Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Expirience issue |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
6 Sept 2024, 1:00 pmClosed
SE EDC
Fatehpur
Work for Perventive Maintenece of 160/250/400 KVA Transformers installed under EDD-3 Fatehpur
2024_PVVNV_950021_1
31/EDCF/WORK/2024-25
Open Tender
Electrical Works
Item Wise
180 days
Fatehpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Yes
SE EDC
₹6,000
Yes
18 Sept 2024
28 Aug 2024
6 Sept 2024
28 Aug 2024
6 Sept 2024
28 Aug 2024
Amount
Spot Maintennance of 160 KVA (12 Nos) Medium Capacity Transformer
Opening of top cover of Transformers removing the old gaskets, Packing, Oil Seals after draining of Transformer oil upto required level and fixing the new gaskets packing, oil seals to stop the leakage of oil, re- fixing the top cover and conservator etc.
Replacement of old damage LT Bushing Rod .Material Provid by contractor
Replacement of old damage HT Bushing Rod.Material Provid by contractor
Replacement of old damage Lugs.Material Provid by contractor
Replacement of old damage Z clamp.Material Provid by contractor
Replacement of old damage leads unarmoured Aluminium XLPE Cable (1X240 sq mm.) Material to Provid by contractor
Opening the breather and removal of silica gel and providing new silica gel and re-fixing the air breather after refilling of silica gel breather.Also providing new breather with silica gel if not availbale.Material to Provid by contractor
Replacement of old damage HT Bushing.Material Provid by contractor
Replacement of old damage LT Bushing.Material to Provid by contractor
Providing and connecting earth strip for neutral & body earthing as per standards Material to Provid by contractoror
Carriage of TF to workshop and reinstalling after repairing
Spot Maintennance of 250 KVA (27 Nos) Medium Capacity Transformer
Opening of top cover of Transformers removing the old gaskets, Packing, Oil Seals after draining of Transformer oil upto required level and fixing the new gaskets packing, oil seals to stop the leakage of oil, re- fixing the top cover and conservator etc.
Replacement of old damage LT Bushing Rod .Material Provid by contractor
Replacement of old damage HT Bushing Rod.Material Provid by contractor
Replacement of old damage Lugs.Material Provid by contractor
Replacement of old damage Z clamp.Material Provid by contractor
Replacement of old damage leads unarmoured Aluminium XLPE Cable (1X400 sq mm.) Material to Provid by contractor
Opening the breather and removal of silica gel and providing new silica gel and re-fixing the air breather after refilling of silica gel breather.Also providing new breather with silica gel if not availbale.Material to Provid by contractor
Replacement of old damage HT Bushing.Material Provid by contractor
Replacement of old damage LT Bushing.Material to Provid by contractor
Providing and connecting earth strip for neutral & body earthing as per standards Material to Provid by contractoror
Carriage of TF to workshop and reinstalling after repairing
Spot Maintennance of 400 KVA (5 Nos) Medium Capacity Transformer
Opening of top cover of Transformers removing the old gaskets, Packing, Oil Seals after draining of Transformer oil upto required level and fixing the new gaskets packing, oil seals to stop the leakage of oil, re- fixing the top cover and conservator etc.
Replacement of old damage LT Bushing Rod .Material Provid by contractor
Replacement of old damage HT Bushing Rod.Material Provid by contractor
Replacement of old damage Lugs.Material Provid by contractor
Replacement of old damage Z clamp.Material Provid by contractor
Replacement of old damage leads unarmoured Aluminium XLPE Cable (1X630 sq mm.) Material to Provid by contractor
Opening the breather and removal of silica gel and providing new silica gel and re-fixing the air breather after refilling of silica gel breather.Also providing new breather with silica gel if not availbale.Material to Provid by contractor
Replacement of old damage HT Bushing.Material Provid by contractor
Replacement of old damage LT Bushing.Material to Provid by contractor
Providing and connecting earth strip for neutral & body earthing as per standards Material to Provid by contractoror
Carriage of TF to workshop and reinstalling after repairing
uksV& mijksDr dk;Z dks iw.kZ djus es ;fn fdlh dk;Z gsrq ,usDtj&ch rFkk lkexzh gsrq ,usDtj&, es mYys[k ugh gS ,oa mls fd;k tkuk vHkh"B gS rks lafonkdkj dks mls fcuk fdlh vU; O;; ij fd;k tk,xkaA
B P ENTERPRISES
ABHISHEK ASSOCIATES
Dinesh Traders
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .