Tender Value
₹153.9 Cr
EMD Value
₹77.0 L
Closing Date
2 May 2022, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Presidency Division, P.W.D., 2nd floor, Bandhakam Bhavan, 25, Marzban Road, Fort, Mumbai- 400 001
Construction of 56 Residential quarters for Hon. Judges of Bombay High Court at Lands End House, Malabar hills, Mumbai.(Civil Work and Electrical Work)
2022_PWR_791584_1
EE/PD/TC/Notice No-81(Recall)
Open Tender
Civil Works
Item Rate
1096 days
Mumbai
Please refer Tender documents
3 documents required · 3 mandatory
₹5,900
₹77.0 L
Yes
11 Oct 2022
21 Apr 2022
6 May 2022
21 Apr 2022
2 May 2022
21 Apr 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 5 | Excavation by using splitters for foundations, substructures, basements, tanks, sumps, walls, chambers, manholes, trenches, poles, pits & general building works in hard rock, reinforced concrete, for depths/lifts upto 1.5M, including drilling, breaking in small pieces, mucking, dressing/trimming the sides, leveling of bottoms, manual dewatering, removing rank vegetation, backfilling in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97% Modified Proctor density conforming to relevant IS, stacking in measurable heaps for future use within owners space or disposing within an initial lead of 150m as directed by Engineer-in-Charge, loading, unloading, leveling excluding shoring, strutting etc. complete. Note: 1) The rate includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc. 2) It also includes the royalty and other taxes if any. (Lift 6.00m to 7.50m)
(The rate is inclusive of all lead and lift) | 118.9 | Per One Cubic Metre | 2,895.4 | ₹3,44,263.06 |
| 14 | Providing and laying Cast in situ / Ready Mix cement concrete in M15 of trap / granite / quartzite / gneiss metal for steps including steel centering, formwork, laying / pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honey combed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honey combed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.(Wooden centering will not be allowed.), with fully automatic microprocess or based PLC with SCADA enabled reversible Drum Typemixer / concrete Batch mix plant (Panmixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) (The rate is inclusive of all lead and lift) | 884.9 | Per One Cubic Metre | 6,331.5 | ₹56,02,744.35 |
| 15 | Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. columns as per detailed designs and drawing or as directed including steel centering, formwork, precast concrete cover blocks of same or Higher Grade, laying /pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) [Bd.F.3 Page No. 298 and B.7, Page No.38] item also includes adding of corrosion inhibiting admixture in concrete to protect steel bars for all concrete in every part Polyalk CP 293 of approved make & approved by Engineer in charge and as per manufacturer specifications. (The rate is inclusive of all lead and lift) | 708.8 | Per One Cubic Metre | 8,017.8 | ₹56,83,016.64 |
| 34 | Providing Fusion Bonded Epoxy Coating (FBEC) to reinforced bars of 8mm diameter as per IS: 13620-1993 specifications for a thickness of 175micron Permissible variation of 50 micron including testing of coating at plant, including cost for careful handling using PVC coating, binding wires instead of G. I. wires to and from Plant) touching up the material supplied repair work etc complete as per detailed specifications. (Lead 200km from plant) etc complete. (Item shall be used for new structures.)
Note : The item should be executed with prior approval of Superintending Engineer.
FREQUENCY OF TEST OF FUSION BONDED EPOXY COAT
a) Coating thickness shall be tested at a frequency of not less than one full length bar every twenty bars for each size
b) continuity of coating shall be determined by testing one full length bar in every twenty bars for each size
c) Coating thickness over the whole of the coated bar section shall be determined by sectioning and examining one bar in every twenty tonnes for each size.
d) For testing adhesion of coating, samples shall be selected from each size according to the frequency given below:
Nominal Size of Bar, MM Number of Samples
For all types of bar : Minimum 1 for every diameter or as directed by engineer in charge (The rate is inclusive of all lead and lift) | 81.87 | Per One Metric Tonne | 20,294.4 | ₹16,61,502.53 |
| 35 | Providing Fusion Bonded Epoxy Coating (FBEC) to reinforced bars of 10mm diameter as per IS: 13620-1993 specifications for a thickness of 175micron Permissible variation of 50 micron including testing of coating at plant, including cost for careful handling using PVC coating, binding wires instead of G. I. wires to and from Plant) touching up the material supplied repair work etc complete as per detailed specifications. (Lead 200km from plant) etc complete. (Item shall be used for new structures.)
Note : The item should be executed with prior approval of Superintending Engineer.
FREQUENCY OF TEST OF FUSION BONDED EPOXY COAT
a) Coating thickness shall be tested at a frequency of not less than one full length bar every twenty bars for each size
b) continuity of coating shall be determined by testing one full length bar in every twenty bars for each size
c) Coating thickness over the whole of the coated bar section shall be determined by sectioning and examining one bar in every twenty tonnes for each size.
d) For testing adhesion of coating, samples shall be selected from each size according to the frequency given below:
For all types of bar : Minimum 1 for every diameter or as directed by engineer in charge (The rate is inclusive of all lead and lift) | 65.15 | Per One Metric Tonne | 16,191 | ₹10,54,843.65 |
| 36 | Providing Fusion Bonded Epoxy Coating (FBEC) to reinforced bars of 12mm diameter as per IS: 13620-1993 specifications for a thickness of 175micron Permissible variation of 50 micron including testing of coating at plant, including cost for careful handling using PVC coating, binding wires instead of G. I. wires to and from Plant) touching up the material supplied repair work etc complete as per detailed specifications. (Lead 200km from plant) etc complete. (Item shall be used for new structures.)
Note : The item should be executed with prior approval of Superintending Engineer.
FREQUENCY OF TEST OF FUSION BONDED EPOXY COAT
a) Coating thickness shall be tested at a frequency of not less than one full length bar every twenty bars for each size
b) continuity of coating shall be determined by testing one full length bar in every twenty bars for each size
c) Coating thickness over the whole of the coated bar section shall be determined by sectioning and examining one bar in every twenty tonnes for each size.
d) For testing adhesion of coating, samples shall be selected from each size according to the frequency given below:
For all types of bar : Minimum 1 for every diameter or as directed by engineer in charge (The rate is inclusive of all lead and lift) | 61.78 | Per One Metric Tonne | 13,970.25 | ₹8,63,082.05 |
| 37 | Providing Fusion Bonded Epoxy Coating (FBEC) to reinforced bars of 16mm diameter as per IS: 13620-1993 specifications for a thickness of 175micron Permissible variation of 50 micron including testing of coating at plant, including cost for careful handling using PVC coating, binding wires instead of G. I. wires to and from Plant) touching up the material supplied repair work etc complete as per detailed specifications. (Lead 200km from plant) etc complete. (Item shall be used for new structures.)
Note : The item should be executed with prior approval of Superintending Engineer.
FREQUENCY OF TEST OF FUSION BONDED EPOXY COAT
a) Coating thickness shall be tested at a frequency of not less than one full length bar every twenty bars for each size
b) continuity of coating shall be determined by testing one full length bar in every twenty bars for each size
c) Coating thickness over the whole of the coated bar section shall be determined by sectioning and examining one bar in every twenty tonnes for each size.
d) For testing adhesion of coating, samples shall be selected from each size according to the frequency given below:
For all types of bar : Minimum 1 for every diameter or as directed by engineer in charge (The rate is inclusive of all lead and lift) | 53.8 | Per One Metric Tonne | 10,904.25 | ₹5,86,648.65 |
| 38 | Providing Fusion Bonded Epoxy Coating (FBEC) to reinforced bars of 20mm diameter as per IS: 13620-1993 specifications for a thickness of 175micron Permissible variation of 50 micron including testing of coating at plant, including cost for careful handling using PVC coating, binding wires instead of G. I. wires to and from Plant) touching up the material supplied repair work etc complete as per detailed specifications. (Lead 200km from plant) etc complete. (Item shall be used for new structures.)
Note : The item should be executed with prior approval of Superintending Engineer.
FREQUENCY OF TEST OF FUSION BONDED EPOXY COAT
a) Coating thickness shall be tested at a frequency of not less than one full length bar every twenty bars for each size
b) continuity of coating shall be determined by testing one full length bar in every twenty bars for each size
c) Coating thickness over the whole of the coated bar section shall be determined by sectioning and examining one bar in every twenty tonnes for each size.
d) For testing adhesion of coating, samples shall be selected from each size according to the frequency given below:
For all types of bar : Minimum 1 for every diameter or as directed by engineer in charge (The rate is inclusive of all lead and lift) | 27.7 | Per One Metric Tonne | 9,069.9 | ₹2,51,236.23 |
| 40 | Providing Fusion Bonded Epoxy Coating (FBEC) to reinforced bars of 32mm diameter as per IS: 13620-1993 specifications for a thickness of 175micron Permissible variation of 50 micron including testing of coating at plant extra cost for careful handling using PVC coating, binding wires instead of G. I. wires to and from Plant) touching up the material supplied repair work etc complete as per detailed specifications. (Lead 200km from plant) etc complete. (Item shall be used for new structures.)
Note : The item should be executed with prior approval of Superintending Engineer.
FREQUENCY OF TEST OF FUSION BONDED EPOXY COAT
a) Coating thickness shall be tested at a frequency of not less than one full length bar every twenty bars for each size
b) continuity of coating shall be determined by testing one full length bar in every twenty bars for each size
c) Coating thickness over the whole of the coated bar section shall be determined by sectioning and examining one bar in every twenty tonnes for each size.
d) For testing adhesion of coating, samples shall be selected from each size according to the frequency given below:
For all types of bar : Minimum 1 for every diameter or as directed by engineer in charge (The rate is inclusive of all lead and lift) | 5.5 | Per One Metric Tonne | 6,293.7 | ₹34,615.35 |
| 73.2 | Providing and laying ceramic tiles having size 30cm. x 45cm. confirming to corresponding I.S. for dado and skirting in required position with ready made adhesive mortar of approved quality on plaster of 1:2 cement mortar including joint filling with white / colour cement slurry cleaning curing etc. complete. (The rate is inclusive of all lead and lift) Above 1st Podium Level | 2,564.7 | Per One Square Metre | 1,536.25 | ₹39,40,020.37 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1362366.xls
BOQ Document • 0.87 MB
96665210.pdf
Tender Document • 0.16 MB
DTP.pdf
Tender Document • 4.53 MB
1_Architectural_Drawing_Part_1.rar
Tender Document • 16.06 MB
1_Architectural_Drawings_Part_2.rar
Tender Document • 19.86 MB
1_Architectural_Drawings_Part_3.rar
Tender Document • 19.78 MB
2_Structural_Drawings_Part_1.rar
Tender Document • 27.40 MB
2_Structural_Drawings_Part_2.rar
Tender Document • 28.21 MB
3_MEP_Drawings.rar
Tender Document • 29.69 MB
96665224.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .