| 1 | L1₹37.9 LAccepted-AOC VILL KURUABAHI SATRA P O KURUABAHI SATRA P S BOKAKHAT DIST GOLAGHAT ASSAM PIN CODE 785615 | BOKAKHAT | GOLAGHAT | ASSAM | 785615 | ₹37.9 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹38.0 LRejected-Finance KURUA BAHI SATRA BOKAKHAT GOLAGHAT ASSAM | BOKAKHAT | GOLAGHAT | ASSAM | ₹38.0 L | L2 | Rejected-Finance Refer to Financial minutes. |
| 3 | Rejected-Technical VILL NUMALIGARH TOWN P S BOKAKHAT P O NUMALIGARH DIST GOLAGHAT ASSAM PIN 785615 | NUMALIGARH | GOLAGHAT | ASSAM | 785615 | - | - | Rejected-Technical Not Admitted. Refer to Technical minutes. |
| Sl No | Description | Qty | Unit | RAJIB DUTTA L1 | PRAJIB DUTTA L2 |
|---|---|---|---|---|---|
| 1.00Part-A (1) - Agri bund | |||||
| 1.01 | Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area. By manual means | 0.38 | Hect. | 55,808.98 ₹21,207.41 | 55,808.98 ₹21,207.41 |
| 1.02 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m. | 3,182.12 | m3 | 271.92 ₹8.7 L | 271.92 ₹8.7 L |
| 1.03 | Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. | 2,375.78 | m2 | 24.63 ₹58,515.46 | 24.63 ₹58,515.46 |
| 2.00Part-A (2) - Agri bund | |||||
| 2.01 | Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area. By manual means | 0.12 | Hect. | 55,808.98 ₹6,697.08 | 55,808.98 ₹6,697.08 |
| 2.02 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m. | 1,910.86 | m3 | 270 ₹5.2 L | 271.92 ₹5.2 L |
| 2.03 | Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. | 1,015.2 | m2 | 24.63 ₹25,004.38 | 24.63 ₹25,004.38 |
| 3.00Part-B - Box Culvert | |||||
| 3.01 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 124.8 | m3 | 134.47 ₹16,781.86 | 134.47 ₹16,781.86 |
Tender Value
₹38.0 L
EMD Value
₹76,060
Closing Date
19 Jan 2026, 1:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Soil and Moisture Conservation Activity in Chanukana Bil Gaon (Earthen Agri Field Bund with RCC Box Culvert) under RIDFXXXI
2025_SCD_49657_4
Tender/NIT/Pt-I/2025-26/5725
Open Tender
Civil Works
120 days
Golaghat S. C. Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹760
₹76,060
Yes
O/o The DSC, Assam
11 Mar 2026
26 Dec 2025
19 Jan 2026
3 Jan 2026
19 Jan 2026
8 Jan 2026
7 Jan 2026
Part-A (1) - Agri bund
Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area. By manual means
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
Part-A (2) - Agri bund
Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area. By manual means
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
Part-B - Box Culvert
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Sand filling in Foundation Trenches as per Drawing and Technical Specification
Laying brick soling layeron prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412.
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.
Providing concrete for reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in foundation complete as per drawings and technical specifications Clauses 1000 and 1202.
Plastering with cement mortar (1:4), 15 mm thick on brickwork insubstructure as per technical specification Clauses 613.4 & 1204
Steel Pipe 50mm external dia for Railing
Part-C - Hp Culvert
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803,1202 & 1203 A. With crushed Stone ( I) P.C.C grade M10 Nominal Mix 1:3:6
Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1: 2 ut excluding excavation , protection works, backfilling, concrete and masonry works in head walls and parapets clause 1106. ( 1000 mm dia )
Brick masonry work in 1:4 in sub structure complete excluding pointing and plastering, as per technical specifications.
Plastering with cement mortar (1:3) on brickwork in substructure as per technical specification.
Painting two coats on a new concrete surface
Providing RCC Sign Board
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BIDGolaghatChanukana.pdf
Tender Documents • 1.03 MB
BOQ_78865.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid