| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.8 LAccepted-AOC | ₹57.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹66.7 LRejected-AOC 475 OPP DAMAN GANGA COLONY GAYTRI MANDIR ROAD AMLI SILVASSA 396230 U T OF D NH | DADRA AND NAGAR HAVELI | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396230 | ₹66.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹68.3 LRejected-AOC | ₹68.3 L | L3 | Rejected-AOC L3 |
| 4 | L4₹72.2 LRejected-AOC DADRA AND NAGER HAVELI DN | DADRA AND NAGAR HAVELI | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396193 | ₹72.2 L | L4 | Rejected-AOC L4 |
| 5 | Not Admitted-Fee/PreQual/Technical DADRA AND NAGER HAVELI DN | DADRA AND NAGAR HAVELI | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396193 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | S K PARMAR L2 | Ekta Construction L4 | Subhash Construction L3 | S.N.L. & CO. L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | EXCAVATION upto 1.50 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Dense or Hard soil MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, cutting vegetation up to 1.5m ht if required and disposing off the excavated stuff upto all lead and lift. Note- All types of soil that can be removed by JCB/ Poclain bucket shall be classified under this item. | 263.25 | CUM | 400 ₹1,05,300 | 250 ₹65,812.5 Lowest | 250 ₹65,812.5 Lowest | 327 ₹86,082.75 |
| 2.00 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard Murrum MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift. | 154.44 | CUM | 400 ₹61,776 | 250 ₹38,610 Lowest | 250 ₹38,610 Lowest | 350 ₹54,054 |
| 3.00 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Soft rock not requiring blasting but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift. | 52.65 | CUM | 500 ₹26,325 | 250 ₹13,162.5 Lowest | 250 ₹13,162.5 Lowest | 400 ₹21,060 |
| 4.00 | FILLING with selected & approved available excavated earth (exluding rock) in excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. | 272.11 | CUM | 200 ₹54,422 | 300 ₹81,633 | 300 ₹81,633 | 175 ₹47,619.25 Lowest |
| 5.00 | FILLING with selected & approved Murrum material brought by Contractor from outside client's premises, including Identification of Borrow pits and including Royalty charges & or duties as per requirement of local authority, in foundations, excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. | 928.12 | CUM | 600 ₹5,56,875 | 500 ₹4,64,062.5 | 300 ₹2,78,437.5 Lowest | 500 ₹4,64,062.5 |
| 6.00 | Providing and laying RUBBLE SOLING wherever required in foundation and plinth including hand packing fillings interstices with chips and sand. Watering and compacting to consolidated thickness, etc complete as directed by engineer-in-charge | 40.37 | CUM | 500 ₹20,185 Lowest | 1,000 ₹40,370 | 1,000 ₹40,370 | 875 ₹35,323.75 |
| 7.00 | Providing and laying PLAIN CEMENT CONCRETE 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) in foundations and superstructure including, machine mixing, leveling compacting, curing and formwork if any, scaffolding, staging etc. complete as directed and instructed by Engineer-in-Charge. Volume of PCC laid to be measured for payment. | 17.55 | CUM | 8,000 ₹1,40,400 Lowest | 10,000 ₹1,75,500 | 10,000 ₹1,75,500 | 8,000 ₹1,40,400 Lowest |
| 8.00 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Columns, Pillars posts and struts etc complete as directed by Engineer-incharge.
Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. | 2.75 | CUM | 15,000 ₹41,250 | 15,000 ₹41,250 | 15,000 ₹41,250 | 9,500 ₹26,125 Lowest |
| 9.00 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.200 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel ,scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Slabs ,landing, shelves, Balconies, Lintels, Beams, Girders and Cantilever etc complete as directed by Engineer-incharge.
Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. | 4.05 | CUM | 15,000 ₹60,750 | 15,000 ₹60,750 | 15,000 ₹60,750 | 8,500 ₹34,425 Lowest |
| 10.00 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in WALLS from top foundation level to all levels etc complete as directed by Engineer-incharge.
Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. | 177.3 | CUM | 14,500 ₹25,70,850 | 15,000 ₹26,59,500 | 14,000 ₹24,82,200 | 9,350 ₹16,57,755 Lowest |
Tender Value
₹54.1 L
EMD Value
₹1.1 L
Closing Date
13 Mar 2026, 2:00 pmClosed
Executive Engineer, PWD,WD-I(B),DNH,Silvassa
PWD Campus Block No.I(Bldg), DNH, Silvassa
Construction of Retaining wall cum compound wall for Girls Hostel at Mandoni.
2026_UTDNH_7948_1
E-TENDER NOTICE NO.57 OF 2025-26 (BLDG)
Open Tender
Civil Works - Buildings
Item Rate
120 days
UT OF DNH
As per NIT refer
3 documents required · 3 mandatory
₹2,000
Executive Engineer, PWD,WD-I(B),DNH,Silvassa
₹1.1 L
25 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EXCAVATION upto 1.50 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Dense or Hard soil MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, cutting vegetation up to 1.5m ht if required and disposing off the excavated stuff upto all lead and lift. Note- All types of soil that can be removed by JCB/ Poclain bucket shall be classified under this item. | 263.25 | CUM | - | - |
| 2 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard Murrum MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift. | 154.44 | CUM | - | - |
| 3 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Soft rock not requiring blasting but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift. | 52.65 | CUM | - | - |
| 4 | FILLING with selected & approved available excavated earth (exluding rock) in excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. | 272.11 | CUM | - | - |
| 5 | FILLING with selected & approved Murrum material brought by Contractor from outside client's premises, including Identification of Borrow pits and including Royalty charges & or duties as per requirement of local authority, in foundations, excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. | 928.13 | CUM | - | - |
| 6 | Providing and laying RUBBLE SOLING wherever required in foundation and plinth including hand packing fillings interstices with chips and sand. Watering and compacting to consolidated thickness, etc complete as directed by engineer-in-charge | 40.37 | CUM | - | - |
| 7 | Providing and laying PLAIN CEMENT CONCRETE 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) in foundations and superstructure including, machine mixing, leveling compacting, curing and formwork if any, scaffolding, staging etc. complete as directed and instructed by Engineer-in-Charge. Volume of PCC laid to be measured for payment. | 17.55 | CUM | - | - |
| 8 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Columns, Pillars posts and struts etc complete as directed by Engineer-incharge.
Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. | 2.75 | CUM | - | - |
| 9 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.200 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel ,scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Slabs ,landing, shelves, Balconies, Lintels, Beams, Girders and Cantilever etc complete as directed by Engineer-incharge.
Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. | 4.05 | CUM | - | - |
| 10 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in WALLS from top foundation level to all levels etc complete as directed by Engineer-incharge.
Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. | 177.3 | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_8142.xls
BOQ • 0.45 MB
01MANDONIGIRLSHOSTELRETAININGWALLCOMPOUNDWALLDETAILS.pdf
Additional Documents • 1.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].