Tender Value
Refer Docs
EMD Value
₹4.8 L
Closing Date
24 Sept 2026, 12:00 pm2d left
S E VO VARANASI CIRCIL PWD VARANASI
S E VO VARANASI CIRCIL PWD VARANASI
Ramchandar ke ghar se Betavar primary pathsala tak marg ke Nirman ka karya.
2026_CEUVZ_1184163_14
4158/183COM-VNS CIRCAL PWD VARANASI
Open Tender
Civil Works - Roads
Fixed-rate
180 days
VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.8 L
S E VO VARANASI CIRCIL PWD VARANASI
11 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with approved material obtain from Borrow pits with all lift UPTO 1.5M, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table-300.1 and 300.2 with a lead up to 1000m as per Technical Specification Clause 301.5 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 3,140 | Cum | 56 | ₹1,75,840 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 330 | Cum | 2,153 | ₹7,10,490 |
| 3 | Providing, laying, spreading and compacting of sukrut stone aggregates of specific sizes (22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 225 | Cum | 2,734 | ₹6,15,150 |
| 4 | Construction of unreinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints and near approaches and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 450 | Cum | 7,780 | ₹35,01,000 |
| 5 | Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300.1 and 300.2 with a lead upto 1000m as per Technical Specification Clause As per MORD 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 812.5 | Cum | 62 | ₹50,375 |
| 6 | Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete. As per SOR, Item No-251(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 9.02 | Cum | 130 | ₹1,172.6 |
| 7 | Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work.As per SOR-2020 Item No-280 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 17.52 | Cum | 5,700 | ₹99,864 |
| 8 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km from the site of work and including watering dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work.As per SOR-2020 Item No-255 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 23.25 | Cum | 700 | ₹16,275 |
| 9 | M-150 brick work in 1:6 cement and coarse sand of mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. As per SOR-2020, Item No-333a(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 6.27 | Cum | 5,300 | ₹33,231 |
| 10 | Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work. As per SOR-2020, Item No-574(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 38.44 | Sqm | 185 | ₹7,111.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.42 MB
BOQ_2228133.xls
BOQ • 0.25 MB
T-2.pdf
Tender Documents • 0.47 MB
SUDHIPATRA.pdf
PDF • 0.17 MB
4328.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .