Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.2 LAdmitted-Fee/PreQual/Technical/Finance | -20.60% | ₹19.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹22.9 L+₹3.7 L (19.3%)Admitted-Fee/PreQual/Technical/Finance | -5.25% | ₹22.9 L+₹3.7 L (19.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹22.9 L+₹3.8 L (19.6%)Admitted-Fee/PreQual/Technical/Finance | -5.00% | ₹22.9 L+₹3.8 L (19.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.1 L
EMD Value
₹72,450
Closing Date
31 Aug 2026, 4:30 pmClosed
Executive Engineer Irrigation Division Anantnag
Office of the EXEN ID Anantnag
Dalwatch Ladi-Construction of RCC channel and toe protection work by way of crates at RD 620 mtrs to 720 mtrs
2026_IFC_320375_2
E-NIT No. 12 of 2026-27
Open Tender
Civil Works
Percentage
40 days
ID Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer Irrigation Division Anantnag
₹72,450
9 Sept 2026
11 Aug 2026
1 Sept 2026
11 Aug 2026
31 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 337.08 | Cum | 592.9 | ₹1,99,854.73 |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 30 cm girth upto and including 60 cm girth. | 50 | No. | 379.05 | ₹18,952.5 |
| 3 | Dumping stone including cost of stones. In Horizontal on level | 24.28 | Cum | 1,133.9 | ₹27,531.09 |
| 4 | Hand-packing stones in wire-crates; excluding cost of crates and including cost of stones | 103.3 | Cum | 1,267.15 | ₹1,30,896.6 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 18.38 | Cum | 5,202.9 | ₹95,629.3 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level .1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 22.85 | Cum | 7,788.4 | ₹1,77,964.94 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 116.06 | Cum | 6,591.25 | ₹7,64,980.48 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-mechanically Treated bars of grade Fe-500D or more. | 1,714 | Kg | 123.2 | ₹2,11,164.8 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 557.13 | Sqm | 286.35 | ₹1,59,534.18 |
| 10 | Supply and fixing of 4mm dia B.A wire woven crates with lid /binding wire. (4"x4" mesh) as per ISI specification including all carriages ( manual /Mechanical) up to site of work complete Job | 4,608 | Sft | 21 | ₹96,768 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1064912.xls
BOQ • 0.28 MB
datecorrin12.pdf
PDF • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .