Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | L1 | Accepted-AOC Work order issued | |
| 2 | L2₹15.9 L+₹10,379.89 (0.66%)Rejected-Finance NOT SPECIFIED | L2 | Rejected-Finance L2 | |
| 3 | L3₹18.5 L+₹2.7 L (17.2%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹42,000
Closing Date
19 Feb 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Construction work of concrete ghat for idol immersion near Mahesra Tal
2026_DOLBU_1112762_1
FFC Mahesara Tal
Open Tender
Civil Works
Percentage
90 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
Nagar Nigam Gorakhpur
₹42,000
24 Jun 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
19 Feb 2026
5 Feb 2026
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone ggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-20 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) : 400mm dia piles
Cartage of earth filling
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
12 mm cement plaster of mix1:6 (1 cement: 6 coarse sand)
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two or more coats) over and including water thinnable priming coat with cement primer
Providing and fixing to the SS GRIL its complete design and transportation
Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504.
cosultancy fee @1.45
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
FFC.pdf
Tender Documents • 2.65 MB
BOQ_2058606.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .