| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.9 LAccepted-AOC | L1 | Accepted-AOC Stood as L1 | |
| 2 | L1₹51.3 LAccepted-AOC | L1 | Accepted-AOC Stood as L1 |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
21 Oct 2020, 2:00 pmClosed
Executive_Engineer_Guwahati_Division
Office_of_the_Executive_Engineer_Guwahati_Division_Irrigation_Guwahati_07
CONSTRUCTION OF APPROACH ROAD, OPERATOR SHED, DIVERSION CHANNEL, GUIDE BUND, AFFLUX BUND AND CANAL STRUCTURES OF DOLBARI KANIHA FLOW IRRIGATION SCHEME UNDER SOPD DURING THE YEAR 2019-2020
2020_ID_18831_1
GDI_TECH_E_TDR_18_19_164_23
Open Tender
Civil Works
Item Rate
365 days
Nalbari
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Irrigation Department
₹2.0 L
Yes
26 Nov 2020
30 Sept 2020
21 Oct 2020
30 Sept 2020
21 Oct 2020
30 Sept 2020
Amount
Guide and Afflux Bund
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layer not exceeding 15cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat at embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M complete as directed. Guide Bund
Earthwork in excavation in foundation of structures by means of Hydraulic Excavator in all soils including mud, silt, sady clay from the river bed, etc, including clearing the side, dressing,etc.,and removing the earth by loading to dumpers for farther carrige to asafe distance, completeas directed . (0.30 CuM Bucket) Toe wall
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). Toe wall
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered).(Abutment / Return Wall / Piers / Pedestal etc.) (ii) With 38 mm thick wood plank
Plain CC work in 40% plum hard blasted boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size stone aggregate including curing, shuttering etc, complete as directed. (Shuttering cost will be paid separately). Guide Bund
Diversion Channel and Closing Bund
Earth work in excavation in diversion/ Feeder channel to the designed section and grade by depositing the spoils in the form of embankment on either side in layers not exceeding 15 cm thick including clearing light jungles, Removing trees up to 15 cm dia and uprooting roots and stumps etc. from the seat of embankment and canal and free from all vegetation including breaking clods to not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water where necessary complete as directed. B) In Hard soil (i) Soil mixed with gravel or moram upto 50 mm size
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layer not exceeding 15cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat at embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M complete as directed.
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Construction of whole Bamboo single pallasiding with matured bholuka bamboo post 7.5 cm to 10 cm dia 5 cm apart 1.5 m to 1.8 m above ground and 1.00 m to 1.2 m below ground with jati bamboo struts placed 1.2 m to 1.5 m apart tied with Galvanised wire with 16 G to 18 G complete with 3 rows of horizontal half jati bamboo kamies complete as directed.
Supply and laying of cement bags filled with sand/ earth (as locally available) including stitching the mouth, laying, fixing in position as directed complete with supply of bags, sutlies etc.all complete.
Approach Road
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layer not exceeding 15cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat at embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M complete as directed.
Collection and supply of sand and gravel (40% sand and 60% gravel) of size 13mm to 38mm from approved quarry including loading, unloading and stacking in measurable stacks at work site up to a height of 1.00m including payment of forest royality etc.
Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30.00 M and lift 1.50 M. Complete as directed.
Operator Shed
Earth work in excavation for foundation trenches of walls, retaining walls, footings of columns, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling , dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m below the existing ground level (a) In ordinary soil
Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. (a).Brick on flat soling.
Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately). (a) In prop 1 : 3 : 6 (1 cement: 3 coarse sand: 6 coarse aggregate by volume) Footing
Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) (A) In substructure up to plinth level.Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works not less than 100mm thick up to plinth level. M20 or prop. 1:1.5:3
(B) In superstructure Columns, pillars, posts, struts, suspended floor, roof, landing, shelf and support, balcony, lintel, sill band, beam, girder, bressumer, cantilever, staircase (except spiral staircase and landing) including preparing the top surface and finishing of nosing. (i) In super structure from plinth level to first floor level M20 or prop. 1:1.5:3
Earth/sand filling in plinth in layers not more than 150mm thick including necessary carriage, watering, ramming etc. complete as directed and specified. Including payment of land compensation, forest royalty, sales tax and other duties and taxes as may be necessary. With silt (predominantly non plastic) by truck carriage including loading and unloading
65 mm thick cement concrete floor consisting of 50 mm under layer of cement concrete in prop. 1:3:6 (1cement : 3 coarse sand : 6 coarse aggregate of 25mm and down) and 15 mm thick wearing layer in cement concrete in prop. 1:1:2 (1cement :1 coarse sand : 2 coarse aggregate of size 10mm down) laid in panels and finished with a floating coat of neat cement finish (using cement slurry for bond @ 2.75 kg. per square metre of floor area) including curing etc. complete as directed. Floor
Centering and shuttering including propping etc wherenecessary and removal of forms after completion of CCand RCC works, complete as directed. (Measurement to be taken on the face area timbered). 1 .Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc.Using 25mm thick plank
2. Sides of tie beams, plinth beams, grade beams etc. at or below plinth level Using 25mm thick plank
3. Columns, pillars, posts & strut(a) Square, Rectangular, Polygonal in plan or anyshape like Tee/L etc. having plan vertical face Using 25mm thick plank
4. Sides and soffits of beam, beam haunchings, cantilever girders, bressumers, lintels and horizontal ties. (a) For depth not exceeding 1.0M Using 25mm thick plank
5. Flat surfaces such as soffits of suspended floors, roofs, landings, cantilevers slabs, chajjas, balconies and the like. (a) Floors etc. up to 200mm in thickness Using 25mm thick plank
Brick work in cement morter with 1st class brick including racking out joints and curing complete as directed. (ii) In proportion 1:4
Providing and laying 25mm thick damp proof course with cement concrete in prop 1:1.5:3 with graded stone agg. of 10mm down nominal size including providing approved damp proof admixture in proportion as recommended by the manufacturer including curing etc. complete as directed.
1st class brick nogged wall in cement mortar including racking out joints and curing complete as directed in super structure above plinth up to 1st floor level (protruding M.S rod/Tor steel of column to be embeded in cement mortar and will be measured and paid separately) (A) 112mm thick brick wall (a) In cement mortar in proportion 1:4.
Providing wood work in frame (chowkaths) of doors, windows, clerestory windows and other similar works wrought, framed and fixed in position in contact with C.C or brick masonry wall including supplying, fitting and fixing with M.S. hold fast (40mmx3mmx250mm) as per design embeded in cement concrete block in proportion 1:2:4 and with two coats of kiricide oiling to the timber faces in contact with C.C and masonry as directed and specified. Sal wood
Providing, fitting and fixing full panelled doors/ windows including oxidised M.S butt hinges (100mm x75 mm x3.55mm) with necessary screws (other fittings to be measured and paid separately ) B) With 1st class local wood - 40mm thick
Providing fitting and fixing 1st class local wood battened, ledged and braced door and window shutters including oxidised iron butt hinges (100mmx 58mmx1.90mm) 6 nos with necessay screws. (b) Using Gamari wood - 25mm thick
Providing and fixing clear sheet glass beded in putty and fixed with / without wooden beadings including necessary cutting of glass to required sizes (payment for wooden beads shall be made separately). Area of glass panes exceeding 0.15 m2 but not exceeding 0.52 m24.00mm thick
Providing barge board of size 200mm x 20mm with 1st class local Hollock / Bonsum timber including fitting and fixing with necessary wood screws etc. complete.
Providing fitting and fixing M.S. grill of required pattern for windows/ clerestory windows / opening width M.S. flats at required spacing in frame all round , square or round M.S. bars with round headed bolts and nuts or screws. Ornamental gril lFixed to wooden frame
Providing undressed wood work in roof truss, rafter, purlin, tie and the like including hoisting and fixing in position with necessary spikes, nails including M.S straps with bolt and nuts etc.complete with kiricide oiling two coats to all timber members and two coats of anticorrosive paint to M.S straps (M.S flats, angle cleats, and bolt and nuts required for flat and angle cleats wherever used shall be measured and paid separately) Sal wood
Providing and fixing, in position suspended false ceiling using E-Grid (exposed ceiling suspension 2430 system) of grid size 600mm x 600mm/1200mmx600mm with main runner 38 x 24mm, cross tee 29mm x 24mm & wall angle 24mm x 24mm . Using 4mm/6mm thick High Pressure Steam Cured Non Asbestos Fibre Cement Board as per IS 14862, to be placed in a grid of G.I. system duly suspended with 4mm/6mm dia G.I/M.S bar hanger fixed with steel dash fasteners or iron purlin from the roof with adjustment clip providing positions for light fixtures, air conditioning diffuser and ducts, sprinklers, smoke detectors etc. The main runners to be secured to structural soffit by hanger @ 1220mm maximum c/c. The last hanger at the end of each main runner should not be placed at more than 450mm from the adjacent wall. Flush fitting 1220mm cross tee to be interlocked between main runners @ 610mm c/c, so as to form 600mm x 600mm/1200mmx600mm grid, all complete as per the drawing & directions of engineer-in-charge. Finally, if specified, boards are to be painted with 2 coats of acrylic emulsion paint of approved shade/make over a coat of cement primer before installing it on the grid. (A) Standard Ceilings of Everest make or equivalent as directed by the departement (i) Using 4 mm thick FC Board
15mm thick cement plaster in single coat on rough side of single or half brick was for exterior plastering including arises, internal rounded angles not exceeding 80mm in girth and finish even and smooth including curing complete as directed. (ii) In proportion 1:4
Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete.a) From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL (ii)Super Ductile (SD) TMT reinforcement bars 10mm dia (No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level)
Providing fitting, hoisting and fixing of roof trusses including purlins fabricated using MS circular hollow section conforming to relevant I.S. code, as per approved design and drawings including providing M.S. cleats, base plates, bolts and nuts and one coat of red oxide Zinc Chromate primer and two coats of approved enamel paints complete including fitting necessary cleats etc. for fixing ceiling joists as per design and drawing as directed. b) Using other ISI marked approved circular hollow section 42.20 mm OD
Providing corrugated galvenised Iron sheet roofing of TATA SHAKTEE / SAIL including fitting and fixing necessary galvenised J or L hooks, bolts and nuts 8 mm dia with bitumen washer 25 mm dia x 3 mm thick and 1.6 mm thick limpet washer complete excluding cost of roof truss, purlin etc. (Roof trusses and purlin etc.to be measured and paid separately). (e) 0.63 mm thick
Providing galvd iron ridging of TATA SHAKTEE / SAIL including supplying and fixing necessary galvd screws/washers etc. complete as directed. (e) 0.63 mm thick -230mm long
Supplying,fitting ,fixing anodized aluminium fittings of approved make , reasonably smooth, free from sharp edges and corners , flaws and other defects and with counter sunk holes for screws including necessary aluminium screws etc complete (anodized to bright natural matt and satin finished ) (a) Tower bolt for door (i) 200mm x 12 mm
(b) Tower bolt for window (i) 100mm x 10 mm
(c) Door handles(i) 100mm
(ii) (c) Door handles 150mm
Wall painting (two coats) with acrylic emulsion paint approved brand and manufacture (Asian paint/ Berger paint/ ICI paint/ J & N paint/ Nerolac) on new surface to give an even shade after throughly brushing the surfaces free from mortar droppings and other foreign matter and sand papered smooth. (a).Acrylic Emulsion Paint approved brand and manufacture (Asian paint/ Berger paint/ ICI paint/ J & N paint/ Nerolac)
Applying priming coat over new wood and wood based surfaces over 100 mm in girth/width after and including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting . (a) With ready mixed paint ,wood primer (white).
Painting two coats (excluding priming coat) on new wood and wood based surface with enamel paint of approved brand and manufacture to give an even shade including cleaning the surface of all dirt, dust and other foreign matters sand papering and stopping . (i) Surfaces over 100mm in width or girth (i) General purpose (Asian paints/ICI paints/ J & N paints /Nerolac)
Applying priming coat over new steel and other metal surfaces over 100 mm in width or girth after preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter and scoured with wire brushes, fine steels, wood scrapers and sand paper. a) With ready mixed "red-lead / red oxide" primer.
Painting two coats (excluding priming coat) on new steel and other metal surface with enamel paint of approved brand and manufacture(Asian paint/ Berger paint/ICI paint/ J&N paint/ Nerolac) to give an even shade including cleaning the surface of all dirt, dust and other foreign matter. (i) Surfaces over 100mm in width or girth (a) General purpose (Asian paint/ Berger paint/ICI paint/ J&N paint/ Nerolac).
150mm dia HP outlet (10 nos)
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary )For normal lead of 30m and lift of 1.50m .a. All type of soil except soil mixed with gravel and boulders a. All type of soil except soil mixed with gravel and boulders
C.C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supply and carriage of 150mm dia R.C.C. hume pipe from factory to the work site by truck including loading and unloading at both ends complete.
Labour for fitting and fixing hume pipe in position with collars including joining the cement mortar in proportion 1:3 and curing, including carrying the same from godown to site and complete as directed.
12 mm cement plastering including clearing surface and curing complete as directed. In prop. 1:4
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Cattle Crossing
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). A. All types of soils except soil mixed with gravel and boulders
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). Abutment foundation
C.C work in proportion 1:2:4 in foundation/ abutment/ piers/ wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm from river boulder including curing with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).i) For abutment wall
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed .i) 10mm dia bars
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) With 38 mm thick wood plank
12 mm cement plastering including clearing surface and curing complete as directed. In proportion 1:4
Item No. 7 : Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Cattle and Cart Crossing
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). A. All types of soils except soil mixed with gravel and bouldersi. For normal lead 30m and lift of 1.50m
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). Abutment base Wing walls
C.C work in proportion 1:2:4 in foundation/ abutment/ piers/ wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm from river boulder including curing with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately). Abutment wall
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) With 38 mm thick wood plank
12 mm cement plastering including clearing surface and curing complete as directed. In proportion 1:4
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
0.60M dia HP double barrel Cross Drainage
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). A. All types of soils except soil mixed with gravel and bouldersi. For normal lead 30m and lift of 1.50m
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). Abutment base Wing walls
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying of 0.60M dia NP2 RCC Hume Pipe with carriage complete as directed. (a) Hume pipe
(b) Collar
Labour for fitting and fixing hume pipe in position with collars including joining the cement mortar in proportion 1:3 and curing, including carrying the same from godown to site and complete as directed. For 60 cm to 90 cm dia
Centering and shuttering including propping etc. where necessary and removal of forms after completion of CC and RCC work with 0.025m thick planks complete as directed. (Measurement to be taken on the face area timber). With 38 mm thick wood plank
12 mm cement plastering including clearing surface and curing complete as directed. In prop.1:4
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Gated Inlet
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). a. All type of soil except soil mixed with gravel and boulders
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying of 0.90M dia NP2 RCC Hume Pipe with carriage complete as directed.
Collar
Labour charge for fitting, fixing hume Pipe in position with collars including local carriage, placing and joining the joints in cement mortar in prop. 1:3 as directed by the Department.
12 mm cement plastering including clearing surface and curing complete as directed. In prop.1:4
Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M complete as directed.
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Supplying, fitting, fixing with hoisting arrangement including wedding, fabricating, fitting in position, painting two coats with anti-corrosive paints of approved quality to the design and specification.
MS Luhit Enterprise
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .