Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-AOC BALBEHRA VILLAGE BALBEHRA TEHSIL GUHLA KAITHAL 132027 | 132027 | ₹1.3 Cr Quoted ₹1.4 Cr | 1 | Accepted-AOC LOWEST |
| 2 | 2₹1.5 Cr+₹8.2 L (5.97%)Rejected-Finance H NO 46 BANK COLONY BHUNA ROAD TOHANA TEHSIL DISTT FATEHBAD HARAYANA | HISAR | HARYANA | 125047 | ₹1.5 Cr+₹8.2 L (5.97%) | 2 | Rejected-Finance not lowest |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
5 Oct 2021, 5:00 pmClosed
VARUN KANSAL
AMBALA ROAD KAITHAL
Up-gradation of roads by Providing Widening and Strengthening of Guhla Kharkan road to Dera Makhan Singh at RD 0.153 to 2.70 in Kaithal District (ID 6983)
2021_HRY_188807_1
PWD/KAITHAL/P-II/GUHLA KHARKAHAN ROAD TO DERA MAKH
Open Tender
Civil Works
Item Wise
180 days
KAITHAL DISTRICT
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
Yes
₹2.5 L
Yes
KAITHAL CIRCLE
29 Nov 2021
20 Sept 2021
6 Oct 2021
20 Sept 2021
5 Oct 2021
20 Sept 2021
28 Sept 2021
Amount
Milling on Bituminous Surface: Dismantling of existing damaged Bitumen surface by cold Milling Machine up to any depth and hauling the milled material up to any lead and stacking at nearest recycling Plant site (HSR 17.43.2)
Excavation for roadwork in soil by manual/ mechanical means including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including breaking of clods and disposal within ROW as per technical clause 301 of MORT&H specifications (HSR 17.74)
Compaction & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications (HSR 17.5.3)
Brick on end in soil/edging in required pattern with bricks of class designation (HSR 10.36)
Providing & laying 150mm Granular Sub-Base with Coarse Graded Material - Grading-I (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material (Based on HSR 17.15.1) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations manufacturing shall be approved by engineer.
Providing, laying WBM (G-I) (63mm to 45mm with screening Type "A" 75mm each layer), spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Baed on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations manufacturing shall be approved by engineer.
Providing and laying WBM (G-II) (53mm to 22.4mm with screening Type "B" 75mm each layer), spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations manufacturing shall be approved by engineer.
Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG - 10 using aggregate 13mm nominal size 1.00 cum and bitumen 0.10 MT per 100 Sqm & laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications: 19 mm nominal chipping size, with bitumen (Based on HSR 17.32.3)
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (Based on HSR 17.26.2)
Providing and laying 30mm mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications (HSR 17.31.4) Note: If bitumen required is this account more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. (HSR 34.26) Note: - Before start of work the contractor shall give brand, batch no., manufacturing date of the material to be used and get approved thbe same from Engineer-in-Charge before use.
Reinforced cement concrete M25 grade kilometre stone for village road of standard design as per IRC:8-1980, fixing in position including painting and printing etc complete as per technical clause 804 of MORTH Specifications (HSR 34.27.3)
Reinforced cement concrete M-25 grade village board size 1.85x0.90x0.075m of standard design, fixing in position including painting and printing etc. complete as per PWD specifications, minimum reinforcement 16 kg, Embedded in Ground up to 55 cm, in M-15 Concrete foundation 600x700x145 mm, as per Haryana PWD specification. Village Board (HSR 34.27.5)
Construction of Embankment (on berms) with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per technical clause 305 of MORT&H specifications (HSR 17.7) (Use Execavated earth)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m - All kinds of soil (HSR 4.14.1)
Demolishing dry brick on end edging pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within any lead (HSR 17.75)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - CC 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded cum stone aggregate 40 mm nominal size) (HSR 6.1.6)
Cement Concrete 1:8:16 with stone aggregate 40mm size in foundation and plinth. (HSR 10.100.2)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - CC 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded cum stone aggregate 20 mm nominal size) (HSR 6.1.2)
Providing and laying of brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks 1 :4 ( 1 cement : 4 coarse sand) (HSR 10.33.1)
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement: 4 coarse sand) (HSR 7.21.1)
Centering and shuttering including strutting, propping etc. and removal of form for - Suspended floors, roofs, landings, balconies and access platform (HSR 6.30.3)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - CC 1 : 1 ½: 3 ( 1 Cement: 1 ½ coarse sand (zone-Ill) : 3 cum graded stone aggregate 20 mm nominal size) (HSR 6.1.1)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - CC 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) (HSR 6.14.1)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. Note: - Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. cold twisted bars (HSR 6.33.3)
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) (HSR 11.5.3)
Pointing on brick work or brick flooring with cement mortar 1 :3 (1 cement : 3 fine sand) Raised and cut pointing (HSR 11.25.2)
Recovery items:- The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :-i). Old Bituminious material @ Rs.1365/- P.Cum
ii). Old bricks @ Rs.5/- Nos.
iii). Brick bats @ Rs.500/- P.Cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. In case of any difference in the Unit and nomenclature of any item depicted in the DNIT and that given in HSR the unit and nomenclautre given in HSR and approved by the competent authority on the basis of HSR shall be applicable.
Desh Deepak Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .