Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-Finance 1 21 B8 KHADAR MEERAN NAGAR THERMAL NAGAR TUTICORIN | ₹20.7 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹22.1 LAccepted-Finance S NO 73 BANKERS COLONY EAST ZONE SARAVANAMPATTI COIMBATORE 641035 | COIMBATORE | COIMBATORE | TAMIL NADU | 641035 | ₹22.1 L | L2 | Accepted-Finance BOQ Rate accepted |
| 3 | L3₹27.7 LAccepted-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | ₹27.7 L | L3 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | A.K.B RAJA ENTERPRISES | Ramesh Enterprises | SAKTHI ENTERPRISES |
|---|---|---|---|---|---|---|
| 1.00 | Chipping and removing the deteriorated damaged concrete surface of RCC structures including all foreign materials and leaving behind only firm and solid concrete including cleaning with water, removing the loose rust deteriorated on the reinforcement by brushing and sand blasting or hydro blasting at a pressure not exceeding 7 Kg/cm²., cleaning with jet air etc, including applying one coat of Nitozinc primer to the exposed reinforcement rods, including all labours, tool equipments, staging propping etc., complete as directed by the Engineer at site. | 331.55 | M2 | 2,97,400.35 ₹3.5 L | 3,97,860 ₹4.7 L | 3,31,550 ₹3.9 L |
| 2.00 | Gunitting the prepared concrete surface at an average thickness of 50mm in two layer of 25mm each using op/pp cement mortar (1:3) by volume as per ISI 9082/1978 using guniting equipment the mixture being ejected and shot in to the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry including cost of all materials, labour, lead, lift, T&P, staging, transport etc complete. | 331.55 | M2 | 11,04,393.05 ₹13.0 L | 14,58,820 ₹17.2 L | 11,27,270 ₹13.3 L |
| 3.00 | Supplying Cutting, bending & tying in position secondary reinforcement wherever using GI weld mesh of size 75 X 50mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in postion as per the engineer at site including cost of all materials labours, lead, lift, etc, complete | 331.55 | M2 | 1,57,486.25 ₹1.9 L | 2,15,507.5 ₹2.5 L | 1,65,775 ₹2.0 L |
| 4.00 | Applying DEKGUARD/ equivalent primer by spraying to the newly gunitted concrete surfaces as per manufactures specifications rate including cost of all materials, labours, lead, lifts etc., complete. | 331.55 | M2 | 53,379.55 ₹62,987.87 | 82,887.5 ₹97,807.25 | 53,048 ₹62,596.64 |
| 4.20 | Applying two coats of DEKGUARD S / equivalent top coat to the exposed concrete surfaces by brush/roller coating continuously rate including cost of all materials, labours, lead, lift, etc, complete. | 1,326.05 | M2 | 4,53,509.1 ₹5.4 L | 6,09,983 ₹7.2 L | 5,30,420 ₹6.3 L |
Tender Value
Refer Docs
EMD Value
₹21,500
Closing Date
26 Feb 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Remedial measures by Strengthening and Providing Protective Coating in the RCC PSC Structures in Conveyor - 15 Long Span 35 - 39 and Short Span 40 - 41 in Red Gate area North Break Water of VOC Port at ECHS areas
2026_EB_661488_1
CE SE C TTPS Spec.No. 283 25 26
Open Tender
Civil Works - Others
120 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,500
Yes
2 Mar 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Chipping and removing the deteriorated damaged concrete surface of RCC structures including all foreign materials and leaving behind only firm and solid concrete including cleaning with water, removing the loose rust deteriorated on the reinforcement by brushing and sand blasting or hydro blasting at a pressure not exceeding 7 Kg/cm²., cleaning with jet air etc, including applying one coat of Nitozinc primer to the exposed reinforcement rods, including all labours, tool equipments, staging propping etc., complete as directed by the Engineer at site.
Gunitting the prepared concrete surface at an average thickness of 50mm in two layer of 25mm each using op/pp cement mortar (1:3) by volume as per ISI 9082/1978 using guniting equipment the mixture being ejected and shot in to the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry including cost of all materials, labour, lead, lift, T&P, staging, transport etc complete.
Supplying Cutting, bending & tying in position secondary reinforcement wherever using GI weld mesh of size 75 X 50mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in postion as per the engineer at site including cost of all materials labours, lead, lift, etc, complete
Applying DEKGUARD/ equivalent primer by spraying to the newly gunitted concrete surfaces as per manufactures specifications rate including cost of all materials, labours, lead, lifts etc., complete.
Applying two coats of DEKGUARD S / equivalent top coat to the exposed concrete surfaces by brush/roller coating continuously rate including cost of all materials, labours, lead, lift, etc, complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_793973.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid