Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹3.8 LAccepted-AOC | ₹3.8 L | l1 | Accepted-AOC Accepted |
| 2 | L2₹4.6 L+₹81,867.33 (21.6%)Rejected-AOC SUBRAMANIAN NAGAR 1ST STREET SUBRAMANIAN NA | TIRUVANNAMALAI | TAMIL NADU | 604407 | ₹4.6 L+₹81,867.33 (21.6%) | L2 | Rejected-AOC Rejected |
| 3 | l2₹4.6 L+₹81,867.33 (21.6%)Rejected-AOC | ₹4.6 L+₹81,867.33 (21.6%) | l2 | Rejected-AOC Rejected |
| 4 | l3₹5.1 L+₹1.4 L (35.9%)Rejected-AOC TAMIL NADU TAMIL NADU | TIRUNELVELI | TAMIL NADU | 627001 | ₹5.1 L+₹1.4 L (35.9%) | l3 | Rejected-AOC Rejected |
Tender Value
₹5.4 L
EMD Value
₹5,500
Closing Date
14 Aug 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
PROVIDING CONCRETE BIN PLATFORM AT VARIOUS GARBAGE BIN COLLECTION POINT LOCATION IN DN-108, UNIT-23, ZONE-08
2026_CoC_690646_1
Z.O.VIII.C.NO.E1/5541/2026
Open Tender
Civil Works
Works
90 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,500
4 Sept 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Excavation And Deposting on Bank With In...mall Size Boulders And Hard Gravelly Soil (SS 20A)Help | 25 | CUM | 156.4 | ₹3,910 |
| 2 | Providing and laying, spreading and compacting gra...es etc., complete as per clause 406 of MORTH Rev-5Help | 25 | CUM | 2,709.1 | ₹67,727.5 |
| 3 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level Help | 600 | KGS | 96.53 | ₹57,918 |
| 4 | Supplying and erecting centering for plane surface...ng shall be given after the concrete is laid).BEAMHelp | 85 | SQM | 1,178.29 | ₹1,00,154.65 |
| 5 | Providing And Laying. In Position, Standardised Co...The Department For The Excess Usage of Materials).Help | 25 | CUM | 9,749.68 | ₹2,43,742 |
| 6 | Painting the wall two coats with approved weather ...tion and as directed by the departmental officers.Help | 150 | SQM | 260.88 | ₹39,132 |
| 7 | Art Painting | 54 | SQM | 541.2 | ₹29,224.8 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_830371.xls
BOQ • 0.28 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .