| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC 159 KASIYADIH TANDWA CHATRA CHATRA JHARKHAND 825321 | CHATRA | JHARKHAND | 825321 | L1 | Accepted-AOC Techno commercially qualified | |
| 2 | Rejected-Technical AT KHAS KAJORA COLLIERY P O KAJORA GRAM DIST PASCHIM BARDHAMAN WEST BENGAL 713338 | PASCHIM BARDHAMAN | WEST BENGAL | 713338 | - | Rejected-Technical DOCUMENTS NOT VERIFIED | |
| 3 | Rejected-Technical AT GUNJARDIH BHANDARIDAH DIST BOKARO PIN 829132 | BHANDARIDAH | BOKARO | JHARKHAND | 829132 | - | Rejected-Technical DOCUMENTS NOT VERIFIED |
Tender Value
Refer Docs
EMD Value
₹3,200
Closing Date
30 Sept 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AKHIL UJJWAL,PE(EnM),SDOCM
OFFICE OF THE PROJECT OFFICER,SDOCM,DHORI AREA,CCL
(A)Extension of 220V Turiyo colony OH line near Turiyo basti upto shiv mandir for lighting purpose. (B) Extension/re-organization of 220V OH line from near CISF barrack A company to Karipani road weigh bridge in r/o SDOCM
2024_CCL_317970_7
SDOCM/PE(EnM)/e.NIT/24-25/09 dt.21.09.2024
Open Tender
Electrical and Maintenance Works
Item Wise
10 days
SDOCM
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,200
2 Nov 2024
21 Sept 2024
1 Oct 2024
21 Sept 2024
30 Sept 2024
21 Sept 2024
21 Sept 2024 - 28 Sept 2024
Amount
Extension of 220V Turiyo colony O H line near Turiyo basti upto shiv mandir for lighting purpose in r/o SDOCM (Rate Not Filling)
Erection of metallic pole of following length in cement concrete 1:3:6(1 cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required.Above 08 mtr upto 10 mtr long
Erection of all aluminium conductor of 7/1.96 mm to 7/3.10 mm diameter including binding etc. as required 05 span x 25mtr x 02 wire= 250 mtr x 214 kg/km= 53.50 kg
Supplying and erection of stay set complete (galvanised) with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, turn buckle ( 20 mm X 60 cm ), 7/ 3.15 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required.
Supplying and erection of 100 mm X 110 mm shackle insulator with G. I. Bolt, nuts and straps etc. as required .
Supplying and erection of 100 mm X 80 mm pin insulator complete with G. I. Spindle and nuts etc. as required.
Supply of 8 SWG GI wire for cradling 04 span x02 side x25 mtr= 200 + 30%(60)= 260 mtrx0.131kg/mt- 34.06 kg
Ercetion of cradle wire 06 x 20 nos
Providing of 2 wire system spacer
Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for 2 wire over head line complete with clamps, bolts, nuts and washer etc including drilling of holes for insulator pins etc (as per drawing) and painting with primer and finished paint as reauired.
Erection of pole top/ straight two wire/ V shape two wire, angle iron/ channel iron, cross arm on steel tubular/ rail/ PCC pole as required.
Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required.
Loading & unloading of pole from dismantle place to proposed place (Truck Departmental)
Dismantling of over head lines comprising of copper/ aluminum overhead conductor, G.I. wire, cross arms, insulators etc. as required Conductor 05 span x 25 mtr x 02 wire= 250 mtr x 214 kg/km= 53.50 kg Iron material-channel arm – 08 x 1.2 mtr – 9.6 mtr x 7.14 kg/mtr- 68.54 LT pin insulator- 08 set x 0.5 kg – 04.00 kg LT shackle insulator-02 set x 0.5 kg- 01.00 kg
Dismantling of light set from top of the pole
Fitting of light set from top of the pole
Extension/re-organisation of 220V O H line from near CISF barrack ‘A’ company to Karipani road weigh bridge in r/o SDOCM (RATE NOT FILLING)
Erection of metallic pole of following length in cement concrete 1:3:6(1 cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required.Above 08 mtr upto 10 mtr long
Erection of all aluminium conductor of 7/1.96 mm to 7/3.10 mm diameter including binding etc. as required 06 span x 25mtr x 02 wire= 300 mtr x 214 kg/km= 64.20 kg
Supplying and erection of stay set complete (galvanised) with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, turn buckle ( 20 mm X 60 cm ), 7/ 3.15 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required.
Supplying and erection of 100 mm X 110 mm shackle insulator with G. I. Bolt, nuts and straps etc. as required .
Supplying and erection of 100 mm X 80 mm pin insulator complete with G. I. Spindle and nuts etc. as required.
Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for 2 wire over head line complete with clamps, bolts, nuts and washer etc including drilling of holes for insulator pins etc (as per drawing) and painting with primer and finished paint as reauired.
Erection of pole top/ straight two wire/ V shape two wire, angle iron/ channel iron, cross arm on steel tubular/ rail/ PCC pole as required.
Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required.
Loading & unloading of pole from dismantle place to proposed place (Truck Departmental)
Dismantling of over head lines comprising of copper/ aluminum overhead conductor, G.I. wire, cross arms, insulators etc. as required Conductor 06 span x 25 mtr x 02 wire= 300 mtr x 214 kg/km= 64.20 kg Iron material-chennel arm – 06 x 1.2 mtr – 7.20 mtr x 7.14 kg/mtr- 51.40 (for conductor) LT pin insulator- 10 set x 0.5 kg – 05.00 kg LT shackle insulator-02 set x 0.5 kg- 01.00 kg
Dismantling of light set from top of the pole
Fitting of light set from top of the pole
Total impact of GST for the purpose of CTC
MAHTO ENTERPRISES
M/S MANOJ KUMAR SINGH
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .