| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹3.2 L+₹29,948.15 (10.5%)Rejected-AOC GRAM AND POST UMRI DISTRICT BIJNOR UTTAR PRADESH | UMRI | BIJNOR | UTTAR PRADESH | L2 | Rejected-AOC rejected | |
| 3 | L3₹3.5 L+₹66,953 (23.4%)Rejected-AOC | L3 | Rejected-AOC rejected | |
| 4 | Rejected-Technical | - | Rejected-Technical All Technical document Not Complete |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
14 Oct 2023, 9:00 amClosed
E.E.A.I.D. DHAMPUR
OFFICE OF THE E.E.A.I.D. DHAMPUR
LOT 12 OF TENDER NOTICE NO.01-EE-2023-24
2023_UPIDC_847417_30
01/EEAID/2023-24
Open Tender
Civil Works
Item Rate
60 days
DHAMPUR
AS PER NIT
2 documents required · 2 mandatory
₹177
₹8,000
16 May 2024
9 Oct 2023
14 Oct 2023
9 Oct 2023
14 Oct 2023
9 Oct 2023
Amount
Laying and Jointing PVC Pipe. Heading
Earth work in exavation in foundation in dry soil i/c lift upto 1.50M and lead upto 30m i/c all cost of material, labour T&P etc. complete
S/Laying P.C.C. 1:3:6 in foundation for making base i/c all cost of material, labour T&P etc. complete.
S/Laying P.C.C. 1:2:4 in foundation for making base i/c all cost of material, labour T&P etc. complete.
S/Laying of R.C.C. Hume Pipe NP-3 900 mm i/c all cost of material, Labour, T&P and transportation etc. arrange and all tax etc. complete of work.
Brick massonery (M-105) with cement mortar of ratio 1:4 i/c all cost of all materials, labour, T&P etc complete.
Struck Deep pointing 1:2 in Cement Mortar i/c all cost of material, labour, T&P etc. complete.
Ordinary centering & shuttering for R.C.C. work including cost of all materials, labour and T&P etc. complete .
S/Laying reinf. cement concrete (M-20) in 1:1.5:3 i/c all cost of material, Labour, T&P etc. complete.
S/Laying reinforcement steel at site per M.T. including bending, binding, cutting and placing in position of reinforcement i/c all cost of material, labour and T&P etc. complete.
Earth work in back filling and stg. of damaged banks of canals i/c all lift & lead upto 1.0 Km distance all labour, T&P etc complete of work.
Fabrication and fixing of steel major worl including cost of material, cutting, welding, labour T&P required for completion of the work.
PRAVENDRA KUMAR
M/S DILSHAD ALI
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .