Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.3 LAccepted-AOC 66 C O J R NAICKER ASWATHNAGAR SANJAYNAGAR P O BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹50.3 L+₹67,649.25 (1.36%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹50.6 L+₹92,711.23 (1.87%)Rejected-AOC NO 26 SRI GANESH 7TH CROSS BDS NAGAR DIBBUR RAMAIAH LAYOUT K NARAYANPURA MAIN ROAD BANGALORE 560 077 | BENGALURU URBAN | KARNATAKA | 560077 | L3 | Rejected-AOC Rejected | |
| 4 | L4₹50.8 L+₹1.2 L (2.37%)Rejected-AOC 227 2 5TH B MAIN ROAD 2ND BLOCK HRBR LAYOUT KALYAN NAGAR BANASAWADI BANGALORE 560 043 | BENGALURU URBAN | KARNATAKA | 560043 | L4 | Rejected-AOC Rejected | |
| 5 | L5₹51.0 L+₹1.4 L (2.82%)Rejected-AOC NO 228 3RD CROSS HRBR 3RD BLOCK NEAR JALVAYU VIHAR WEST GATE BANGALORE 560043 | BENGALURU URBAN | KARNATAKA | 560043 | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | chowdeshwariconstructionco L8 | GKR and CO L6 | OM ENTERPRISES L1 | Power and Telecom Systems L9 | M/s BHOOMI ELECTRICALS L4 | S SELVALAKSHMI ENGINEER AND CONTRACTOR L5 | SRUSHTI CONSTRUCTIONS L2 | SRI GANESH ENTERPRISES L3 | raashi constructions L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00COMMON ITEMS APPLICABLE FOR 'JOB A' , 'JOB B' & JOB 'C' (B/R & E/M) | ||||||||||||
| 1.10 | Demolition of cement concrete(unreinforced) in ground floors and pavings not exc 15cm thickness (below or above ground level) complete all as specified and directed. | 11.1 | Cum | 490 ₹5,439 | 475 ₹5,272.5 | 650 ₹7,215 | 496 ₹5,505.6 | 560 ₹6,216 | 1,025 ₹11,377.5 | 400 ₹4,440 Lowest | 510 ₹5,661 | 475 ₹5,272.5 |
| 2.00 | Excavating in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exc 10 sq m on plan and not exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed. | 97.9 | Cum | 475 ₹46,502.5 | 410 ₹40,139 | 550 ₹53,845 | 502 ₹49,145.8 | 510 ₹49,929 | 1,021 ₹99,955.9 | 405 ₹39,649.5 | 375 ₹36,712.5 Lowest | 514 ₹50,320.6 |
| 3.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick with soils in soft/loose soil complete all as specified and directed. | 66.9 | Cum | 132 ₹8,830.8 | 210 ₹14,049 | 150 ₹10,035 | 220 ₹14,718 | 190 ₹12,711 | 1,252 ₹83,758.8 | 178 ₹11,908.2 | 115 ₹7,693.5 Lowest | 187 ₹12,510.3 |
| 4.00 | Use and waste of form work to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter for rough finished flat surfaces of concrete complete all as specified and directed. | 40.24 | Sqm | 590 ₹23,741.6 | 490 ₹19,717.6 | 650 ₹26,156 | 727 ₹29,254.48 | 569 ₹22,896.56 | 574 ₹23,097.76 | 587 ₹23,620.88 | 450 ₹18,108 Lowest | 625 ₹25,150 |
| 5.00 | Use and waste of form work to sides of pillers, posts, struts,piers, columns and stanchions for rough finished flat surfaces of concrete, square, rectangular or polygonal, complete all as specified and directed. | 59.64 | Sqm | 596 ₹35,545.44 | 495 ₹29,521.8 Lowest | 650 ₹38,766 | 761 ₹45,386.04 | 574 ₹34,233.36 | 597 ₹35,605.08 | 614 ₹36,618.96 | 548 ₹32,682.72 | 714 ₹42,582.96 |
| 6.00 | Use and waste of form work to side and soffits of floor or roof beams, beam haunchings,girders, bressummers, lintels beam,tie beam, cantilevers, shelves including supports, overhangs, etc. also splays between floors and rough finished, complete all as specified and directed. | 52.44 | Sqm | 589 ₹30,887.16 | 750 ₹39,330 | 650 ₹34,086 | 886 ₹46,461.84 | 594 ₹31,149.36 | 574 ₹30,100.56 Lowest | 715 ₹37,494.6 | 641 ₹33,614.04 | 714 ₹37,442.16 |
| 7.00 | S&F TMT Bars 10mm dia and over, cut to length, bent to shape required, inculding cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. | 713.1 | Kg | 169 ₹1,20,513.9 | 110 ₹78,441 | 120 ₹85,572 | 212 ₹1,51,177.2 | 91 ₹64,892.1 Lowest | 165 ₹1,17,661.5 | 171 ₹1,21,940.1 | 135 ₹96,268.5 | 164 ₹1,16,948.4 |
| 8.00 | M&L for PCC type C2 ,1:3:6 using 40 mm graded stone aggregate as in foundation filling and mass concrete all as specified and directed. | 6.04 | Cum | 4,784 ₹28,908.12 Lowest | 4,978 ₹30,080.39 | 5,500 ₹33,234.67 | 7,333 ₹44,310.87 | 5,987 ₹36,177.45 | 6,125 ₹37,011.33 | 5,914 ₹35,736.33 | 5,142 ₹31,071.39 | 6,178 ₹37,331.59 |
| 9.00 | M&L RCC (nominal mix) type A1 1:1.5:3 (using 20mm graded stone aggregate) in foundations, including rafts, footings, foundation beams; plinth beams; bases for coloumns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and directed. | 11.82 | Cum | 8,798 ₹1,04,001.16 | 7,487 ₹88,503.83 Lowest | 8,500 ₹1,00,478.5 | 12,046 ₹1,42,395.77 | 10,500 ₹1,24,120.5 | 12,000 ₹1,41,852 | 9,715 ₹1,14,841.01 | 7,698 ₹90,998.06 | 9,324 ₹1,10,219 |
Tender Value
Refer Docs
EMD Value
₹91,907
Closing Date
18 Jun 2026, 6:00 pmClosed
GE (AF) BANGALORE
Garrison Engineer (AF), Military Engineer Services, HQ TrgComd, IAF Campus, Hebbal, Bangalore 560 006
ADDN ALTN TO LIVING-IN BILLETS FOR WOMEN AGNIVEER VAYU, ADDN ALTN TO T-149 AND PROVN OF LADIES TOILET AT LOGISTIC SECTION AT HQTC
2026_MES_765610_2
8499/E8
Open Tender
Civil Works
Item Rate
120 days
GE (AF) BANGALORE
AS PER NIT
5 documents required · 5 mandatory
₹500
GE (AF) BANGALORE
₹91,907
Yes
31 Jul 2026
4 Jun 2026
20 Jun 2026
4 Jun 2026
18 Jun 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1COMMON ITEMS APPLICABLE FOR 'JOB A' , 'JOB B' & JOB 'C' (B/R & E/M) | |||||
| 1.1 | Demolition of cement concrete(unreinforced) in ground floors and pavings not exc 15cm thickness (below or above ground level) complete all as specified and directed. | 11.1 | Cum | - | - |
| 2 | Excavating in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exc 10 sq m on plan and not exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed. | 97.9 | Cum | - | - |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick with soils in soft/loose soil complete all as specified and directed. | 66.9 | Cum | - | - |
| 4 | Use and waste of form work to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter for rough finished flat surfaces of concrete complete all as specified and directed. | 40.24 | Sqm | - | - |
| 5 | Use and waste of form work to sides of pillers, posts, struts,piers, columns and stanchions for rough finished flat surfaces of concrete, square, rectangular or polygonal, complete all as specified and directed. | 59.64 | Sqm | - | - |
| 6 | Use and waste of form work to side and soffits of floor or roof beams, beam haunchings,girders, bressummers, lintels beam,tie beam, cantilevers, shelves including supports, overhangs, etc. also splays between floors and rough finished, complete all as specified and directed. | 52.44 | Sqm | - | - |
| 7 | S&F TMT Bars 10mm dia and over, cut to length, bent to shape required, inculding cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. | 713.1 | Kg | - | - |
| 8 | M&L for PCC type C2 ,1:3:6 using 40 mm graded stone aggregate as in foundation filling and mass concrete all as specified and directed. | 6.04 | Cum | - | - |
| 9 | M&L RCC (nominal mix) type A1 1:1.5:3 (using 20mm graded stone aggregate) in foundations, including rafts, footings, foundation beams; plinth beams; bases for coloumns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and directed. | 11.82 | Cum | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
SOC_8499.pdf
Additional Documents • 0.01 MB
Tender_8499.pdf
Tender Documents • 0.59 MB
BOQ_862130.xls
BOQ • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .