Tender Value
Refer Docs
EMD Value
₹7,200
Closing Date
1 Aug 2026, 2:00 pmClosed
EE
S/O
Laying of 300 mm dia Sewer Line 20 Mtr with Contruction of 01nos M.H.10 feet deep and repair of 1 M/H. near furniture Market in Heeraganj, in ward 49 , KANPUR
2026_DOLBU_1172173_5
JalKal / 1777 / EE Zone 4 /
Open Tender
Miscellaneous Works
Percentage
30 days
Jal Kal Vibhag Kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Jal Kal Vibhag
₹7,200
25 Jul 2026
25 Jul 2026
1 Aug 2026
25 Jul 2026
1 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of CC Road & including sorting out & stacking of serviciable materials including Supply of lab, T&P all Comp. For Sewer Line 250 mm dia | 30.25 | m² | 404.6 | ₹12,239.15 |
| 2 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated eartf into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth upto a distance of 30 mts. From the foundation trenches etc. all complete as per direction of site I/C. | 54.75 | m³ | 291.89 | ₹15,980.98 |
| 3 | For sewer Line 300 mm dia 1.5 mtr to 3.00 mtr | 54.75 | m³ | 366.1 | ₹20,043.98 |
| 4 | Dismenteling of old damaged 250 mm NP-2 including supply of Lab, T&P etc all complete, ( As per UPJN SOR IN 2023-24) item no. 3117 | 5.19 | m³ | 4,747.35 | ₹24,638.75 |
| 5 | Providing close Timbering in trenches including supply of Lab, Mat, T&P etc all complete (As per UPJN SOR 2023-24) | 75 | m³ | 1,373.92 | ₹1,03,044 |
| 6 | Making necessary arrangement of barricating with sal ballies fixed horizontally & vertically with provision of red flag, red lantern and night watchmen including supply of all mat. labour, T&P etc. all complete as directed by site I/C. | 42 | rmt | 218 | ₹9,156 |
| 7 | 1st class brick work with 1:4 cement & coarse sand mortor including supply of all mat. labour, T&P etc. all complete as directed by site I/C. | 8 | m³ | 7,202.9 | ₹57,623.2 |
| 8 | 12 mm thick plaster with 1:3 cement & L.Sand mortar with supply of mat, lab T&P etc. all Comp. | 16.56 | m² | 237.17 | ₹3,927.54 |
| 9 | Providing Bier to retain Sewage water etc. all comp. | 6 | Nos. | 450 | ₹2,700 |
| 10 | RCC work with cement, C. sand, & 30 mm Gauge appd. Stone ballast in Proportion of 1:1:5:3 in Slab including Supply of Mat, lab, T&P etc. all comp. | 0.36 | m³ | 11,278.57 | ₹4,060.29 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
5.pdf
Tender Documents • 1.70 MB
BOQ_2201731.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .