam. The detail scope of work consists of the following:- (i) Cleaning inspecting, checking and repairing if required all the equipments of fire detection system. (ii) Operational test of all the equipment of fire detection system in presence of rep of users and Engr-in-charge. (iii) The contractor will submit test report regarding functioning of all the equipments duly signed by contractor, users rep and Engr-in-Charge. (iv) The maintenance shall be carried out through manufacturer representative or his authorised Rep. (v) Emergency visit will be carried out when called in addition to the normal monthly maintenance in case of any failure in the system due to any cause without additional cost. (vi) Materials required for replacement will be measured and paid separately under respective items of this schedule. Note:- The detail of fire equipments required repairs/maintenance are as under:- (a) UL Listed auto fire alarm control panel having micro processor based two loop cards (252 device/loop card) - 03 No. (b) UL Listed intelligent addressable multi-criteria detector with base- 162 Nos. (c ) UL listed intelligent heat detector - 02 Nos (d) Manual call point - 14 Nos. (e) Control module for Manual call point - 14 Nos. (f) monitor module - 06 Nos. (g) Fault isolator - 10 Nos. (h) Wall mounted hooter - 14 Nos (j) Response indicator - 72 Nos. (k) sounder relay - 08 Nos. (l) UPS 1 KVA - 03 Nos. (m) central control including 21" colour monitor 21"and its CPU , Key board ,mouse & UPS -01 Set (n) Repeater panel -01 No
Supply only in replacement of UL Listed addressable muiti-criteria type photo electric smoke cum thermal detectors (acelimate) with mounting base complete.
Supply only in replacement of addressable manual call point/pull station single action type with gold plated SPST contacts. Make: Siemens./Honeywell
Supply only in replacement of addressable control relay module for manual call point.
Supply only in replacement of intelligent addressable monitor module.
SSupply only in replacement of fault isolator module with automatic resetting arrangement.
Supply only in replacement of response indicator (RI)
Supply only in replacement of control module (HZM) item suitable for flame detectors
Supply only in replacement of hooter with control module.
Supply only in replacement of intelligent addressable heat detector with base.
Supply only in replacement of Infra ray flame detector (beam detector).
M&L for taking out unserviceable Power supply unit Model PSC-12 of Siemens Make from the existing Fire detection control panel and repairing the unit including replacement of unserviceable parts complete and refixing the same in its original position including testing commissioning complete all as specified and directed.
M&L for taking out unserviceable repeater fault control panel of existing fire finder XLS system of Honey Well Make from the existing site and repairing the repeater panel including replacement of unserviceable parts complete and refixing the same in its original position including testing commissioning complete all as specified and directed.
Supply only in replacement of PCB loop cord suitable for self addressable fire finder system.
Supply & fixing in replacement of PVC insulated armoured copper conductor cable size 1.5 sqmm 2 core FRLS 1100 volts fixed on wall/celling of the hanger with fixing accessories complete.
S & F in replacement of PVC insulated PVC sheathed copper conductor cable size 1.5 sqmm 2 core FRLS 1100 volts drawn in existing PVC conduit fixed on wall/celling of the bldg complete.
Supply and fixing in replacemnt of PVC conduit medium grade of size 20 mm dia including fixing accessories like saddles, couplers bends tees etc complete.
Supply only in replacement of UPS 1.0 KVA suitable for working on 230 Volts, 50 Hz AC supply complete.
Supply only in replacement of Battery 12 Volts 7 AH dry type complete all as specified.
Disconnecting and taking out old unserviceable CPU display unit including PMI of fire finder and supply and fixing new CPU display unit including PMI suitable for self addressable fire finder XLS system Make: Siemens/ Honey well/Edward
Disconnecting and taking out old unserviceable Mother Board of fire finder and supply and fixing new mother board for two Nos loops cards suitable for self addressable fire finder XLS system Make: Siemens / Honey well/Edward
Excavation in trenches not exc 1.5 metres wide and not exc1.5 metres deep for pipe line in soft/loose soil, getting out and levelling of bottom surface to required level all as specified and as directed by Engr-in-charge.
Returning filling in, including spreading, leveling, watering and well ramming of soil in layers not exc 25 cm thick .
Removing excavated material from site to a distance not exc 50 metres away and depositing where directed not exc 1.5 metres from the starting point.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .