Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC 1 225 5 6 SADAR BAZAR DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹32.6 L+₹5.5 L (20.2%)Rejected-Finance JYOTI BAKERY 1ST FLOOR A5 HSEDRI G RZA 5 PALAM NEW DELHI SOUTH WEST DELHI DELHI 110045 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110045 | L2 | Rejected-Finance OTHER THAN L1 | |
| 3 | L3₹32.9 L+₹5.8 L (21.3%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN L1 | |
| 4 | L4₹33.4 L+₹6.3 L (23.2%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN L1 | |
| 5 | L5₹33.7 L+₹6.6 L (24.3%)Rejected-Finance | L5 | Rejected-Finance OTHER THAN L1 |
| Sl No | Description | Qty | Unit | Microsys Automation India L11 | A N BUILDERS L9 | Ridhi engineers and builders L8 | ALLIED CONSTRUCTION L5 | Rahul Enterprises L6 | Deven Associates L7 | M/s Shri Shyam Bharat Builders L4 | M P TYAGI ENGINEERS AND CONTRACTORS L1 | sumit associates L12 | RS GREEN INDIA CONSTRUCTION L10 | jain associates L3 | HSEDRIG ENGINEERS AND CONTRACTORS L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 metre depth and getting out in any type of soil for taking out/laying of pipe complete all as specified and as directed | 726 | CUM | 90 ₹65,340 | 120 ₹87,120 | 125 ₹90,750 | 140 ₹1,01,640 | 90 ₹65,340 | 99 ₹71,874 | 50 ₹36,300 | 49 ₹35,574 Lowest | 100 ₹72,600 | 100 ₹72,600 | 129 ₹93,654 | 100 ₹72,600 |
| 2.00 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc. 25 cm thick complete all as specified and directed. | 545 | CUM | 10 ₹5,450 | 20 ₹10,900 | 25 ₹13,625 | 20 ₹10,900 | 19 ₹10,355 | 19 ₹10,355 | 40 ₹21,800 | 9 ₹4,905 Lowest | 20 ₹10,900 | 100 ₹54,500 | 59 ₹32,155 | 50 ₹27,250 |
| 3.00 | Removal of excavated material from site to a distance not exceeding 50 meters away and depositing where directed at a level not exceeding 1.5 meters above the starting point complete all as specified and directed. | 181 | CUM | 10 ₹1,810 | 40 ₹7,240 | 25 ₹4,525 | 20 ₹3,620 | 90 ₹16,290 | 49 ₹8,869 | 30 ₹5,430 | 9 ₹1,629 Lowest | 30 ₹5,430 | 100 ₹18,100 | 119 ₹21,539 | 40 ₹7,240 |
| 4.00 | Excavation in trenches by cutting of road crossing, PCC hard standing for taking out/laying of pipe lines including filling of PCC (1:2:4) type B-2 using 40 mm graded crushed stone aggregate as in foundations, filling and mass concrete complete including making good the existing surface complete all as specified and as directed.
(Note:- Length and depth of cutting will be decided by Eng-in-Charge as per site requirement. contractor will provided all materials for making good as per existing road and removed rubbish out size MD land at his own arrangement. Cost deemed included in quoted unit rate.) | 2 | CUM | 1,800 ₹3,600 | 500 ₹1,000 | 250 ₹500 | 500 ₹1,000 | 490 ₹980 | 499 ₹998 | 200 ₹400 Lowest | 499 ₹998 | 450 ₹900 | 5,500 ₹11,000 | 1,699 ₹3,398 | 500 ₹1,000 |
| 5.00Taking up GI/CI/MS Pipes including all fitting of the following sizes complete all as specified and directed:- | |||||||||||||||
| 5.01 | 80 mm bore | 220 | RM | 20 ₹4,400 | 5 ₹1,100 Lowest | 15 ₹3,300 | 20 ₹4,400 | 19 ₹4,180 | 10 ₹2,200 | 20 ₹4,400 | 9 ₹1,980 | 20 ₹4,400 | 90 ₹19,800 | 59 ₹12,980 | 20 ₹4,400 |
| 5.02 | 100 mm bore | 360 | RM | 25 ₹9,000 | 8 ₹2,880 Lowest | 15 ₹5,400 | 30 ₹10,800 | 19 ₹6,840 | 10 ₹3,600 | 25 ₹9,000 | 9 ₹3,240 | 25 ₹9,000 | 100 ₹36,000 | 59 ₹21,240 | 25 ₹9,000 |
| 5.03 | 150 mm bore | 360 | RM | 30 ₹10,800 | 10 ₹3,600 | 25 ₹9,000 | 30 ₹10,800 | 29 ₹10,440 | 12 ₹4,320 | 25 ₹9,000 | 9 ₹3,240 Lowest | 30 ₹10,800 | 120 ₹43,200 | 69 ₹24,840 | 30 ₹10,800 |
| 5.04 | 200 mm bore | 150 | RM | 35 ₹5,250 | 12 ₹1,800 | 45 ₹6,750 | 30 ₹4,500 | 49 ₹7,350 | 14 ₹2,100 | 25 ₹3,750 | 9 ₹1,350 Lowest | 35 ₹5,250 | 150 ₹22,500 | 79 ₹11,850 | 35 ₹5,250 |
| 6.00Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge. Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ. Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates. Note 3:- Layout plan for laying of DI pipe shall be given by EIC in writing. Note 4 :- Cost of Rubber gasket joints (Tyton Joint) included in quoted unit rates. | |||||||||||||||
Tender Value
₹48.5 L
EMD Value
₹96,980
Closing Date
18 Oct 2025, 6:00 pmClosed
GE(U)(W/S) DELHI CANTT
GE(U)(W/S) DELHI CANTT 110010
REPAIR/REPLACEMENT /MAINT/RE-ROUTING OF CI/DI/GI DISTRIBUTION INCLUDING MS PIPE LINE / HEADER AND CONNECTED ITEMS AT NEW VRC, DGIS, IHQ CAMPS, CAMS, VIKRAM VIHAR, WARDEC, 1 CBPO AREA, OLD VRC AND REPAIR/MAINT OF CHLORONOME PLANTS IN THE AREA OF AGE(
2025_MES_732979_1
GE/WS/Token No-45 OF 2025-26
Open Tender
Civil Works
Item Rate
180 days
GE(U)(W/S) DELHI CANTT
AS PER NIT AND TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE(U)(W/S) DELHI CANTT
₹96,980
9 Dec 2025
27 Sept 2025
21 Oct 2025
27 Sept 2025
18 Oct 2025
12 Oct 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_820697.xls
BOQ • 0.41 MB
TENDER45.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .