| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-Finance 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹4.1 L+₹1,885 (0.46%)Accepted-Finance 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 2 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹5,700
Closing Date
25 Feb 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS II De watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier III and O/H of sludge disposal pump during AOH 2021 22
2021_EB_197503_1
SE / M-I / MTPS-I / CA / OT. 407 / 2020-21
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹5,700
Yes
3 Mar 2021
19 Feb 2021
26 Feb 2021
19 Feb 2021
25 Feb 2021
19 Feb 2021
Amount
Charges for de-watering of clarifier, mixing the mud / fine sludge deposits with water while de-watering in clarifier of size 18 M radius x 6.5 M depth
Charges for removing sludge and other foreign particles from the clarifier of size 18 M x 6.5 M depth
Charges for cleaning the algae deposits on the side walls of both inner and outer rings of clarifier and bottom surface with coir/wire brush. Applying and cleaning with bleaching powder on both side walls of inner ring & outer rings and also at bottom surface in clarifier – III including Bleaching powder, ( Bleaching powder under contractor scope )
Charges for de-watering of sludge disposal pit, removal of sludge from sludge disposal pit, and also tunnel pipes from clarifier to sludge pit. Cleaning of algae deposits with coir / wire brush, and applying & cleaning with bleaching powder on inside walls of sludge pit, flash mixing chamber. ( Bleaching powder under contractor scope )
Charges for removing the rust and old paint from the structure immersed in the water and above the water level exposed to atmosphere , RW line, inlet and outlet and tunnel vent valves exposed to atmosphere of clarifier – III
Charges for painting with one coat of rust convertor (Impodex / Impodor), one coat of epoxy red oxide primer and one coat of epoxy high build coal tar one over the other with proper intervals for clarifier structures immersed in the water and above the water level exposed to atmosphere and structure frame inside flash mixing chamber of unit – III and RW line , inlet and out let valves and tunnel vent valves and clarifier inner and outer ring fabricated sun shield roof structures and man hole door frames. (Required quantities of Rust convertor-64.4 liter, Epoxy red oxide primer-70.9 liter, Epoxy high built coal tar/Sea green/gray -121.9 liter, thinner-29.9 liter etc are of contractors scope)
Charges for dismantling and reassembling of roofing the G.I. corrugated sheet over the fabricated M.S. structural truss including cost of materials such as G.I. J – bolt & nut, cup washer of size 150 mm length with bituminous washer
Overhauling of 200 /150 mm size NRV & Gate valve of sludge disposal pump and Gate valves of cold & Hot water Tunnel Vent in Cooling Water system including dismantling of vent pipe , complete dismantling the valve, Lapping the valve disc & seat area , renewal of spares , Gland Packing and rubber gasket and assembling including cost of consumables and charges for T&Ps Etc. (Cost of gasket and gland packing are to be borne by the contractor.
Charges for overhauling of Sludge disposal pump includes dismantling of pump components, cleaning, inspection and renewal of worn-out parts and reassembling.
Complete alignment & checking the operation of clarifier sludge disposal pumps motor, sludge disposal pumps and its suction & delivery pipe lines and its150 mm gate valves
Charges for cutting and removal of existing deteriorated bolts of scrappers, removing damaged scrapers, cutting of scrapper rubber to required dimension from old conveyor Belt, marking and making holes on scrapper rubber and fixing with new G.I Bolts and nuts in the traction drive and flocculator drive in clarifier-III
Charges for Material cost for Sl.No. 1 to 11
SS ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .