| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAdmitted-Finance 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 UDYAM UP 43 0021665 | KANPUR NAGAR | UTTAR PRADESH | 208016 | ₹20.1 L | L1 | Admitted-Finance |
| 2 | L2₹20.5 LAdmitted-Finance 1 367 SIVAN KOVIL STREET THONDAMATHURAI POST VEPPANTHATTAI TALUK PERAMBALUR DISTRICT | PERAMBALUR | TAMIL NADU | 621101 | ₹20.5 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Krishna and Co L1 | V.JANARTHANAN L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and Grubing Road Land Clearing and grubbing road land including uprooting wild vegetation, bushes, shrubs, saplings and trees of girth upto 300m, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD Technical Specification Clause 201. | 1,080 | Sqm | 6.3 ₹6,804 | 8 ₹8,640 |
| 2.00 | Picking the existing black top/ WBM surface to 50mm depth including labour, hire charges for plants and all other incidental charges etc. complete as per MOST specification. | 600 | Sqm | 23.3 ₹13,980 | 25 ₹15,000 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 432 | Cum | 140 ₹60,480 | 145 ₹62,640 |
| 4.00 | Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 36 | Cum | 510 ₹18,360 | 525 ₹18,900 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 273.75 | Cum | 3,090 ₹8.5 L | 3,100 ₹8.5 L |
| 6.00 | Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 7kg/10sqm using mechanical means as per MORD Technical Specification Clause 502 | 1,825 | Sqm | 86.8 ₹1.6 L | 90 ₹1.6 L |
| 7.00 | Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2.50kg/10sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 502 | 1,825 | Sqm | 20.3 ₹37,047.50 | 21 ₹38,325 |
| 8.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 45.63 | Cum | 12,191 ₹5.6 L | 12,500 ₹5.7 L |
| 9.00 | Supplying and fixing of Hectameter Stone | 3 | No | 570 ₹1,710 | 600 ₹1,800 |
| 10.00 | Supplying and fixing of Name board | 1 | No | 4,500 ₹4,500 | 4,650 ₹4,650 |
Tender Value
₹20.3 L
EMD Value
₹21,000
Closing Date
30 Jan 2026, 3:00 pmClosed
Block Development Officer (BP)
Panchayat Union, T.Palur
Black Topping the road from Nayaganaipriyal Adhidravidar Street in Nayaganaipriyal Panchayat in T.Palur Block of Ariyalur District under MLACDS 2025-26
2026_RDTN_646799_1
A3/0807/2025,Dated.20.01.2026
Open Tender
Civil Works - Roads
90 days
Panchayat Union, T.Palur
As per Tender Document
4 documents required · 4 mandatory
₹0
₹21,000
3 Feb 2026
24 Jan 2026
30 Jan 2026
24 Jan 2026
30 Jan 2026
24 Jan 2026
Clearing and Grubing Road Land Clearing and grubbing road land including uprooting wild vegetation, bushes, shrubs, saplings and trees of girth upto 300m, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD Technical Specification Clause 201.
Picking the existing black top/ WBM surface to 50mm depth including labour, hire charges for plants and all other incidental charges etc. complete as per MOST specification.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 7kg/10sqm using mechanical means as per MORD Technical Specification Clause 502
Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2.50kg/10sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 502
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supplying and fixing of Hectameter Stone
Supplying and fixing of Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_775305.xls
BOQ • 0.28 MB
TechnicalBid1.pdf
Tender Documents • 0.82 MB
PriceBid1.pdf
Tender Documents • 0.73 MB
Download all tender documents and submit your bid