| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | ₹15.3 L | L1 | Accepted-AOC - |
| 2 | Rejected-Technical | - | - | Rejected-Technical - |
| Sl No | Description | Qty | Unit | D. TAMILRAJAN L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 113.75 | M3 | 219 ₹24,911.25 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 113.75 | M3 | 5,503 ₹6,25,966.25 Lowest |
| 3.00 | Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 6 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification | 48 | M2 | 451 ₹21,648 Lowest |
| 4.00 | Plain Cement Concrete 1:1.5:3 mix (One Cement, One & half Fine Aggregate and Three Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 113.75 | M3 | 7,497 ₹8,52,783.75 Lowest |
Tender Value
₹18.5 L
EMD Value
₹18,500
Closing Date
7 Jul 2026, 3:00 pmClosed
Executive Officer
Palanichettipatti Town Panchayat .
Renovation of Cement Concrete Road at Ward No13 Arasu Nagar 1st, 2nd and 3rd Cross Street (North to South) in Palanichettipatti Town Panchayat .
2026_DTP_682409_1
47-6/2026
Open Tender
Civil Works
Works
180 days
Palanichettipatti Town Panchayat .
Pls Refer Tender Document
2 documents required · 2 mandatory
₹0
₹18,500
1 Sept 2026
23 Jun 2026
7 Jul 2026
23 Jun 2026
7 Jul 2026
23 Jun 2026
23 Jun 2026 - 7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 113.75 | M3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 113.75 | M3 | - | - |
| 3 | Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 6 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification | 48 | M2 | - | - |
| 4 | Plain Cement Concrete 1:1.5:3 mix (One Cement, One & half Fine Aggregate and Three Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 113.75 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_820250.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .