Loading…
Loading…
Tender Value
₹1.6 L
EMD Value
₹7,865
Closing Date
29 Sept 2026, 6:55 pmDue today
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
construction road from PMGSY curve to Abdul ahad sheikh and others at shalkoot
2026_RDPR_324913_44
NIT_73_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
BUDGAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹7,865
Yes
16 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
29 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanica means means over areas (exceeding 30 cm in depth,1 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 1 meters and lift upto 1.5 m | 41.7 | Cum | 187.3 | ₹7,810.41 |
| 2 | Providing and laying charges for laying of stone solling duly hand packed in trenches | 4.12 | Cum | 1,105.05 | ₹4,552.81 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 11.89 | Cum | 5,733.6 | ₹68,172.5 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 48.79 | Sqm | 286.35 | ₹13,971.02 |
| 5 | 12 mm thick pluster in 1:6 Mix cement mortar | 32.53 | Sqm | 266.2 | ₹8,659.49 |
| 6 | Providing and laying of GSB/Nallah Muck with carriage and compaction by RR | 22.01 | Cum | 1,200 | ₹26,412 |
| 7 | Supplying stacking and Laying of WBM with specified quirry stone (63-45) mm and consolidation with power road roller of 8-10 tone capacity with carriage upto 35 Kms | 5.95 | Cum | 2,649.31 | ₹15,763.39 |
| 8 | Supplying stacking and laying of Screening/stone dust over road pavement with carriage upto 20 Kms | 0.89 | Cum | 1,500 | ₹1,335 |
| 9 | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc: Stone Agg. for an average lead of 20 Km | 10.7 | Cum | 409.94 | ₹4,386.36 |
| 10 | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc:Sand Agg. for an average lead of 10 Km | 5.35 | Cum | 279.04 | ₹1,492.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1096512.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .