Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹3.4 L+₹20,187.70 (6.34%)Accepted-Finance 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | L2 | Accepted-Finance L2 Bidder |
Tender Value
Refer Docs
EMD Value
₹4,460
Closing Date
30 Jul 2021, 2:00 pmClosed
SEESMTPS2
SEESMTPS2 Mettur Dam
Fabrication of platform
2021_EB_205706_1
OT38
Open Tender
Miscellaneous Works
Works
30 days
MTPS2
Refer Tender Documents
4 documents required · 4 mandatory
₹0
₹4,460
Yes
2 Aug 2021
16 Jul 2021
31 Jul 2021
16 Jul 2021
30 Jul 2021
16 Jul 2021
Amount
Charges for fabrication and erection of platform above the cooling water pump A,B&C discharge pipelines in Cooling Water Pump House seepage water collecting pit, along the side of 2400NB Butterfly Valve-A of Cooling water return line near NDCT including safety handrails, 4 Nos. of ladders,required T&P's and consumables. (Required quantity of M.S Angles, pipes, chequered plates,bolt & nuts will be supplied by TANGEDCO)
Charges for cleaning and painting with one coat of red oxide primer, two coats of Anti corrosive black paint on the entire erected structures and yellow/black paint on hand rails including required consumables. (Required quantity of Asian/Berger make paint and thinner are of contractors scope)
Charges for dismantling the 150 NB damaged M.S.ERW pipeline ,spool piece along with flanges(4 Nos.), cutting the damaged pipeline, fabricating the required new M.S.ERW pipe by cutting, aligning , welding with flanges and reassembling the same in the discharge line of booster pump to Injector-II in Chlorination plant including required No. of flanges,T&P's and consumables. (Required M.S.ERW pipe and bolt & nuts will be supplied by TANGEDCO at free of cost).
Charges for cutting the 200 NB damaged M.S.ERW pipeline, fabricating the required new M.S.ERW pipe by cutting, aligning , welding with flanges(4 Nos.) and reassembling the same in the common suction header of booster pump in Chlorination plant including required No. of flanges,T&P's and consumables. (Required M.S.ERW pipeline,2 Nos. of flanges and bolt & nuts will be supplied by TANGEDCO at free of cost).
Charges for transporting the required materials from Central stores/MTPS-II to Cooling Water Pump House and devolution of retrieved scrap material to Central stores.
SS ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .