| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 CrAccepted-AOC 1A 20 EAST SEERANAGAPALAYAM ROAD SALEM 63607 | 63607 | ₹11.2 Cr Quoted ₹11.7 Cr | L1 | Accepted-AOC Low tender premium |
| 2 | L2₹12.0 CrRejected-Finance 10 243 THURAIYUR MAIN ROAD PONNERI POST NAMAKKAL 637013 | NAMAKKAL | TAMIL NADU | 637013 | ₹12.0 Cr | L2 | Rejected-Finance High tender premium |
| 3 | Rejected-Technical | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | ASHOK CONSTRUCTION L2 | VRV CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Forming the embankment using carted earth having soaked CBR value not less than 8 required including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking colds, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 95% proctor density to the specified depth below the subgrade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc.complete as per clause 305 of MoRTH specifications. | 18,792 | Cum | 652.7 ₹1.2 Cr | 637.45 ₹1.2 Cr |
| 2.00 | Excavation including removal and satisfactory disposal of all materials necessary for the construction of road side drains in accordance with the specification and the lines ,grades and cross section short in the diagram or as indicated by the engineer in chaarge for boxing as per clause of MoRTH 301 & 305 and conveying the excavated earth (For Cutting Qty) | 748 | Cum | 141.12 ₹1.1 L | 137.83 ₹1.0 L |
| 3.00 | Forming the Sub Grade using carted earth having soaked CBR value not less 8 than required including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking colds, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 97% proctor density to the specified depth below the subgrade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc.complete as per clause 305 of MoRTH specifications. | 13,678 | Cum | 665.54 ₹91.0 L | 649.99 ₹88.9 L |
| 4.00 | Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material | 3,633 | Cum | 2,279.85 ₹82.8 L | 2,226.58 ₹80.9 L |
| 5.00 | Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material | 2,424 | Cum | 2,571.99 ₹62.3 L | 2,511.9 ₹60.9 L |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of specified thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision | 4,150 | Cum | 2,784.19 ₹1.2 Cr | 2,719.14 ₹1.1 Cr |
| 7.00 | Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision | 16,600 | Sqm | 92.88 ₹15.4 L | 90.71 ₹15.1 L |
| 8.00 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision | 16,600 | Sqm | 21.51 ₹3.6 L | 21 ₹3.5 L |
| 9.00 | Providing, laying 70 mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20 mm, 0.25 cumof 13.20-2.36 mm and 0.23 cum of 2.36 mm & below and with 53.20 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of allmaterials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spread ing the mix to uniform thickness of 50 mm using paver to the specified grade sand crosssection sand compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller sand all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 as per clause No.111,112,501,505 & 900 - of MORTH rev-5.-Grading II | 1,162 | Cum | 11,972.59 ₹1.4 Cr | 11,692.86 ₹1.4 Cr |
| 10.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision | 498 | Cum | 12,994.11 ₹64.7 L | 12,690.51 ₹63.2 L |
Tender Value
₹11.2 Cr
EMD Value
₹5.8 L
Closing Date
24 Sept 2025, 11:30 amClosed
Superintending Engineer
Office of the Superintending Engineer Highways Projects Circle Near North Kovai Flyover Mettupalayam Road Coimbatore
Forming Approach road to Rasipuram new Bus stand Km.0/0 to 1/700.
2025_HWAY_599671_1
TN NO 09/2025-26/Rasipuram Approach
Open Tender
Civil Works - Highways
270 days
Anaipalayam, Rasipuram
Refer Pre Qualification Volume I
11 documents required · 11 mandatory
₹0
₹5.8 L
26 May 2026
2 Sept 2025
25 Sept 2025
2 Sept 2025
24 Sept 2025
3 Sept 2025
Amount
Forming the embankment using carted earth having soaked CBR value not less than 8 required including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking colds, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 95% proctor density to the specified depth below the subgrade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc.complete as per clause 305 of MoRTH specifications.
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road side drains in accordance with the specification and the lines ,grades and cross section short in the diagram or as indicated by the engineer in chaarge for boxing as per clause of MoRTH 301 & 305 and conveying the excavated earth (For Cutting Qty)
Forming the Sub Grade using carted earth having soaked CBR value not less 8 than required including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking colds, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 97% proctor density to the specified depth below the subgrade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc.complete as per clause 305 of MoRTH specifications.
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of specified thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision
Providing, laying 70 mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20 mm, 0.25 cumof 13.20-2.36 mm and 0.23 cum of 2.36 mm & below and with 53.20 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of allmaterials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spread ing the mix to uniform thickness of 50 mm using paver to the specified grade sand crosssection sand compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller sand all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 as per clause No.111,112,501,505 & 900 - of MORTH rev-5.-Grading II
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision
CONSTRUCTION OF BOX CULVERT OF SIZE 2M X2M AND RETAINING WALL AT CH:030.000
Depth 6.0m Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION of Culvert and Retaining wall at Ch:30.to 7.0m
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE OF BOX CULVERT AND RETAINING WALL at Ch:30
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BOX CULVERT BASE SLAB AND WALL at Ch:030
Supply and fabrication of Fe-500 D steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete. as per Section 2706 of MORT&H Specficaton (Fifth Revision-2013) for Box Culvert at Ch:030
Vibrated Cement Concrete of Grade M-20, Nominal Mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for FOOTING OF RETAINING WALL
Vibrated Cement Concrete of Grade M-20, Nominal Mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for RETAINING WALL (BELOW GROUND LEVEL) at Ch:030
Vibrated Cement Concrete of Grade M-20, Nominal Mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for RETAINING WALL (ABOVE GROUND LEVEL) at Ch:030
Vibrated Cement Concrete of Grade M-20, Nominal Mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for PARAPETS over Culvert and Reataining Wall at Ch:030
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges formwork cost of remolded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab. as per Section 2702.2 of MORT&H Specficaton (Fifth Revision-2013) over Culvert at Ch:030.
Providing and fixing PVC seepage pipes of 110mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in Retaining Wall at Ch:030.
RECONSTRUCTION OF BOX CULVERT OF SIZE 6M X 3M AT CH:1066
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of masonry, cement concrete, wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead. (Existing Culvert Structure PCC) at Ch:1066
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of masonry, cement concrete, wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead. (Existing Culvert Structure RCC) at Ch:1066
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION of Culvert and Wing Wall at Ch:1066
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for LEVELLING COURSE of Culvert and Wing Wall at Ch:1066
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BOX CULVERT BASE SLAB, SIDE WALL AND TOP SLAB at Ch:1066
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Wing Wall (Below Ground Level) at Ch:1066
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Wing Wall (Above Ground Level) at Ch:1066
Supply and fabrication of Fe-500 D steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete. as per Section 2706 of MORT&H Specficaton (Fifth Revision-2013) for Box Culvert at Ch:1066
Vibrated Cement Concrete of Grade M-20, Nominal Mix 1:1.5:3 using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for PARAPETS over Culvert at Ch:1066
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges formwork cost of remolded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab. as per Section 2702.2 of MORT&H Specficaton (Fifth Revision-2013) over Culvert at Ch:1066
CONSTRUCTION OF SINGLE ROW PIPE CULVERT OF DIA 1000 MM AT CH :1660
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank as per SS20B with all leads and lifts and all other icidental charges such as baling out water shoring shrutting walling and forming protective bunds wherever necessary etc.,comlete as per relavant specification for Foundation of Culvert as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision at Ch:1660
Filling under the pipes with Stone dust including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete at Ch:1660.
Vibrated Plain Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Foundation of Culvert as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision at Ch:1660
Vibrated Plain Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG gradedmetal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Body wall (Below Ground Level) as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision at Ch:1660
Vibrated Plain Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Body wall (Above Ground Level) as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision at Ch:1660
Vibrated Plain Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Parapets over the culvert as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision at Ch:1660
Refilling Behind in between Culvert with with earth including cost and conveyance to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete. as per CI.710.1.4 & Appendix 6 of IRC :78-2014 at Ch:1660
Supply of NP3class RCC 1000mm dia hume pipes of 2.50m length confirming to IS458/1989 cost of pipes including all other incidental charges , testing charges, including Loading and Unloading charges, transport and delivery in good condition at work site as directed by the departmental officers etc., complete as per clause 1013,2900 & 2911 of MORTH Vth Revision at Ch:1660
Hoisting and fixing of NP3 class RCC1000 mm dia pipes to proper gradient including all labour charges and allother incidental charges etc.,complete as per clause 2905 & 2906 of MORTH Vth Revision at Ch:1660
PROVIDING BRANCH ROAD IMPROVEMENTS FOR APPROACH ROAD TO RASIPURAM NEW BUS STAND
Forming the embankment using carted earth having soaked CBR value not less than 8 required including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking colds, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 95% proctor density to the specified depth below the subgrade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc.complete as per clause 305 of MoRTH specifications.
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road side drains in accordance with the specification and the lines ,grades and cross section short in the diagram or as indicated by the engineer in chaarge for boxing as per clause of MoRTH 301 & 305 and conveying the excavated earth (For Cutting Qty)
Forming the Sub Grade using carted earth having soaked CBR value not less 8 than required including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking colds, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 97% proctor density to the specified depth below the subgrade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc.complete as per clause 305 of MoRTH specifications.
Milling the existing BT surface 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the work site to an average distance including hire and running charges for the machine,conveyance charges,unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental charges etc. complete as per the direction of the departmental officers
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials away from the site complete as per standard specification for Boxing as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision
Construction of Granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material
Construction of Granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of specified thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision
Providing, laying 70 mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20 mm, 0.25 cumof 13.20-2.36 mm and 0.23 cum of 2.36 mm & below and with 53.20 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of allmaterials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spread ing the mix to uniform thickness of 50 mm using paver to the specified grade sand crosssection sand compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller sand all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 as per clause No.111,112,501,505 & 900 - of MORTH rev-5.-Grading II
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision
Dismantling the existing Plain Cement concrete in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the Departmental Officers including all labour and incidental charges etc., complete.
Earth work excavation in all classes of soils such as hard rock requiring blasting and depositing on bank with all leads and lifts as per S S 20 B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavaion back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for foundation of abutment and wings.
Plain Cement Concrete Grade M15 Nominal mix 1:2:4 using 40 mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charged such as maintaining of protective bunds, cofferdam, shoring, strutting etc.,complete as per relevant standard specification and LEVELLING COURSE.
Vibrated Plain Cement Concrete M20 Grade using 20 mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools and Plants and incidental charges such as sheeting, shoring and bracing and their subsequent removel etc., complete as per standard specification for footings of Abutment and Wings - Below Sill Level
Vibrated Plain Cement Concrete M.20. Grade using 40 mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools and Plants and incidental charges such as sheeting, shoring and bracing and their subsequent removel etc., complete as per standard specification for substructure of Abutment and Wings - Above Sill Level
Vibrated reinforced cement concrete grade M25 Design mix using 20mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges compacting, finishing and curing, including all incidental charges etc. complete for Bed block and Dirt wall
Vibrated reinforced cement concrete grade M25 Design mix using ISS 20mm size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges compacting, finishing and curing, including all incidental charges etc. complete for Deck Slab.
Vibrated cement concrete grade M30 Design mix using ISS size 20mm HGB graded metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, cincluding all incidental charges etc. complete for Wearing coat 75mm uniform thickness over deck slab.
Providing and fixing kraft paper for full width of seating of deck spab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc. complete.
Supply and fabrication of Steel Grade Fe - 500D required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification ( 16 mm and Below 16mm Dia)
Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in betweendecks over piers and in between deck and dirt wall over abutment as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete
Providing and fixing 110 mm dia PVC sepage pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and conveyance of all materials tto worksite, cost and labour for semisperial backfill arrangements with 100 mm size broken granite stones at the periphery and labour charges for fixing etc. complete to drain the backfill as per standard specification.
Vibrated cement concrete grade M20 Nominal mix 1:1.5:3 using graded 40mm ISS HGB graded metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing , transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for PARAPETS.
Refilling in between Wing wall and Road with excavated earth including cost and conveyence to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get themaximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision Specifications (labour charges only)
Providing Barrier Type Kerb for median/ islands using vibrated cement concrete of grade M20 (1:1.5:3) using 20 and 12mm ISS HBG metal from approved quarry, including cost and conveyance of all materials to work site, including hire and fuel charges of all the machineries employed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc., complete as per drawing and standard specification.
Filling with gravel including cost and conveyence to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per MORTH Vth Revision Specifications No. 304, 2907 for Median and Island
Providing Road Furniture and Signages
Providing and laying of hot applied Thermoplastic compound 2.5 mm. thick including reflectorising glass beads @ 250 gms. per sqm. area, thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Providing and fixing reflective road studs of 'category A' Raised pavement markers made out of poly carbonate / ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro-reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MORTH circular No RW/NH. 33023/10/97-DO.III dt 11.06.97 and the height,width and length shall not be less than 15mm, 90mm and 100mm and with minimum reflective area of 13sq.cm on each side and the slope to the base shall be 35+/- 5 degree.Each reflector shall have a CIL not less than values specified in Table2 of said MORTH circular.The strength of deatchment of the integrated cylindrical shanks,(of diamter not less than 19*/- 2 mm and height not less than 30*/- 2mm )from the body is to be a minimum value of 500kgf.Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manifacture's recommendation and complete as directed by the engineer. The marker shall support a load of 13635Kg tested in accordance with ASTM D4280 and confirming to IRC35-2015 guide lines and MORTH specification 804 etc., complete.
Providing and fixing of retro reflectorised cautionary mandatory and informatiory signs(without definitionboard) made out of high intensity Prismatic grade sheeting confirming to Type IV standards of IRC 67-2012 and ASTM D 4956-09 , specification and fixed over 2mm thick alumininum sheet fixed over a back supporting frame of 25mm X 25mm X 3mm mild steel angle and supportred on mild steel angle iron post 75 mm X 75mm X6mm with a clear height not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level.The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly desigmed foundation with M15 grade cement concrete 45mm X 45mm X 60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge.High intensity Retro-Reflectro sheet shall consist of minimum coefficient of retro-Reflction as per Table 6.6 of IRC 67-2012.The retro-reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67-2012 (as per MORTH specification no 801)(60 cm cirular board)
60 cm circular board
80cm X 60cm Rectangular board
90 cm equilateral triangle
90 cm octagon board
Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2022 and ASTM D 4956–09, specification and fixed over 2mm thick Aluminiumsheet fixed over a back supporting frame of25mmx25mmx3mm Mild Steel angle and supported ona mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to thebottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2022 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer- incharge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2022. The retro- reflective sheeting shallbe covered under 7 year warranty issued for fieldperformance and a certified copy of three yearsoutdoor exposure report shall be obtained as per IRC67:2022. (as per MoRT&H Specification No.801)
For sign having area upto 0.9 sqm type IV
For sign having area more than 0.9 sqm type IV
Providing and erecting of retro refectorised Hazard Marker Traffic sign made out of HIgh Intensity Prismatic Grade sheeting confirming to TYPE-IV standards of IRC 67-2022 and ASTM D 4956-09, specification and fixed over 2mm thick alumininum sheet fixed over a back supporting frame of 25mm X 25mm X 3mm mild steel angle and supportred on mild steel angle iron post 75 mm X 75mm X6mm with a clear height not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level.The sign post should be painted as per IRC 67-2022 and firmly fixed to the ground by means of properly desigmed foundation with M15 grade cement concrete 45mm X 45mm X 60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge.High intensity Retro-Reflectro sheet shall consist of minimum coefficient of retro-Reflction as per Table 6.6 of IRC 67-2022.The retro-reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67-2022(as per MORTH specification no 801)
Supply and fixing of RCC guide post of size1.20 x 0.20 x 0.20 m with reflective star stickers with tin M.s sheet with two side packing and top cover of 0.75 inches in RCC 1: 2: 4 Mix using 20 mm HBG ISS metal with 10 mm.dia bars as vertical with 8mm dia Stirrups including 8.25inches x 4.25 feet mould with star shape of 5 inches and top projection by 0.75 inches x 3 inches including cost andconveyance of materials to worksite etc., complete.,
Supply and fixing of Kilometre stone of standard design and drawing as per IRC:8-1980 (second revision), including painting and numbering etc., and all other incidental charges etc., complete.
Supply and fixing of HM stone of standard design and drawing as per IRC:26-1967, including painting and numbering etc., and all other incidental charges etc.,complete.
Proving and fixing Solar powered Traffic Blinkers of 30cm dia with Polycarbonate Dome 5mm Red of Led 150 Nos.iri each Red Blinkers Light - 1 No. with Red / White / Blue Led Blinkers Delineator Solar Panel : 12v 50w Solar Panel — 1 No. 12v 18 AH Battery -1 No. with Box, Solar Circuit Controller Board Box. Straight Pole : MSPole 3” dia 2.5mm thick 18 Feet height pole (1 No.) with 2 Feet under ground pole foundation, pole paintingincluding transportation charges, installation chargesetc., complete as per standard specification.
Supplying and installation of delineators (road way indicators, hazard markers and object markers),80-100 cm high above ground level, painted atalternatively black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 etc., complete (as per MoRT&H specification No. 806)
Providing and erecting W metal beam crash barrier: Providing and ercting W metal beam Single sided Double guard crash barrier comprising of 3mm thick corrugated sheet metal beam rail, 70cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5mm spaced 2m centre to centre, 1.05m high, 0.35m below ground/road level, all steel parts and filments to be galvanized by hot dip process, all fittings confirm to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5mm, 330mm long complete as per clause 810.
Providing and fixing of Digitally Printed Retro Reflectorized Overhead Cantilever Informatory sign Board of Size 5.00m x 1.80m made of cube corner Micro Prismatic grade sheeting conforming to Type XI standards of IRC 67 - 2022 and ASTMD4956 – 09, specification and fixed over 2mm thick aluminum sheet fixed on back supporting frame mild steel L angle of size 50mm x 50mm x 6mm. The Vertical support post for the installation of overhead sign Gantry shall be made of 300NB (Nominal Bore) MS Pipe with 12mm thick with a ground clearance of 6 meters along with 80NB (Nominal Bore) MS Pipe with 4mm thick and 40NB (Nominal Bore) MS Pipe with 3.20mm thick support posts. MS Base plate of size 1200mm x 1200mm x 25mm and MS Top plate of size 900mm x 1650mm x 16mm to be used to hold the sign board at the top and bottom respectively. MS Stiffener plates 8mm thick of sizes 420x420, 682x420, 288x288, 288x927 & 44x130 are to be used. Anchor bolts of dimension 25mm dia and 1000mm length are to be used as fixtures.The approved direction information should be digitally printed and should have 70% of the co-efficient of Retro-reflection values against the values as mentioned in Table 6.9 of IRC 67 – 2022. The Latex printer used for digital printing should use inks with low VOC emissions and have green guard, eco logo certificates as per UL2801 standards. The retro-reflective sheeting shall be covered under 10 years warranty issued for field performance and a certified copy of three years Outdoor exposure report shall be obtained as per IRC 67-2022 (As per MoRT&H specification No.801). Cantilever sign shall be installed at the site as per the approved structural and foundation drawing provided in the tender document and including cost and conveyance of all materials, equipment, machineries to worksite, including all labour charges for fixing the gantry in position with all leads and lifts, loading charges and necessary for satisfactory completion of the work
Providing and fixing of Digitally Printed Retro Reflectorized Overhead Gantry Informatory sign Boardmade of cube corner Micro Prismatic grade sheetingconforming to Type XI standards of IRC 67 - 2022 and ASTMD4956 – 09, specification and fixed over 2mm thick aluminum sheet fixed on back supporting frame mild steel L angle of size 50mm x 50mm x 6mm. The Vertical support post for the installation of overhead sign Gantry shall be made of 300NB (Nominal Bore) MS Pipe with 12mm thick with a ground clearance of 6 meters along with 80NB (Nominal Bore) MS Pipe with 4mm thick and 40NB (Nominal Bore) MS Pipe with 3.20mm thick support posts. MS Base plate of size 1200mm x 1200mm x 25mm and MS Top plate of size 900mm x 1650mm x16mm to be used to hold the sign board at the top and bottom respectively. MS Stiffener plates 8mm thick of sizes 420x420, 682x420, 288x288, 288x927 & 44x130 are to be used. Anchor bolts of dimension 25mm dia and 1000mm length are to be used as fixtures. The approved direction information should be digitally printed and should have 70% of the co-efficient of Retroreflection values against the values as mentioned in Table 6.9 of IRC 67 – 2022. The Latex printer used for digital printing should use inks with low VOC emissions and have green guard, eco logo certificates as per UL 2801 standards. The retro-reflective sheeting shall be covered under 10 years warranty issued for field performance and a certified copy of three years Outdoor exposure report shall be obtained as per IRC 67-2022 (As per MoRT&H specification No.801). Cantilever sign shall be installed at the site as per the approved structural and foundation drawing provided in the tender document and including cost and conveyance of all materials, equipment, machineries to worksite, including all labour charges for fixing the gantry in position with all leads and lifts, loading charges and necessary for satisfactory completion of the work as directed by the engineer-in-charge
Painting two coats with ready mix plastic enamel paint with approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts for Zebra marking for Crash Barrier and parapets
Calculation of SubTotal, GST and Total carried out by system automatically
Sub Total Amount for above all items
GST 18% for the above SubTotal Amount
ASHOK CONSTRUCTION (BID ID -1468344)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid