Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.2 LAccepted-AOC | ₹44.2 L | L1 | Accepted-AOC Being L1. |
| 2 | L2₹44.6 L+₹39,418.25 (0.89%)Rejected-Finance | ₹44.6 L+₹39,418.25 (0.89%) | L2 | Rejected-Finance Being not L1. |
| 3 | L3₹45.2 L+₹1.0 L (2.28%)Rejected-Finance | ₹45.2 L+₹1.0 L (2.28%) | L3 | Rejected-Finance Being not L1. |
| 4 | L4₹47.6 L+₹3.3 L (7.56%)Rejected-Finance | ₹47.6 L+₹3.3 L (7.56%) | L4 | Rejected-Finance Being not L1. |
| 5 | L5₹50.8 L+₹6.6 L (14.8%)Rejected-Finance PLOT NO 881 PREM NAGAR NEW PLOTS JAMMU JAMMU JAMMU KASHMIR 180005 | JAMMU | JAMMU AND KASHMIR | 180005 | ₹50.8 L+₹6.6 L (14.8%) | L5 | Rejected-Finance Being not L1. |
| Sl No | Description | Qty | Unit | somyaenterprises L3 | nitin trading company L5 | Gurjit const co L6 | MAA BHAWANI CONSTRUCTION L1 | M/S DABAS CONSTRUCTIONS L2 | JOGRAJ CONSTRUCTION COMPANY L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of brick work built in cement mortar including quoins, arches and pillars etc. all as specified and directed by Engineer-in-Charge. | 237.6 | Cum | 100 ₹23,760 | 200 ₹47,520 | 200 ₹47,520 | 40 ₹9,504 Lowest | 200 ₹47,520 | 119 ₹28,274.4 |
| 2.00 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for all as specified and directed by Engineer-in-Charge . | 30 | Cum | 400 ₹12,000 | 250 ₹7,500 | 300 ₹9,000 | 40 ₹1,200 Lowest | 150 ₹4,500 | 100 ₹3,000 |
| 3.00 | Demolition of cement concrete is reinforced of any descrip-tion and in any position not otherwise specifically provided for all as specified and directed by Engineer-in-Charge . | 2 | Cum | 500 ₹1,000 | 250 ₹500 | 300 ₹600 | 50 ₹100 Lowest | 150 ₹300 | 100 ₹200 |
| 4.00 | Taking down cement plaster on brick wall including racking out joints, hacking for keys scrubbing down with water all as specified and directed by Engineer-in-Charge . | 3,400 | Sqm | 15 ₹51,000 | 20 ₹68,000 | 10 ₹34,000 | 8 ₹27,200 Lowest | 10 ₹34,000 | 15 ₹51,000 |
| 5.00 | M&L for brick work with sub class 'B' bricks, straight or curved on plan exceeding 6 mtr mean radius built in cement mortar 1:4 all as specified and directed by Engineer-in-Charge . | 150 | Cum | 4,000 ₹6,00,000 Lowest | 4,500 ₹6,75,000 | 4,500 ₹6,75,000 | 5,000 ₹7,50,000 | 4,550 ₹6,82,500 | 4,700 ₹7,05,000 |
| 6.00 | All as per serial item No. 5 here in before but except bricks including cleaning complete all as specified and directed by Engineer-in-Charge. | 60 | Cum | 4,000 ₹2,40,000 | 2,500 ₹1,50,000 | 2,000 ₹1,20,000 Lowest | 2,500 ₹1,50,000 | 2,230 ₹1,33,800 | 2,150 ₹1,29,000 |
| 7.00 | M&L for brick work with sub class ‘B’ bricks, straight or curved on plan to any radius in half brick thick walls built in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 200 | Sqm | 400 ₹80,000 Lowest | 650 ₹1,30,000 | 650 ₹1,30,000 | 450 ₹90,000 | 600 ₹1,20,000 | 700 ₹1,40,000 |
| 8.00 | All as per serial item No. 7 here in before but except bricks including cleaning complete all as specified and directed by Engineer-in-Charge. | 40 | Sqm | 400 ₹16,000 | 350 ₹14,000 | 450 ₹18,000 | 400 ₹16,000 | 400 ₹16,000 | 300 ₹12,000 Lowest |
| 9.00 | M&L for cement concrete 1:5:10 type E-2 using 40mm graded stone aggregate as in sub base all as specified and directed by Engineer-in-Charge . | 82 | Cum | 3,800 ₹3,11,581 | 2,500 ₹2,04,987.5 | 2,000 ₹1,63,990 | 3,500 ₹2,86,982.5 | 3,050 ₹2,50,084.75 | 1,800 ₹1,47,591 Lowest |
| 10.00 | M&L for plain cement concrete (1:3:6) type C-2 using 40mm graded stone aggregate as in foundation filling and mass concrete complete all as specified. | 25 | Cum | 4,500 ₹1,12,500 | 3,500 ₹87,500 | 3,500 ₹87,500 | 3,600 ₹90,000 | 3,550 ₹88,750 | 2,800 ₹70,000 Lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
16 Jun 2026, 6:00 pmClosed
Hans Ram Meena, IDSE
GE Kapurthala
Certain misc repairs to drain, fencing, gates, pathway, boundary wall etc at Old Mil Stn Kapurthala under GE Kapurthala.
2026_MES_760134_2
8138/E8
Open Tender
Civil Works
Item Rate
180 days
GE Kapurthala
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE Kapurthala
₹98,000
1 Sept 2026
2 Jun 2026
18 Jun 2026
2 Jun 2026
16 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of brick work built in cement mortar including quoins, arches and pillars etc. all as specified and directed by Engineer-in-Charge. | 237.6 | Cum | - | - |
| 2 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for all as specified and directed by Engineer-in-Charge . | 30 | Cum | - | - |
| 3 | Demolition of cement concrete is reinforced of any descrip-tion and in any position not otherwise specifically provided for all as specified and directed by Engineer-in-Charge . | 2 | Cum | - | - |
| 4 | Taking down cement plaster on brick wall including racking out joints, hacking for keys scrubbing down with water all as specified and directed by Engineer-in-Charge . | 3,400 | Sqm | - | - |
| 5 | M&L for brick work with sub class 'B' bricks, straight or curved on plan exceeding 6 mtr mean radius built in cement mortar 1:4 all as specified and directed by Engineer-in-Charge . | 150 | Cum | - | - |
| 6 | All as per serial item No. 5 here in before but except bricks including cleaning complete all as specified and directed by Engineer-in-Charge. | 60 | Cum | - | - |
| 7 | M&L for brick work with sub class ‘B’ bricks, straight or curved on plan to any radius in half brick thick walls built in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 200 | Sqm | - | - |
| 8 | All as per serial item No. 7 here in before but except bricks including cleaning complete all as specified and directed by Engineer-in-Charge. | 40 | Sqm | - | - |
| 9 | M&L for cement concrete 1:5:10 type E-2 using 40mm graded stone aggregate as in sub base all as specified and directed by Engineer-in-Charge . | 82 | Cum | - | - |
| 10 | M&L for plain cement concrete (1:3:6) type C-2 using 40mm graded stone aggregate as in foundation filling and mass concrete complete all as specified. | 25 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
TENDER_8138.pdf
Tender Documents • 1.58 MB
BOQ_861373.xls
BOQ • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .