Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC NO 9 11 MIG TNEB NEW VANAVIL FLATS AYAPAKKAM CHENNAI 600 077 | CHENNAI | CHENNAI | TAMIL NADU | 600077 | ₹8.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.4 LRejected-Finance | ₹9.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹10.0 LRejected-Finance | ₹10.0 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | RAKENGINEERING L1 | R.S.S.ENTERPRISES L3 | THIRUMURUGAN ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Sweeping and mopping of the office floors (Flooring with ceramic/marble/granite tiles) steps, staircases, handrails with scented cleaning agentsincluding clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed], Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc., complete. | 8,800 | M2 | 1.26 ₹11,088 | 1.26 ₹11,088 | 1.12 ₹9,856 |
| 2.00 | Sweeping and mopping of the office lobby such as cash collection center (Flooring with ceramic/marble /granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers, debris, daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed], Staircase, hand rails, doors, windows, blinds, Name boards, Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc., complete. | 1,32,000 | M2 | 0.91 ₹1.2 L | 0.9 ₹1.2 L | 0.81 ₹1.1 L |
| 3.00 | Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (3 times in a day). Toilet floors ( includes cleaning of wall tiles & doors / ventilators, removal of cobweb) | 72,600 | M2 | 4 ₹2.9 L | 4 ₹2.9 L | 4 ₹2.9 L |
| 4.00 | Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (3 times in a day). Water closets (IWC / EWC) | 5,500 | Nos. | 10 ₹55,000 | 12.5 ₹68,750 | 11.1 ₹61,050 |
| 5.00 | Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (3 times in a day) Urinals cleaning & providing scented urinal screen, coloured naphthalene balls) | 8,800 | Nos. | 8 ₹70,400 | 10 ₹88,000 | 8.9 ₹78,320 |
| 6.00 | Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (3 times in a day)Washbasins | 5,500 | Nos. | 8.5 ₹46,750 | 8.5 ₹46,750 | 7.5 ₹41,250 |
| 7.00 | Anti Termite spraying using chemical emulsion chloropyrifos 20% EC mixed with water will be sprayed at the ratio of 1:19 for 5 litres mixed solution per 100 M2 once in 3 months to control termite, cockroaches, mites, silver fish, cloth moth, spider, ants etc., wooden portions will be mixed with cocentrated chemicals or with kerosene and as directed by the engineer at site (4 operations per year) | 7,928 | M2 | 1.5 ₹11,892 | 3.84 ₹30,443.52 | 3.41 ₹27,034.48 |
| 8.00 | Mosquito control for the entire building (3rd floor) shall be carriedout once in a fort-night and as directed by the engineer at site (24 services per year) | 47,568 | M2 | 0.25 ₹11,892 | 0.32 ₹15,221.76 | 0.28 ₹13,319.04 |
| 9.00 | General Disinfestations work for the control of cockroaches and other insects (spread of any virus) in office area, once in 3 months using approved disinfectants (4 services per year) | 7,928 | M2 | 0.1 ₹792.80 | 0.28 ₹2,219.84 | 0.25 ₹1,982 |
| 10.00 | Replacement of damaged or worn out plumbing fixtures with necessary adaptors. The rate includes the cost of all materials, labour, lead, lift etc., complete using the ISI Brand. 15mm dia CP taps ( Short Body) | 10 | Nos. | 286 ₹2,860 | 286 ₹2,860 | 254 ₹2,540 |
Tender Value
₹10.6 L
EMD Value
₹10,600
Closing Date
17 Feb 2026, 2:00 pmClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2026_EB_652189_1
OT-042/25-26 of SE/GCC-I/CNI
Open Tender
Civil Works
120 days
Guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,600
Yes
16 May 2026
6 Feb 2026
18 Feb 2026
6 Feb 2026
17 Feb 2026
6 Feb 2026
Sweeping and mopping of the office floors (Flooring with ceramic/marble/granite tiles) steps, staircases, handrails with scented cleaning agentsincluding clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed], Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc., complete.
Sweeping and mopping of the office lobby such as cash collection center (Flooring with ceramic/marble /granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers, debris, daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed], Staircase, hand rails, doors, windows, blinds, Name boards, Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc., complete.
Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (3 times in a day). Toilet floors ( includes cleaning of wall tiles & doors / ventilators, removal of cobweb)
Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (3 times in a day). Water closets (IWC / EWC)
Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (3 times in a day) Urinals cleaning & providing scented urinal screen, coloured naphthalene balls)
Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. (3 times in a day)Washbasins
Anti Termite spraying using chemical emulsion chloropyrifos 20% EC mixed with water will be sprayed at the ratio of 1:19 for 5 litres mixed solution per 100 M2 once in 3 months to control termite, cockroaches, mites, silver fish, cloth moth, spider, ants etc., wooden portions will be mixed with cocentrated chemicals or with kerosene and as directed by the engineer at site (4 operations per year)
Mosquito control for the entire building (3rd floor) shall be carriedout once in a fort-night and as directed by the engineer at site (24 services per year)
General Disinfestations work for the control of cockroaches and other insects (spread of any virus) in office area, once in 3 months using approved disinfectants (4 services per year)
Replacement of damaged or worn out plumbing fixtures with necessary adaptors. The rate includes the cost of all materials, labour, lead, lift etc., complete using the ISI Brand. 15mm dia CP taps ( Short Body)
Replacement of damaged or worn out plumbing fixtures with necessary adaptors. The rate includes the cost of all materials, labour, lead, lift etc., complete using the ISI Brand. 15/12 mm CP pressing cock
Replacement of damaged or worn out plumbing fixtures with necessary adaptors. The rate includes the cost of all materials, labour, lead, lift etc., complete using the ISI Brand. 20mm dia GM Valve
Replacement of damaged or worn out plumbing fixtures with necessary adaptors. The rate includes the cost of all materials, labour, lead, lift etc., complete using the ISI Brand. 25mm dia GM Valve
Replacement of damaged or worn out plumbing fixtures with necessary adaptors. The rate includes the cost of all materials, labour, lead, lift etc., complete using the ISI Brand. Urinal spreader
Replacement of damaged or worn out plumbing fixtures with necessary adaptors. The rate includes the cost of all materials, labour, lead, lift etc., complete using the ISI Brand. Spindle
Replacement of damaged or worn out plumbing fixtures with necessary adaptors. The rate includes the cost of all materials, labour, lead, lift etc., complete using the ISI Brand. Water Waste line hose
Replacement of damaged or worn out Electrical fixtures and accessories with internal wriring if any. The rate includes the cost of all materials, labour, lead, lift etc., complete using the approved quality with guarantee. 40W 4 feet LED fitting with LED
Replacement of damaged or worn out Electrical fixtures and accessories with internal wriring if any. The rate includes the cost of all materials, labour, lead, lift etc., complete using the approved quality with guarantee. 24W LED squre type surface fittings.
Replacement of damaged or worn out Electrical fixtures and accessories with internal wriring if any. The rate includes the cost of all materials, labour, lead, lift etc., complete using the approved quality with guarantee. 5 Amps flush type switch
Replacement of damaged or worn out Electrical fixtures and accessories with internal wriring if any. The rate includes the cost of all materials, labour, lead, lift etc., complete using the approved quality with guarantee. 16 Amps flush type switch
Supply and fixing of the following electrical fittings and accessories with internal wiring if any. The rate includes the cost of all materials, labour, lead, lift etc., complete using the approved quality with guarantee (As per SOR). Call Bell/ Buzzer 6mm suitable for AC/DC
Supply and fixing of the following electrical fittings and accessories with internal wiring if any. The rate includes the cost of all materials, labour, lead, lift etc., complete using the approved quality with guarantee (As per SOR). AC Ceiling Fan Complete 1400 mm (56") Sweep with 300mm Down Rod (without Regulator)
Maintenance of plumbing & sanitary lines, WWTP, Sludge pit at building area buildings including cost of all materials, Labour, lead, lift, etc., complete as directed by the Engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_782037.xls
BOQ • 0.30 MB
OT042.pdf
Tender Documents • 0.70 MB
Download all tender documents and submit your bid