Loading…
Loading…
Tender Value
₹4.9 Cr
EMD Value
₹2.4 L
Closing Date
14 Jul 2026, 5:30 pm6d left
CHIEF MUNCIPAL OFFICER
BHOPAL ROAD WARD 03 SILWANI
Interception and Diversion of Nallahs with STP works of Silwani town under SBM 2.0 2nd CALL
2026_UAD_518140_1
UADD/SILWANI/870/29/06/2026
Open Tender
Civil Works - Others
silwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹2.4 L
Nagar parishad Silwani Office Meeting Hall
30 Jun 2026
30 Jun 2026
16 Jul 2026
30 Jun 2026
14 Jul 2026
30 Jun 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Work of Providing, Laying, Jointing, Testing, Commissioning & Trial run of Dia. 150 mm to 600mm DWC HDPE DI and RCC NP4 Class pipe as per IS 16098 Part 2 and IS 458 with latest amendments having total length 2126 Km with suitable joints including testing of joints, cost of pipes and jointing material complete with up to date amendments.
2.Design, providing, construction, installation, commissioning, and operation of Nature Based composite ECO-Constructed Wetland (ECO-CW) / Phytoremediation based STP of capacity 1 MLD
3.Construction of Interception and Diversion Structure
4.Construction of Drain length 460 m
5.Construction of retaining wall structure 52 meter length
6.Reuse Plan for Liquid Waste Management Scheme considering 20% of treated wastewater to be reused (Silwani Town)
7.Construction of Intermediate Sewage Pumping station with Pump house including Boundary, Approach road, Gate, site development & all necessary electrical and mechanical accessories. Job includes Pumps and required associated works to complete the job in all respect
8.Online Control Monitoring System (Ocms)
9.Providing HT Feeder connection upto Sewage treatment plant. | 1 | Lump-Sum | 4,85,72,000 | ₹4,85,72,000 |
| 2 | Operation and Maintenance Cost For 1st Years | 1 | Lump-Sum | 11,80,000 | ₹11,80,000 |
| 3 | Operation and Maintenance Cost For 2nd Years | 1 | Lump-Sum | 12,50,800 | ₹12,50,800 |
| 4 | Operation and Maintenance Cost For 3rd Years | 1 | Lump-Sum | 13,25,848 | ₹13,25,848 |
| 5 | Operation and Maintenance Cost For 4th Years | 1 | Lump-Sum | 14,05,398.88 | ₹14,05,398.88 |
| 6 | Operation and Maintenance Cost For 5th Years | 1 | Lump-Sum | 14,89,722.81 | ₹14,89,722.81 |
| 7 | Operation and Maintenance Cost For 6th Years | 1 | Lump-Sum | 15,79,106.18 | ₹15,79,106.18 |
| 8 | Operation and Maintenance Cost For 7th Years | 1 | Lump-Sum | 16,73,852.55 | ₹16,73,852.55 |
| 9 | Operation and Maintenance Cost For 8th Years | 1 | Lump-Sum | 17,74,283.71 | ₹17,74,283.71 |
| 10 | Operation and Maintenance Cost For 9th Years | 1 | Lump-Sum | 18,80,740.73 | ₹18,80,740.73 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
tendar_documents.pdf
Tender Documents • 2.11 MB
BOQ_624090.xls
BOQ • 0.28 MB
Annexure.pdf
Additional Documents • 2.37 MB
Download all tender documents and submit your bid