| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.3 LAccepted-AOC | 1 | Accepted-AOC L1 of bidder is accepted. |
| Sl No | Description | Qty | Unit | Reginald Michael Dhas L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders. | 36.5 | cu.m | 7,300 ₹8,614 Lowest |
| 2.00 | Providing PCC 1:4:8 using 40mm HBG metal including cost of all materials, lead, lift, labour, curing etc., complete. | 5.1 | cu.m | 2,652 ₹3,129.36 Lowest |
| 3.00 | Providing PCC 1:3:6 using 40mm HBG metal including cost of all materials, lead, lift, labour, curing etc., complete. | 8 | cu.m | 4,400 ₹5,192 Lowest |
| 4.00 | R.R.Masonry in CM 1:6 using rough stone including cost of all materials,Labour ,Lead ,Lift,curing etc.,complete | 35 | cu.m | 1,75,000 ₹2,06,500 Lowest |
| 5.00 | Refilling with excavated soil complying with standard specification for filling in foundation and basement,including cost of Labour and tools,Lead,Lift,etc.,complete. | 11.5 | cu.m | 402.5 ₹474.95 Lowest |
| 6.00 | Filling with well gravel in basement with well watering and consolidation as per standard specification etcincluding cost of M.sand, Labour,Lead, Lift etc.,complete. | 14.5 | cu.m | 6,525 ₹7,699.5 Lowest |
| 7.00 | Pointing with CM 1:3 flush pointing Random Rubble masonry | 18 | sq.m | 4,500 ₹5,310 Lowest |
| 8.00 | Brickwork in CM 1;5 mix using 11nd class chamber burnt brick of size 9"x4 3/8"x2 3/4 including cost of materials,Labour, Lead,Lift, curing etc,complete | 24 | cu.m | 1,51,200 ₹1,78,416 Lowest |
| 9.00 | RCC 1:1.5:3 mix using 12 to 20mm HBG metal including cost of all materials Lead, Lift,Centering & shuttering charges ect complete,but excluding cost and Labour for steel reinforcement rods - for plinth beam | 2.65 | cu.m | 35,907.5 ₹42,370.85 Lowest |
| 10.00 | RCC 1:1.5:3 mix using 12 to 20mm HBG metal including cost of all materials Lead, Lift,Centering & shuttering charges ect complete,but excluding cost and Labour for steel reinforcement rods - for Lintel | 1 | cu.m | 17,500 ₹20,650 Lowest |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
4 Oct 2025, 2:00 pmClosed
superintending Engineer
KKEDC Nagercoil
Construction of AEE Distribution office building at Kulesekeram
2025_EB_605241_1
KKEDC/04/2025-26
Open Tender
Civil Works
Item Rate
180 days
O/o thesuperintending Engine
as per specification
3 documents required · 3 mandatory
₹0
₹16,000
Yes
17 Nov 2025
22 Sept 2025
6 Oct 2025
22 Sept 2025
4 Oct 2025
23 Sept 2025
22 Sept 2025 - 3 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .