Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹179.5 Cr
EMD Value
₹2.1 Cr
Closing Date
26 Feb 2024, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Karnataka Urban Water Supply and Drainage Board
T N Muddurajanna
Providing combined water supply scheme to Kudligi, Kotturu, Huvinahadagali, Hagaribommnahalli & Kamalapur towns under AMRUT 2.0 including Operation & Maintenance for a period of 5 years (including 1 year DLP) through Design, Build Operation and Transfer (DBOT) mode. (lumpsum tender - No variation)
KUWSDB/2023-24/WS/WORK_INDENT124
KUWSDB/2023-24/WS/WORK_INDENT124
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
KUWSDB Chief Engineer Revenue zone Kalaburagi
7 documents required · 7 mandatory
As per clause 3 of Sec 2 (ITT)
As per clause 3 of Sec 2 (ITT)
As per clause 3 of Sec 2 (ITT)
As per clause 3 of Sec 2 (ITT)
As per clause 3 of Sec 2 (ITT)
Qualification Information Form
₹7,500
₹2.1 Cr
9 Nov 2026
20 Jan 2024
28 Feb 2024
6 Feb 2024
6 Feb 2024
Providing combined water supply scheme to Kudligi, Kotturu, Huvinahadagali, Hagaribommnahalli & Kamalapur towns under AMRUT 2.0 including Operation & Maintenance for a period of 5 years (including 1 year DLP) through Design, Build Operation and Transfer (DBOT) mode. (lumpsum tender - No variation)
Part A: CAPEX Works: Kamlapur town:
Conducting detailed Topographical survey & preparation of design & drawings both hydraulic & structural as per tender specifications & CPHEEO norms with relevant ...
Part A: CAPEX Works: Kamlapur town:Repairs and Renovation of Existing 4.54MLD Water Treatment Plant & Elevated Service Reservoirs: Including the following, Dismantling & replastering of old surface,...
Part A: CAPEX Works: Kamlapur town:DI & MS Feeder main: Design, Providing ,laying, jointing, testing and commissioning of MS (Minimum dia. 406mm , 6.40mm thk) & DI K-9 (Minimum dia. 250mm and 200mm) P...
Part A: CAPEX Works: Kamlapur town:Construction of Service Reservoirs to meet the storage requirements with minimum 10 LL ELSR on 15 M staging including D I valves of required size, RCC valve chamber ...
Part A: CAPEX Works: Kamlapur town:Distribution Network (Minimumlength of 60.40Kms) :Survey, design,Providing ,laying, jointing, testing and commissioning of DI K7/HDPE PE100 PN8 class (Min 90mm diame...
Part A: CAPEX Works: Kamlapur town:House Service Connections: Providing minimum 6000 House Service Connections with AMR compatible B class water meters as per tender requirements, design criteria, ap...
Part A: CAPEX Works: Hadagali town: Conducting detailed Topographical survey & preparation of design & drawings both hydraulic & structural as per tender specifications & CPHEEO norms with relevant ...
Part A: CAPEX Works: Hadagali town:Feeder mains (Minimumlength of 1.89KM) : Design,Providing laying, jointing, testing and commissioning of DI K-9 200/150 DI K9 (Minimum dia. 200mm and 150mm) Pure wa...
Part A: CAPEX Works: Hadagali town:Construction of Service Reservoirs to meet the storage requirements with minimum 5 LL ELSR on 15 M staging - 1 Nos, 2.5 LL ELSR on 15 M staging including D I valves ...
Part A: CAPEX Works: Hadagali town: Pure water sump of 0.25LL Capacity: Constrcution of 0.25 LL pure water RCC sump cum pump house and SCF booster pumpset in zone 6 to feed proposed to 2.5LL ELSR as...
Part A: CAPEX Works: Hadagali town:Distribution Network (Minimum network length of 26.38Kms): Survey, design,Providing laying, jointing, testing and commissioning of DI K7/HDPE PE100 PN8 class (Min 75...
Part A: CAPEX Works: Hadagali town:House Service Connections: Providing minimum 2749 House Service Connections with AMR compatible B class water meters as per tender requirements, design criteria, app...
Part A: CAPEX Works: HB Halli town: Conducting detailed Topographical survey & preparation of design & drawings both hydraulic & structural as per tender specifications & CPHEEO norms with relevant ...
Part A: CAPEX Works: HB Halli town:Replacement works in Existing Raw water rising main : Repalcement of Air valves, isolatation valves, and supply laying of MS 457mm, 6.4mm thick pipes for length of 2...
Part A: CAPEX Works: HB Halli town:Repair & Renovation of 10.54 MLD WTP : Repairs and Renovation of Existing 10.54 MLD Water Treatment Plant including following chipping loose surface and waterproof t...
Pure water pumping Machinery : Design, Supply, Erection, Electrification, testing and Commissioning of 150 HP /suitable HP Submersible Centrifugal Pump sets in Exisiting 10.54 MLD WTP at HB Halli c...
Part A: CAPEX Works: HB Halli town:Pure Water rising main (Minimum length of 4.11km) : Design,Providing laying, jointing, testing and commissioning of D.I K-9 (Minimum dia 400, 350,250, 200, 150 mm)...
Part A: CAPEX Works: HB Halli town:Construction of Service Reservoirs to meet the storage requirements with minimum 5 LL ELSR on 15 M staging - 1 Nos at zone-06, and 2.5 LL ELSR on 15 M staging 1 No...
Part A: CAPEX Works: HB Halli town:Distribution Network (Minimum network length of 66.74Kms): Survey, design,Providing laying, jointing, testing and commissioning of DI K7/HDPE PE100 PN8 class (Min 7...
Part A: CAPEX Works: HB Halli town:House Service Connections: Providing minimum 3400 House Service Connections with AMR compatible B class water meters as per tender requirements, design criteria, app...
Part A: CAPEX Works: HB Halli town:Online monitoring System: Design, Manufacturing, Supplying, Installing, testing and successful commissioning of Online monitoring System for quality, quantity & lev...
Part A: CAPEX Works: Kottur town:Conducting detailed Topographical survey & preparation of design & drawings both hydraulic & structural as per tender specifications & CPHEEO norms with relevant IS ...
Part A: CAPEX Works: Kottur townRaw water pumping machinery & allied works(at existing Jack well Bannigola): Design,supply,Erection,Electrification, Testing & commissioning at site brand new best effi...
Part A: CAPEX Works: Kottur town:Raw water rising main from existing Jackwell at Bannigola to existing IPS at Benkal (406mm MS, 6.4mm thick of minimum length of 35.85KM) and from existing IPS to propo...
Part A: CAPEX Works: Kottur town:Raw water pumping machinery & allied works in existing IPS at Benkal): Design,supply,Erection,Electrification, Testing & commissioning at site brand new best efficient...
Part A: CAPEX Works: Kottur town:Design, supply, construction, installation, testing, commissioning 7.8 MLD Water Treatment Plant at Dhoopadahalli ( Acrator to tube settlers -7.8 MLD and Filtration u...
Part A: CAPEX Works: Kottur town:Pure Water pumping Machinery : Design, Supply, Erection, Electrification, testing and Commissioning of 240 HP / suitable HP Centrifugal Pumping Machinery with 100% sta...
Part A: CAPEX Works: Kottur town:11KV Express Feeder main Design, Supply, Erection of 11KV express feeder main from Kottur Substation to Proposed WTP near Doopadahalli village as per tender requireme...
Part A: CAPEX Works: Kottur town:Pure Water rising main(Minimum MS 3.44 km & DI 3.96 Km) : Design,Providing laying, jointing, testing and commissioning of MS (Minimum dia 355.6mm 6.4mm thick) and D.I...
Part A: CAPEX Works: Kottur town:Construction of Service Reservoirs to meet the storage requirements with minimum 10 LL ELSR on 15 M staging - 1 Nos, 5 LL ELSR on 15 M staging - 1 Nos, and 2.5 LL ELS...
Part A: CAPEX Works: Kottur town:Repair and renovation of Existing Jack well and IPS: Increaseing the opening in existing intake well, supply, erection of sutable size ISMB girders utilizing 50% of ex...
Part A: CAPEX Works: Kottur town:Repair and renovation of Existing sump & pumphouse at Benkal: Repair and renovation of Existing sump includes removal of old plaster of existing sump and providing int...
Part A: CAPEX Works: Kottur town:Online monitoring System: Design, Manufacturing, Supplying, Installing, testing and successful commissioning of Automation/scada System for quality, quantity & levels...
Part A: CAPEX Works: Kudalgi town:Conducting detailed Topographical survey & preparation of design & drawings both hydraulic & structural as per tender specifications & CPHEEO norms with relevant IS...
Part A: CAPEX Works: Kudalgi town:Panel room(6M x 3M) : Design, construction of panel room of size 6M x 3M over the clear water sump at Pavagada MVWSS at Shivapura WTP, walls will be BBM and Roof sla...
Part A: CAPEX Works: Kudalgi town:Pure water pumping Machinery : Design, Supply, Erection, Electrification, testing and Commissioning of 150 HP /suitable HP Submersible Centrifugal Pump with 100% st...
Part A: CAPEX Works: Kudalgi town:11KV Express Feeder main : Design, Supply, Erection of 11KV express feeder main from Hansi Substation to clear water sump of WTP at Shivapura as per tender requiremen...
Part A: CAPEX Works: Kudalgi town:Pure Water rising main(Minimum length of 14.2 km) : Design,Providing laying, jointing, testing and commissioning of D.I K-9 (Minimum dia 400, 300, 250, 200 & 100 mm) ...
Part A: CAPEX Works: Kudalgi town:Constrcution of Inline chlorination system and housing room (5m x 4.5m) : Constrcution of Inline chlorination room of size 5m x 4.5m near ITI college and Design,suppl...
Part A: CAPEX Works: Kudalgi town:Construction of Service Reservoirs to meet the storage requirements with minimum 15 LL ELSR on 15 M staging - 1 Nos, 7.5 LL ELSR on 18 M staging - 1 Nos, 5 LL ELSR on...
Part A: CAPEX Works: Kudalgi town:Distribution Network : Survey, design,Providing laying, jointing, testing and commissioning of DI K7/HDPE PE100 PN8 class Min 75mm) Pure water distribution system cov...
Part A: CAPEX Works: Kudalgi town:House Service Connections: Providing minimum 6500 House Service Connections with AMR compatible B class water meters as per tender requirements, design criteria, appr...
Part A: CAPEX Works: Kudalgi town:Online monitoring System: Design, manufacturing, supplying, Installing, testing and successful commissioning of Online monitoring system for quality, quantity & leve...
Operation & Maintenance during the 1st year i.e., during the defects liabiliuty period of Improvement Water Supply to Kamalapur Town. which includes maintenance of proposed Feeder mains, Proposed ...
Operation & Maintenance during the 2nd year: Improvement Water Supply to Kamalapur Town. which includes maintenance of proposed Feeder mains, Proposed OHTs, Distribution networks including HSC & exi...
Operation & Maintenance during the 3rd year:Improvement Water Supply to Kamalapur Town. which includes maintenance of proposed Feeder mains, Proposed OHTs, Distribution networks including HSC & exis...
Operation & Maintenance during the 4th year:Improvement Water Supply to Kamalapur Town. which includes maintenance of proposed Feeder mains, Proposed OHTs, Distribution networks including HSC & exis...
Operation & Maintenance during the 5th year:Improvement Water Supply to Kamalapur Town. which includes maintenance of proposed Feeder mains, Proposed OHTs, Distribution networks including HSC & exis...
Operation & Maintenance during 1st year. During the defects liability period of water supply scheme to Huvinahadagali town, which includes maintenance of proposed feeder main, Proposed OHTs, Distribu...
Operation & Maintenance during 2nd year. Improvement Water Supply to Huvina Hadagali town. which includes maintenance of proposed feeder mains, proposed OHTs, distribution networks, HSC etc., inclu...
Operation & Maintenance during 3rd year. Improvement Water Supply to Huvina Hadagali town. which includes maintenance of proposed feeder mains, proposed OHTs, distribution networks, HSC etc., inclu...
Operation & Maintenance during 4th year. Improvement Water Supply to Huvina Hadagali town. which includes maintenance of proposed feeder mains, proposed OHTs, distribution networks, HSC etc., incl...
Operation & Maintenance during 5th year. Improvement Water Supply to Huvina Hadagali town. which includes maintenance of proposed feeder mains, proposed OHTs, distribution networks, HSC etc., inclu...
Operation & Maintenance during the 1st year i.e., during the defects liabiliuty period of Improvement Water Supply to HB halli town. which includes pure water pump sets, maintenance of proposed F...
Operation & Maintenance during the 2nd year: Improvement Water Supply to HB halli town. which includes pure water pump sets, maintenance of proposed Feeder mains, proposed OHTs, Distribution networ...
Operation & Maintenance during the 3rd year: Improvement Water Supply to HB halli town. which includes pure water pump sets, maintenance of proposed Feeder mains, proposed OHTs, Distribution network...
Operation & Maintenance during the 4th year: Improvement Water Supply to HB halli town. which includes pure water pump sets, maintenance of proposed Feeder mains, proposed OHTs, Distribution networ...
Operation & Maintenance during the 5th year: Improvement Water Supply to HB halli town. which includes pure water pump sets, maintenance of proposed Feeder mains, proposed OHTs, Distribution networ...
Operation & Maintenance during 1st year. During the defects liability period of water supply scheme to Kottur town, which includes maintenance of raw water rasing main, IPS at Benkal, new WTP, clear w...
Operation & Maintenance during 2nd year: Improvement Water supply scheme to Kottur town, which includes maintenance of raw water rasing main, IPS at Benkal, new WTP, clear water raising main, raw & cl...
Operation & Maintenance during 3rd year: Improvement Water supply scheme to Kottur town, which includes maintenance of raw water rasing main, IPS at Benkal, new WTP, clear water raising main, raw & c...
Operation & Maintenance during 4th year: Improvement Water supply scheme to Kottur town, which includes maintenance of raw water rasing main, IPS at Benkal, new WTP, clear water raising main, raw & c...
Operation & Maintenance during 5th year: Improvement Water supply scheme to Kottur town, which includes maintenance of raw water rasing main, IPS at Benkal, new WTP, clear water raising main, raw & cl...
Operation & Maintenance during the 1st year i.e., during the defects liabiliuty period of Improvement Water Supply to Kudligi town. which includes clear water pumpsets, maintenance of proposed fee...
Operation & Maintenance during the 2nd year: Improvement Water Supply to Kudligi town. which includes clear water pumpsets, maintenance of proposed feeder mains, proposed OHTs, distribution networks,...
Operation & Maintenance during the 3rd year: Improvement Water Supply to Kudligi town. which includes clear water pumpsets, maintenance of proposed feeder mains, proposed OHTs, distribution networks,...
Operation & Maintenance during the 4th year i.e., during the defects liabiliuty period of Improvement Water Supply to Kudligi town. which includes clear water pumpsets, maintenance of proposed Fee...
Operation & Maintenance during the 5th year: Improvement Water Supply to Kudligi town. which includes clear water pumpsets, maintenance of proposed feeder mains, proposed OHTs, distribution networks,...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
5 Towns WSS DBOT Sec-7.docx
Others - Section 7 • 0.79 MB
Part 3 DWG.zip
Others - Drawings • 45.97 MB
Part 4 DWG.zip
Others - Drawings • 33.01 MB
Part 2 DWG.zip
Others - Drawings • 65.36 MB
DTS_Kudligi_Kotturu_Huvinahadagali_HB_halli_Kamalpur_dated_19_01.doc
Tender Document • 5.62 MB
Tender notification of Humnabad Chitguappa.doc
Others - Notice Inviting Tender • 0.12 MB
Part 1 DWG.zip
Others - Drawings • 49.42 MB
Addendum06-02-2024.pdf
pdf • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .