Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.0 LAdmitted-Finance | ₹45.0 L | L1 | Admitted-Finance |
| 2 | L2₹47.6 L+₹2.5 L (5.65%)Admitted-Finance | ₹47.6 L+₹2.5 L (5.65%) | L2 | Admitted-Finance |
| 3 | L3₹49.6 L+₹4.6 L (10.2%)Admitted-Finance | ₹49.6 L+₹4.6 L (10.2%) | L3 | Admitted-Finance |
| 4 | L4₹50.9 L+₹5.9 L (13.0%)Admitted-Finance | ₹50.9 L+₹5.9 L (13.0%) | L4 | Admitted-Finance |
| 5 | L5₹50.9 L+₹5.9 L (13.1%)Admitted-Finance | ₹50.9 L+₹5.9 L (13.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | m/s builders and suppliers L4 | ABDUL AUDUD L2 | MS AFTAB LASKAR L5 | SAMEER THAPA L1 | MAGADH TRADING L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00B & R Division Items | ||||||||
| 2.00 | Demolition of un-reinforced cement concrete in ground floor and paving not exceeding 15 cm thick (below or above ground level) complete all as specified and directed. | 12 | Cum | 400 ₹4,800 Lowest | 500 ₹6,000 | 400 ₹4,800 Lowest | 400 ₹4,800 Lowest | 400 ₹4,800 Lowest |
| 3.00 | Demolition of Concrete of any description and in any position not otherwise specifically provided complete all as specified and directed. | 124.5 | Cum | 530 ₹65,985 | 490 ₹61,005 | 450 ₹56,025 | 350 ₹43,575 Lowest | 530 ₹65,985 |
| 4.00 | Demolition of reinforced cement concrete of any description and in any position complete all as specified and directed. | 2.41 | Cum | 1,700 ₹4,097 | 1,100 ₹2,651 Lowest | 1,700 ₹4,097 | 1,250 ₹3,012.5 | 1,600 ₹3,856 |
| 5.00 | Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, pillars etc. complete all as specified and as directed. | 5 | Cum | 350 ₹1,750 Lowest | 360 ₹1,800 | 350 ₹1,750 Lowest | 1,550 ₹7,750 | 350 ₹1,750 Lowest |
| 6.00 | Dismantling floor, hearth or wall tilling including cement mortar bedding (but not backing) removing serviceable tiles to stores and rubbish off the premises. | 15 | Sqm | 1,650 ₹24,750 | 1,150 ₹17,250 | 45 ₹675 Lowest | 110 ₹1,650 | 150 ₹2,250 |
| 7.00 | Dismantling plain or corrugated steel sheeting, any gauge or any thickness as in roof covering, wall cladding, etc.including all necessary staging / scaffolding, etc. as required complete all as specified and as directed. | 45.6 | Sqm | 100 ₹4,560 | 1,050 ₹47,880 | 45 ₹2,052 Lowest | 65 ₹2,964 | 100 ₹4,560 |
| 8.00 | Dismantling wall and ceiling boards (fibre, pulb, insulation etc) or insulation boards slabs/blankets any thickness including cover fillets all as specified and as directed. | 35 | Sqm | 190 ₹6,650 | 210 ₹7,350 | 55 ₹1,925 Lowest | 55 ₹1,925 Lowest | 190 ₹6,650 |
| 9.00 | Dismantling of timber scantling 40 Sqcm and over in section, in any position in framed work complete all as specified and directed. | 0.55 | Cum | 600 ₹330 | 599 ₹329.45 | 550 ₹302.5 Lowest | 1,112 ₹611.6 | 600 ₹330 |
| 10.00 | Taking down chowkhats or frame with shutters (without taking off shutters from frame) each not exceeding 1.50 Sqm each complete all as specified. | 1 | Each | 180 ₹180 Lowest | 180 ₹180 Lowest | 180 ₹180 Lowest | 380 ₹380 | 180 ₹180 Lowest |
Tender Value
₹43.2 L
EMD Value
₹86,400
Closing Date
22 Aug 2026, 6:00 pmClosed
GE SILCHAR
Office of the GE Silchar Masimpur Cantt
SPL REPAIR TO AREA DRAINAGE AND CERTAIN REVENUE WORK AT AIZAWL MIL STN
2026_MES_780743_1
8174A/E8
Open Tender
Civil Works
Item Rate
180 days
Aizawl
Class D Category a i and other criteria as per NIT and Tender Doc
8 documents required · 8 mandatory
₹500
GE Silchar
₹86,400
Yes
14 Sept 2026
25 Jul 2026
25 Aug 2026
25 Jul 2026
22 Aug 2026
8 Aug 2026
25 Jul 2026 - 1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | B & R Division Items | - | - | - | - |
| 2 | Demolition of un-reinforced cement concrete in ground floor and paving not exceeding 15 cm thick (below or above ground level) complete all as specified and directed. | 12 | Cum | - | - |
| 3 | Demolition of Concrete of any description and in any position not otherwise specifically provided complete all as specified and directed. | 124.5 | Cum | - | - |
| 4 | Demolition of reinforced cement concrete of any description and in any position complete all as specified and directed. | 2.41 | Cum | - | - |
| 5 | Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, pillars etc. complete all as specified and as directed. | 5 | Cum | - | - |
| 6 | Dismantling floor, hearth or wall tilling including cement mortar bedding (but not backing) removing serviceable tiles to stores and rubbish off the premises. | 15 | Sqm | - | - |
| 7 | Dismantling plain or corrugated steel sheeting, any gauge or any thickness as in roof covering, wall cladding, etc.including all necessary staging / scaffolding, etc. as required complete all as specified and as directed. | 45.6 | Sqm | - | - |
| 8 | Dismantling wall and ceiling boards (fibre, pulb, insulation etc) or insulation boards slabs/blankets any thickness including cover fillets all as specified and as directed. | 35 | Sqm | - | - |
| 9 | Dismantling of timber scantling 40 Sqcm and over in section, in any position in framed work complete all as specified and directed. | 0.55 | Cum | - | - |
| 10 | Taking down chowkhats or frame with shutters (without taking off shutters from frame) each not exceeding 1.50 Sqm each complete all as specified. | 1 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.14 MB
8174A-TP.pdf
Tender Documents • 0.51 MB
BOQ_874588.xls
BOQ • 0.43 MB
8174A-SchofCreditformat.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .