| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.9 LAdmitted-Fee/PreQual/Technical/Finance | -29.99% | ₹20.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹21.8 LAdmitted-Fee/PreQual/Technical/Finance | -27.27% | ₹21.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.9 L
EMD Value
₹59,823
Closing Date
13 Aug 2026, 6:00 pmClosed
EE
WRD Udaipur
Construction of Repair and Renovation of Nanki ray anicut village Malwa ka chora Tehsil Kotra Dist Udaipur
2026_WRDAS_582634_1
EE/UDR/06/2026-27
Open Tender
Civil Works
Percentage
365 days
udaipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Secretary, RREIS
₹59,823
Yes
19 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle ,bushes, shrubs Ankra/Ipomoea ,Juliflora typna etc.on canal and bunds in dry/moist/slushy conditions includ ing disposal as per instructions of the Engineer-in-charge.Cost of wood has been deducted from rates and thus will be property of contractor after cutting. thick | 2,000 | Sqm | 2.5 | ₹5,000 |
| 2 | Dismentling of old plaster or skirting , racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground with in 50 meter lead inclusive of dewatering whereever required | 241.5 | Sqm | 20 | ₹4,830 |
| 3 | Demolishing stone rubble Masonry including stacking of usable material and disposal of unusable material within 50m lead inclusive of dewatering wherever required. In Cement mortar. | 40.03 | cum | 576.8 | ₹23,089.3 |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Hard soil mixed with Kankar / boulders, Morrum | 51 | cum | 119 | ₹6,069 |
| 5 | Earth work in excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50 m and lift upto 1.5 m in dry or moist including dressing of excavated area with cost of dewatering wherever required complete in all respect in (a)Soft / Disintegrated rock | 25 | cum | 161 | ₹4,025 |
| 6 | Earth work in excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50 m and lift upto 1.5 m in dry or moist including dressing of excavated area with cost of dewatering wherever required complete in all respect in (b)hard rock not require blasting | 51 | cum | 242 | ₹12,342 |
| 7 | Earth work in excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50 m and lift upto 1.5 m in dry or moist including dressing of excavated area with cost of dewatering wherever required complete in all respect in (c) Phylite & other hard rock requiring nominal blasting | 76 | cum | 346 | ₹26,296 |
| 8 | Earth work in excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50 m and lift upto 1.5 m in dry or moist including dressing of excavated area with cost of dewatering wherever required complete in all respect in (d) Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure & royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. | 51 | cum | 467 | ₹23,817 |
| 9 | preparation of foundation of structure including removal of all loose stones , silt and final washing. By manual labours | 98.7 | sqm | 23 | ₹2,270.1 |
| 10 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 21.06 | cum | 4,975 | ₹1,04,773.5 |
stage.html
html • 0.02 MB
finance_1035128.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1035128.xls
BOQ • 0.40 MB
NankiTD.pdf
Tender Documents • 4.09 MB
nit.pdf
Other Document • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].